Directory of Power Plants in California

List of All California Power Plants

Displaying Results 1 to 100 of 197
Plant NameUtilityLocationBalancing AuthorityAnnual GenerationPlant DateLast UpdateFuel Types
Caribou 2Pacific Gas & Electric Co.Belden, CACalifornia Independent System Operator (CISO)470.8 GWhOct 1958May 2026 Water
CastaicLos Angeles Department of Water & PowerCastaic, CALos Angeles Department of Water and Power (LDWP)129.1 GWhDec 1971May 2026 Water
CaminoSacramento Municipal Util DistCamino, CABalancing Authority of Northern California (BANC)293.9 GWhSep 1963May 2026 Water
Carson Power PlantSacramento Municipal Util DistSacramento, CABalancing Authority of Northern California (BANC)83.0 GWhSep 1995May 2026 Natural Gas : 97.4% Other Biomass Gas : 2.6%
Campbell Power PlantSacramento Municipal Util DistSacramento, CABalancing Authority of Northern California (BANC)504.9 GWhNov 1997May 2026 Natural Gas
Childrens HospitalDTE San Diego COGEN Inc.San Diego, CACalifornia Independent System Operator (CISO)25.8 GWhMar 2000May 2026 Natural Gas : 99.9%
California Institute of TechnologyCalifornia Institute-TechnologyPasadena, CACalifornia Independent System Operator (CISO)59.7 GWhJul 2003May 2026 Natural Gas
Coso Finance PartnersCoso Operating Co LLCInyokern, CACalifornia Independent System Operator (CISO)363.8 GWhJun 1987May 2026 Geothermal
Coso Power DevelopersCoso Operating Co LLCInyokern, CACalifornia Independent System Operator (CISO)315.8 GWhOct 1989May 2026 Geothermal
Chalk Cliff LimitedWCAC Operating CompanyBakersfield, CACalifornia Independent System Operator (CISO)3.0 GWhFeb 1990May 2026 Natural Gas
Calistoga Power PlantGeysers Power Co LLCMiddletown, CACalifornia Independent System Operator (CISO)453.8 GWhFeb 1984May 2026 Geothermal
CP Kelco San Diego PlantCP Kelco US Inc.San Diego, CACalifornia Independent System Operator (CISO)71.2 GWhSep 1983May 2026 Natural Gas
Collierville PowerhouseNorthern California Power AgnyMurphys, CACalifornia Independent System Operator (CISO)396.3 GWhOct 1989May 2026 Water
Cosumnes Power PlantSacramento Municipal Util DistHerald, CABalancing Authority of Northern California (BANC)3.1 TWhJan 2006May 2026 Natural Gas : 98.9% Other Biomass Gas : 1.1%
Colusa Generating StationPacific Gas & Electric Co.Maxwell, CACalifornia Independent System Operator (CISO)2.0 TWhNov 2010May 2026 Natural Gas
Canyon Power PlantCity of Anaheim - (CA)Anaheim, CACalifornia Independent System Operator (CISO)18.8 GWhJul 2011May 2026 Natural Gas
CCCSD Wastewater Treatment PlntCentral Contra Costa Sanitary DistrictMartinez, CACalifornia Independent System Operator (CISO)20.2 GWhNov 1995May 2026 Natural Gas
CSUF TrigenerationCalifornia State University at FullertonFullerton, CACalifornia Independent System Operator (CISO)35.5 GWhSep 2010May 2026 Natural Gas : 81.4% Solar : 18.6%
Central Utilities Plant LAX 2LAX AirportLos Angeles, CALos Angeles Department of Water and Power (LDWP)31.8 GWhSep 2015May 2026 Natural Gas
Carlsbad Energy CenterNRG California Peaker Operations LLCCarlsbad, CACalifornia Independent System Operator (CISO)195.0 GWhNov 2018May 2026 Natural Gas
CA Flats Solar 130, LLCCalifornia Flats Solar 130, LLCShandon, CACalifornia Independent System Operator (CISO)255.2 GWhOct 2017May 2026 Solar
CA Flats Solar 150, LLCArevon Energy, Inc.Shandon, CACalifornia Independent System Operator (CISO)288.3 GWhJan 2019May 2026 Solar
Cuyama Solar, LLCCuyama Solar, LLCCuyama, CACalifornia Independent System Operator (CISO)59.3 GWhOct 2017May 2026 Solar
Colgreen North Shore Solar FarmSunpin Holdings, LLCMecca, CAImperial Irrigation District (IID)138.4 GWhNov 2018May 2026 Solar
Citizens Imperial SolarCitizens Enterprises CorporationCalipatria, CAImperial Irrigation District (IID)60.6 GWhJul 2019May 2026 Solar
Camino Solar HybridAvangrid Power LLCRosamond, CACalifornia Independent System Operator (CISO)133.1 GWhMar 2025May 2026 Solar
Chevron - Lost Hills HybridMN8 Energy LLCLost Hills, CACalifornia Independent System Operator (CISO)64.4 GWhMar 2020May 2026 Solar
ChestnutChestnut Westside LLCLemoore, CACalifornia Independent System Operator (CISO)370.2 GWhNov 2023May 2026 Solar
Central 40Central 40, LLCNewman, CACalifornia Independent System Operator (CISO)76.3 GWhJan 2021May 2026 Solar
Coachella Hills WindTerra-Gen Operating Co-WindPalm Springs, CACalifornia Independent System Operator (CISO)201.2 GWhFeb 2021May 2026 Wind
Chaparral SpringsLeeward Asset Management, LLCRosamond, CACalifornia Independent System Operator (CISO)410.3 GWhMar 2025May 2026 Solar
C&H Sugar PlantC&H Sugar Company IncCrockett, CACalifornia Independent System Operator (CISO)40.5 GWhSep 1957Apr 2026 Purchased Steam
Crockett Cogen ProjectCrockett CogenerationCrockett, CACalifornia Independent System Operator (CISO)1.3 TWhNov 1995Feb 2026 Natural Gas
Caribou 1Pacific Gas & Electric Co.Belden, CACalifornia Independent System Operator (CISO)275.7 GWhMay 1921Dec 2025 Water
Chili BarSacramento Municipal Util DistPlacerville, CACalifornia Independent System Operator (CISO)25.2 GWhFeb 1965Dec 2025 Water
Coleman PHPacific Gas & Electric Co.Anderson, CACalifornia Independent System Operator (CISO)30.9 GWhMay 1979Dec 2025 Water
CrestaPacific Gas & Electric Co.Storrie, CACalifornia Independent System Operator (CISO)341.7 GWhOct 1949Dec 2025 Water
Control GorgeLos Angeles Department of Water & PowerBishop, CALos Angeles Department of Water and Power (LDWP)46.4 GWhMar 1952Dec 2025 Water
CottonwoodLos Angeles Department of Water & PowerLone Pine, CALos Angeles Department of Water and Power (LDWP)3.4 GWhOct 1908Dec 2025 Water
Chicago ParkNevada Irrigation DistrictColfax, CACalifornia Independent System Operator (CISO)65.2 GWhOct 1965Dec 2025 Water
CamancheEast Bay Municipal Util Dist - (CA)Clements & Wallace, CACalifornia Independent System Operator (CISO)17.1 GWhJun 1983Dec 2025 Water
CoachellaImperial Irrigation DistrictCoachella, CAImperial Irrigation District (IID)2.1 GWhMay 1973Dec 2025 Natural Gas : 95.7% Distillate Fuel Oil : 4.3%
Cameron Ridge LLCTerra-Gen Operating Co-WindMojave, CACalifornia Independent System Operator (CISO)148.0 GWhNov 1984Dec 2025 Wind
CE LeathersCalEnergy Operating CorporationCalipatria, CAImperial Irrigation District (IID)270.5 GWhOct 1989Dec 2025 Geothermal
Collins Pine ProjectCollins Pine CoChester, CACalifornia Independent System Operator (CISO)15.3 GWhNov 1985Dec 2025 Wood/Wood Waste Solids
Cove HydroelectricSnow Mountain Hydro LLCBurney, CACalifornia Independent System Operator (CISO)17.4 GWhJan 1990Dec 2025 Water
Coso Energy DevelopersCoso Operating Co LLCInyokern, CACalifornia Independent System Operator (CISO)235.0 GWhNov 1988Dec 2025 Geothermal
Coalinga Cogeneration FacilityAera Energy LLC-CoalingaCoalinga, CACalifornia Independent System Operator (CISO)42.0 GWhMay 1988Dec 2025 Natural Gas
Cymric 31X CogenChevron USA IncMcKittrick, CACalifornia Independent System Operator (CISO)17.5 GWhSep 1988Dec 2025 Natural Gas
Cymric 6Z CogenChevron USA IncMcKittrick, CACalifornia Independent System Operator (CISO)26.6 GWhJun 1986Dec 2025 Natural Gas
Coalinga 25D CogenChevron USA IncCoalinga, CACalifornia Independent System Operator (CISO)38.9 GWhSep 1986Dec 2025 Natural Gas
Cymric 36W CogenChevron USA IncMcKittrick, CACalifornia Independent System Operator (CISO)53.4 GWhSep 1982Dec 2025 Natural Gas
Coram Energy LLC (ECT)Nextera Energy ResourcesTehachapi, CACalifornia Independent System Operator (CISO)21.6 GWhApr 2005Dec 2025 Wind
Coram Energy LLCNextera Energy ResourcesTehachapi, CACalifornia Independent System Operator (CISO)8.8 GWhDec 2004Dec 2025 Wind
Coram Energy LLC (4.5MW)Nextera Energy ResourcesTehachapi, CACalifornia Independent System Operator (CISO)9.0 GWhNov 1985Dec 2025 Wind
CalPeak Power Vaca Dixon Peaker PlantCalPeak Power, LLCVacaville, CACalifornia Independent System Operator (CISO)6.9 GWhMay 2002Dec 2025 Natural Gas
CalPeak Power Panoche Peaker PlantCalPeak Power, LLCFirebaugh, CACalifornia Independent System Operator (CISO)1.9 GWhNov 2001Dec 2025 Natural Gas
Cuyamaca Peak Energy PlantSan Diego Gas & Electric CoEl Cajon, CACalifornia Independent System Operator (CISO)9.7 GWhApr 2002Dec 2025 Natural Gas
CalPeak Power Enterprise Peaker PlantCalPeak Power, LLCEscondido, CACalifornia Independent System Operator (CISO)2.2 GWhOct 2001Dec 2025 Natural Gas
Chula Vista Energy CenterWellhead Services, IncChula Vista, CACalifornia Independent System Operator (CISO)373.0 MWhApr 2001Dec 2025 Natural Gas
Creed Energy CenterCreed Energy Center LLCSuisun, CACalifornia Independent System Operator (CISO)2.6 GWhDec 2002Dec 2025 Natural Gas
Century Generating FacilityColton Power LPColton, CACalifornia Independent System Operator (CISO)563.0 MWhAug 2001Dec 2025 Natural Gas
Cabazon Wind PartnersShell Wind Energy Inc.Cabazon, CACalifornia Independent System Operator (CISO)107.7 GWhSep 2002Dec 2025 Wind
Clearwater Power PlantCity of Riverside - (CA)Corona, CACalifornia Independent System Operator (CISO)3.5 GWhFeb 2005Dec 2025 Natural Gas
Center HybridSouthern California Edison CoNorwalk, CACalifornia Independent System Operator (CISO)2.0 GWhAug 2007Dec 2025 Natural Gas
CalRenew-1CalRenew-1 LLCMendota, CACalifornia Independent System Operator (CISO)1.9 GWhMar 2010Dec 2025 Solar
CSU Fresno Solar ProjectMMA Fresno Power LPFresno, CACalifornia Independent System Operator (CISO)1.3 GWhNov 2007Dec 2025 Solar
Chuckawalla Valley State PrisonSunE CPA CDC1 LLCBlythe, CACalifornia Independent System Operator (CISO)502.0 MWhMay 2006Dec 2025 Solar
Calabasas Gas to Energy FacilityLos Angeles County SanitationAgoura, CACalifornia Independent System Operator (CISO)31.9 GWhJun 2010Dec 2025 Landfill Gas
California Valley Solar RanchClearway Energy Operating LLCCalifornia Valley, CACalifornia Independent System Operator (CISO)558.7 GWhAug 2012Dec 2025 Solar
Caltech CentralBloom Energy 2009 PPAPasadena, CACalifornia Independent System Operator (CISO)7.7 GWhOct 2010Dec 2025 Natural Gas
Cantua Solar StationPacific Gas & Electric Co.TBD, CACalifornia Independent System Operator (CISO)23.0 GWhMay 2012Dec 2025 Solar
City of Madera WWTPSunE GIL1, LLCMadera, CACalifornia Independent System Operator (CISO)1.7 GWhAug 2009Dec 2025 Solar
Corcoran SolarRWE Clean EnergyCorcoran, CACalifornia Independent System Operator (CISO)22.1 GWhJul 2013Dec 2025 Solar
Cold Canyon 1Toro Energy of California SLOSan Luis Obispo, CACalifornia Independent System Operator (CISO)10.6 GWhJun 2013Dec 2025 Landfill Gas
CSU Northridge PlantCalifornia State University, NorthridgeNorthridge, CALos Angeles Department of Water and Power (LDWP)1.6 GWhNov 2001Dec 2025 Solar
Centinela Solar EnergyArevon Energy, Inc.Calexico, CACalifornia Independent System Operator (CISO)448.6 GWhJun 2013Dec 2025 Solar
Campo Verde SolarSouthern Power CoEl Centro, CACalifornia Independent System Operator (CISO)292.7 GWhSep 2013Dec 2025 Solar
Chuckawalla SolarAltus Power America Management, LLCBlythe, CACalifornia Independent System Operator (CISO)7.3 GWhMay 2012Dec 2025 Solar
City of Hayward WWTPCity of Hayward (CA)Hayward, CACalifornia Independent System Operator (CISO)10.5 GWhOct 2010Dec 2025 Other Biomass Gas : 72.3% Solar : 23.6% Natural Gas : 4.1%
Crown Cooling FacilityFive Crowns IncBrawley, CAImperial Irrigation District (IID)1.5 GWhNov 2011Dec 2025 Solar
Community Solar 1Solar Community I LLCBrawley, CAImperial Irrigation District (IID)15.1 GWhMay 2014Dec 2025 Solar
Cascade SolarCascade Solar LLCJoshua Tree, CACalifornia Independent System Operator (CISO)51.4 GWhDec 2013Dec 2025 Solar
Cloverdale Solar IAltus Power America Management, LLCCloverdale, CACalifornia Independent System Operator (CISO)1.5 GWhMay 2014Dec 2025 Solar
Cottonwood Solar, LLC (Goose Lake)Onward EnergyLost Hills, CACalifornia Independent System Operator (CISO)29.9 GWhApr 2015Dec 2025 Solar
Cottonwood Solar, LLC (City of Corcoran)Onward EnergyCorcoran, CACalifornia Independent System Operator (CISO)20.6 GWhApr 2015Dec 2025 Solar
Calipatria Solar FarmSouthern Power CoCalipatria, CAImperial Irrigation District (IID)36.1 GWhJan 2016Dec 2025 Solar
CSD 2- Freedom HighCleanCapital HoldingsOakley, CACalifornia Independent System Operator (CISO)1.3 GWhJul 2013Dec 2025 Solar
CSD 2 - Heritage HighCleanCapital HoldingsBrentwood, CACalifornia Independent System Operator (CISO)1.7 GWhAug 2013Dec 2025 Solar
CID Solar, LLCOnward EnergyCorcoran, CACalifornia Independent System Operator (CISO)40.7 GWhNov 2014Dec 2025 Solar
California PV Energy at ISD WWTPCalifornia PV Energy LLCOakley, CACalifornia Independent System Operator (CISO)1.9 GWhJul 2014Dec 2025 Solar
City of Soledad Water ReclamationFoundation HA Energy Generation, LLCSoledad, CACalifornia Independent System Operator (CISO)4.2 GWhOct 2014Dec 2025 Wind
Catalina Solar 2, LLCOnward EnergyRosamond, CACalifornia Independent System Operator (CISO)55.4 GWhJul 2015Dec 2025 Solar
City of Tulare Water FacilityCity of Tulare Water Pollution Control - (CA)Tulare, CACalifornia Independent System Operator (CISO)16.3 GWhDec 1990Dec 2025 Natural Gas : 61.0% Other Biomass Gas : 20.1% Solar : 19.0%
Corcoran Solar 2RWE Clean EnergyCorcoran, CACalifornia Independent System Operator (CISO)46.8 GWhApr 2015Dec 2025 Solar
Coronus Adelanto West 1Clean Focus Yield, LLCAdelanto, CACalifornia Independent System Operator (CISO)3.4 GWhDec 2014Dec 2025 Solar
Coronus Adelanto West 2Clean Focus Yield, LLCAdelanto, CACalifornia Independent System Operator (CISO)3.4 GWhDec 2014Dec 2025 Solar
Colton Solar One, LLCColton Solar One, LLCSan Bernardino, CACalifornia Independent System Operator (CISO)4.1 GWhMay 2015Dec 2025 Solar
Colton Solar Two, LLCColton Solar Two, LLCColton, CACalifornia Independent System Operator (CISO)789.0 MWhMar 2015Dec 2025 Solar
Coronal Lost HillsArevon Energy, Inc.Lost Hills, CACalifornia Independent System Operator (CISO)35.4 GWhApr 2015Dec 2025 Solar

Browse Power Plants By California Counties

Figures are based on December 2025 generation numbers.
CountyState RankActive PlantsDec 2025 Generation
Glenn County, CA# 55212.1 GWh
Mendocino County, CA# 54612.3 GWh
Marin County, CA# 53328.1 GWh
Sierra County, CA# 52329.3 GWh
Napa County, CA# 511151.2 GWh
Tehama County, CA# 50752.9 GWh
Santa Cruz County, CA# 49660.8 GWh
Siskiyou County, CA# 48877.3 GWh
San Francisco County, CA# 471079.8 GWh
San Mateo County, CA# 4611131.4 GWh
Yolo County, CA# 4515196.2 GWh
Nevada County, CA# 4412225.0 GWh
San Benito County, CA# 436257.6 GWh
Mariposa County, CA# 422272.7 GWh
Santa Barbara County, CA# 4118300.1 GWh
Lassen County, CA# 409337.3 GWh
Humboldt County, CA# 3910442.1 GWh
Merced County, CA# 3833484.8 GWh
Trinity County, CA# 375488.3 GWh
Calaveras County, CA# 366502.3 GWh
Mono County, CA# 359597.8 GWh
Amador County, CA# 348610.5 GWh
Ventura County, CA# 3333672.3 GWh
Lake County, CA# 3210896.8 GWh
Inyo County, CA# 31231.1 TWh
Madera County, CA# 30281.2 TWh
San Joaquin County, CA# 29531.5 TWh
Yuba County, CA# 2851.5 TWh
CountyState RankActive PlantsDec 2025 Generation
El Dorado County, CA# 27151.6 TWh
Tulare County, CA# 26711.6 TWh
Sutter County, CA# 2581.7 TWh
Placer County, CA# 24241.8 TWh
Colusa County, CA# 2342.2 TWh
Plumas County, CA# 22132.2 TWh
Monterey County, CA# 21292.3 TWh
Orange County, CA# 20592.5 TWh
Alameda County, CA# 19512.6 TWh
Stanislaus County, CA# 18252.7 TWh
Tuolumne County, CA# 17232.9 TWh
Solano County, CA# 16413.1 TWh
Butte County, CA# 15253.5 TWh
Santa Clara County, CA# 14763.5 TWh
Kings County, CA# 13584.0 TWh
San Diego County, CA# 121564.3 TWh
Sonoma County, CA# 11265.0 TWh
Sacramento County, CA# 10675.6 TWh
Shasta County, CA# 9467.2 TWh
Fresno County, CA# 81277.3 TWh
Imperial County, CA# 7849.9 TWh
San Bernardino County, CA# 620812.0 TWh
Contra Costa County, CA# 55912.7 TWh
Riverside County, CA# 416214.1 TWh
Los Angeles County, CA# 331916.8 TWh
San Luis Obispo County, CA# 22220.5 TWh
Kern County, CA# 131734.2 TWh