Castaic
37700 Templin Hwy, Castaic, CA 91384Plant Summary Information
Castaic is ranked #57 out of 207 hydroelectric power plants in California in terms of total annual net electricity generation.
Castaic is comprised of 7 generators and generated 90.3 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Castaic |
|---|---|
| Utility Name | Los Angeles Department of Water & Power |
| Location | Los Angeles County, CA |
| Initial Operation Date | January 1972 |
| Last Update | Jun 2026 |
| Annual Generation | 152.5 GWh |
| Annual Consumption | 0 MMBtu |
| Ranked #2,961 out of 13,094 Power Plants Nationwide | |
| Ranked #248 out of 1,309 Water Power Plants Nationwide | |
| Ranked #295 out of 1,607 California Power Plants | |
| Ranked #57 out of 207 California Water Power Plants | |
| Fuel Types | Water |
Map of Castaic
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Castaic.
Monthly Net Generation for Castaic
Monthly Plant Fuel Consumption for Castaic
Castaic Details
| Summary Information | |
|---|---|
| Plant Name | Castaic (392) |
| Plant Address | 37700 Templin Hwy, Castaic, CA 91384 |
| Utility | Los Angeles Department of Water & Power (11208) |
| Latitude, Longitude | 34.58724, -118.65664 |
| Generation Dates on File | Jan 2001 to Jun 2026 |
| Initial Operation Date | January 1972 |
| Annual Generation | 152.5 GWh |
| Fuel Types | Water |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Pyramid Lake California Aquedu |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Generator 7 Details Operating January 1972
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | none |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | none |
| Nameplate Capacity | 56 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 51.5 MW |
| Winter Capacity | 51.5 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 1972 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 1 Details Operating September 1973
| Technology | Hydroelectric Pumped Storage |
|---|---|
| Prime Mover | Pumped Storage |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | none |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | none |
| Nameplate Capacity | 271 MW |
| Nameplate Power Factor | 0.943 |
| Summer Capacity | 270.5 MW |
| Winter Capacity | 270.5 MW |
| Minimum Load | 10 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 1973 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 2 Details Operating July 1974
| Technology | Hydroelectric Pumped Storage |
|---|---|
| Prime Mover | Pumped Storage |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | none |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | none |
| Nameplate Capacity | 271 MW |
| Nameplate Power Factor | 0.943 |
| Summer Capacity | 270.5 MW |
| Winter Capacity | 270.5 MW |
| Minimum Load | 10 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 1974 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 3 Details Operating July 1976
| Technology | Hydroelectric Pumped Storage |
|---|---|
| Prime Mover | Pumped Storage |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | none |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | none |
| Nameplate Capacity | 271 MW |
| Nameplate Power Factor | 0.943 |
| Summer Capacity | 270.5 MW |
| Winter Capacity | 270.5 MW |
| Minimum Load | 10 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 1976 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 5 Details Operating December 1977
| Technology | Hydroelectric Pumped Storage |
|---|---|
| Prime Mover | Pumped Storage |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | none |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | none |
| Nameplate Capacity | 271 MW |
| Nameplate Power Factor | 0.943 |
| Summer Capacity | 270.5 MW |
| Winter Capacity | 270.5 MW |
| Minimum Load | 10 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 1977 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 4 Details Operating June 1977
| Technology | Hydroelectric Pumped Storage |
|---|---|
| Prime Mover | Pumped Storage |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | none |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | none |
| Nameplate Capacity | 271 MW |
| Nameplate Power Factor | 0.943 |
| Summer Capacity | 270.5 MW |
| Winter Capacity | 270.5 MW |
| Minimum Load | 10 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 1977 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 6 Details Operating August 1978
| Technology | Hydroelectric Pumped Storage |
|---|---|
| Prime Mover | Pumped Storage |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | none |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | none |
| Nameplate Capacity | 271 MW |
| Nameplate Power Factor | 0.943 |
| Summer Capacity | 270.5 MW |
| Winter Capacity | 270.5 MW |
| Minimum Load | 10 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 1978 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Castaic Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #238 | Cushman 2 | Shelton, WA | 160.5 GWh |
| #239 | Richard B Russell | Elberton, GA | 160.1 GWh |
| #240 | West Point (GA) | West Point, GA | 159.0 GWh |
| #241 | Chilhowee | Tallassee, TN | 157.7 GWh |
| #242 | Eklutna Hydro Project | Palmer, AK | 157.6 GWh |
| #243 | Holt Dam | Tuscaloosa, AL | 156.6 GWh |
| #244 | Saint Marys Falls | Sault Ste. Marie, MI | 156.0 GWh |
| #245 | Colton | Pierrepont, NY | 154.2 GWh |
| #246 | Haas | Balch Camp, CA | 153.3 GWh |
| #247 | Prairie Du Sac | Prairie du Sac, WI | 152.9 GWh |
| #249 | Big Creek 8 | Auberry, CA | 151.8 GWh |
| #250 | Harris Hydro | West Forks, ME | 150.9 GWh |
| #251 | Bankhead Dam | Northport, AL | 150.8 GWh |
| #252 | Lemolo 2 | Toketee Falls, OR | 149.5 GWh |
| #253 | Gauley River Power Partners | Summersville, WV | 149.1 GWh |
| #254 | Terror Lake Microgrid | Kodiak, AK | 147.3 GWh |
| #255 | Carpenter | Hot Springs, AR | 147.2 GWh |
| #256 | School Street | Cohoes, NY | 146.1 GWh |
| #257 | Boone Dam | Kingsport, TN | 145.5 GWh |
| #258 | Butt Valley | Belden, CA | 145.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Castaic.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alamo | Pearblossom, CA | 65.7 GWh | 15.9 mi |
| Alpine Solar | Lancaster, CA | 114.1 GWh | 16.4 mi |
| Ameresco Chiquita Canyon | Castaic, CA | 2.1 GWh | 10.8 mi |
| AV Solar Ranch One | Lancaster, CA | 560.8 GWh | 18.8 mi |
| Berry Placerita Cogen | Santa Clarita, CA | 4.7 GWh | 16.8 mi |
| Gaskell West 1 Solar Facility | Lancaster, CA | 55.6 GWh | 17.8 mi |
| RE Astoria 2 | Rosamond, CA | 185.7 GWh | 19.9 mi |
| RE Garland | Rosamond, CA | 509.7 GWh | 18.1 mi |
| RE Garland A | Rosamond, CA | 56.7 GWh | 18.5 mi |
| RE Gaskell West 2 LLC | Rosamond, CA | 124.2 GWh | 18.1 mi |
| RE Gaskell West 3 LLC | Rosamond, CA | 50.8 GWh | 18.1 mi |
| RE Gaskell West 4 LLC | Rosamond, CA | 47.5 GWh | 17.4 mi |
| RE Gaskell West 5 LLC | Rosamond, CA | 48.0 GWh | 18.1 mi |
| San Francisquito 1 | Saugus, CA | 125.4 GWh | 11.5 mi |
| San Francisquito 2 | Saugus, CA | 33.7 GWh | 8.3 mi |
| SCV Water - Gladbach Water Treatment Plant Phases I and II | Santa Clara, CA | 858.0 MWh | 13.5 mi |
| Sunshine Gas Producers | Sylmar, CA | 132.3 GWh | 19.1 mi |
| Ventura Solar | Fillmore, CA | 6.4 GWh | 19.1 mi |
| W E Warne | Gorman, CA | 211.0 GWh | 10.1 mi |
| Western Antelope Blue Sky Ranch A | Lancaster, CA | 43.0 GWh | 20 mi |