P66 Rodeo Solar

1290 San Pablo Avenue, Rodeo, CA 94572

Plant Summary Information

P66 Rodeo Solar is ranked #184 out of 854 solar farms in California in terms of total annual net electricity generation.

P66 Rodeo Solar generated 7.6 GWh during the 3-month period between November 2025 to February 2026.

Plant NameP66 Rodeo Solar
Utility NameP66 Rodeo Solar
LocationContra Costa County, CA
Initial Operation DateApril 2023
Last Update Feb 2026
Annual Generation 47.5 GWh
Annual Consumption 162.2 k MMBtu
Ranked #4,219 out of 12,637 Power Plants Nationwide
Ranked #1,062 out of 6,487 Solar Power Plants Nationwide
Ranked #483 out of 1,603 California Power Plants
Ranked #184 out of 854 California Solar Power Plants
Fuel Types Solar

Map of P66 Rodeo Solar

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for P66 Rodeo Solar.

Create Your Account Today

Monthly Net Generation for P66 Rodeo Solar

Monthly Plant Fuel Consumption for P66 Rodeo Solar

P66 Rodeo Solar Details

Summary Information
Plant NameP66 Rodeo Solar (68890)
Plant Address1290 San Pablo Avenue, Rodeo, CA 94572
UtilityP66 Rodeo Solar (67136)
Latitude, Longitude38.035, -122.247
Generation Dates on FileMay 2025 to Feb 2026
Initial Operation DateApril 2023
Annual Generation 47.5 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket NumberQF25-690-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 12.00 kV
Energy StorageNo

Generator P66RS Details Operating April 2023

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity30.2 MW
Summer Capacity30.2 MW
Winter Capacity30.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2023
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle60
DC Net Capacity34.6 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity34.6 MW
Virtual Net Metering AgreementNo

P66 Rodeo Solar Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#1052Half Moon Solar PlantFL48.8 GWh
#1053White River Solar 2Alpaugh, CA48.4 GWh
#1054Jacumba Solar FarmJacumba, CA48.3 GWh
#1055RE Rosamond Two LLCRosamond, CA48.3 GWh
#1056Rattler Solar PlantFL48.3 GWh
#1057Wonderful Lost HillsLost Hills, CA48.2 GWh
#1058Cadence Solar Energy CenterMarysville, OH47.9 GWh
#1059Simcoe SolarMountain Home, ID47.8 GWh
#1060Alamo SolarOro Grande, CA47.7 GWh
#1061Maricopa West Solar PV, LLCTaft, CA47.6 GWh
#1063Simon Solar Farm LLCSocial Circle, GA47.5 GWh
#1064Axium Modesto SolarModesto, CA47.4 GWh
#1065Mt. Home Solar 1, LLCPocatello, ID47.2 GWh
#1066Sol Orchard El Centro PVEl Centro, CA47.1 GWh
#1067Portal Ridge Solar B, LLCLancaster, CA46.9 GWh
#1068Windhub Solar A LLCMojave, CA46.6 GWh
#1069Roadrunner SolarSanta Teresa, NM46.5 GWh
#1070Corcoran Solar 3Corcoran, CA46.4 GWh
#1071Bayshore Solar A, LLCLancaster, CA46.4 GWh
#1072Shafter Solar LLCBakersfield, CA46.3 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding P66 Rodeo Solar.

Plant NamePlant LocationAnnual GenerationDistance
American Canyon SolarAmerican Canyon, CA6.9 GWh8.9 mi
Bio-RadHercules, CA3.2 GWh1.7 mi
C&H Sugar PlantCrockett, CA42.9 GWh2.2 mi
CA Dept of Public Health at RichmondRichmond, CA4.0 GWh9.5 mi
CCCSD Wastewater Treatment PlntMartinez, CA20.0 GWh10 mi
Crockett Cogen ProjectCrockett, CA1.3 TWh2.3 mi
Lake HermanBenicia, CA13.0 GWh7.2 mi
Marathon Bay Area CogenMartinez, CA544.1 GWh10.3 mi
Marin Clean Energy Solar OneRichmond, CA21.3 GWh9.4 mi
Martinez RefiningMartinez, CA725.2 GWh7.5 mi
Martinez Sulfuric Acid Regeneration PltMartinez, CA17.3 GWh7.2 mi
PE BerkeleyBerkeley, CA151.3 GWh11.4 mi
Phillips 66 Rodeo RefineryRodeo, CA291.0 GWh0.8 mi
Pixar - EmeryvilleEmeryville, CA7.5 GWh14.1 mi
Power Generation Station (PGS) 2Oakland, CA16.5 GWh14.7 mi
Richmond CogenRichmond, CA979.4 GWh10.1 mi
SFDK SolarVallejo, CA10.2 GWh6.8 mi
Soscol Ferry SolarNapa, CA4.8 GWh14.1 mi
Sutter Home Winery GIRAmerican Canyon, CA1.8 GWh11 mi
Valero Refinery Cogeneration Unit 1Benicia, CA236.7 GWh6.3 mi