CSUF Trigeneration
800 N St. College, Fullerton, CA 92831Plant Summary Information
CSUF Trigeneration is ranked #117 out of 316 natural gas power plants in California in terms of total annual net electricity generation.
CSUF Trigeneration generated 7.2 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | CSUF Trigeneration |
|---|---|
| Utility Name | California State University at Fullerton |
| Location | Orange County, CA |
| Initial Operation Date | October 2010 |
| Last Update | Jun 2026 |
| Annual Generation | 33.6 GWh |
| Annual Consumption | 342.8 k MMBtu |
| Ranked #4,725 out of 13,094 Power Plants Nationwide | |
| Ranked #1,301 out of 2,208 Natural Gas Power Plants Nationwide | |
| Ranked #573 out of 1,607 California Power Plants | |
| Ranked #117 out of 316 California Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 80.2% Solar : 19.8% |
Map of CSUF Trigeneration
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CSUF Trigeneration.
Monthly Net Generation for CSUF Trigeneration
Monthly Plant Fuel Consumption for CSUF Trigeneration
CSUF Trigeneration Details
| Summary Information | |
|---|---|
| Plant Name | CSUF Trigeneration (58169) |
| Plant Address | 800 N St. College, Fullerton, CA 92831 |
| Utility | California State University at Fullerton (58104) |
| Latitude, Longitude | 33.88064, -117.88656 |
| Generation Dates on File | Jan 2012 to Jun 2026 |
| Initial Operation Date | October 2010 |
| Annual Generation | 33.6 GWh |
| Fuel Types | Natural Gas : 80.2% Solar : 19.8% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Educational Services (611) |
| Sector | Commercial CHP (5) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 66.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | SOUTHERN CALIFORNIA GAS COMPANY |
| Natural Gas Storage | No |
Generator 1 Details Operating October 2010
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 4.6 MW |
| Nameplate Power Factor | 0.97 |
| Summer Capacity | 4.3 MW |
| Winter Capacity | 4.3 MW |
| Minimum Load | 1.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2010 |
| Combined Heat & Power | Yes |
|---|---|
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CPAC Details Operating January 2012
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 0.3 MW |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 2012 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Commercial CHP (5) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 10 |
| DC Net Capacity | 0.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator KHS Details Operating January 2012
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 0.3 MW |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 2012 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Commercial CHP (5) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 10 |
| DC Net Capacity | 0.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator PS4 Details Operating January 2012
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 0.3 MW |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 2012 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Commercial CHP (5) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 10 |
| DC Net Capacity | 0.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator NPS Details Operating December 2016
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2 MW |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2016 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Commercial CHP (5) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 10 |
| DC Net Capacity | 2.2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator SCPS Details Operating December 2016
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1 MW |
| Summer Capacity | 1 MW |
| Winter Capacity | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2016 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Commercial CHP (5) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 10 |
| DC Net Capacity | 1.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator PS5 Details Operating July 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2020 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Commercial CHP (5) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 10 |
| DC Net Capacity | 0.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
CSUF Trigeneration Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1291 | College of New Jersey | Ewing, NJ | 27.8 GWh |
| #1292 | Prairie Creek | Cedar Rapids, IA | 72.1 GWh |
| #1293 | HSCo CHP | Hartford, CT | 27.7 GWh |
| #1294 | Germantown | Germantown, WI | 33.3 GWh |
| #1295 | Illumina Way SD | San Diego, CA | 27.5 GWh |
| #1296 | Hoag Hospital Cogen Plant | Newport Beach, CA | 27.4 GWh |
| #1297 | NCSU CCUP Cogeneration Plant | Raleigh, NC | 28.7 GWh |
| #1298 | Yankee Street | Centerville, OH | 29.0 GWh |
| #1299 | Sowega Power | Baconton, GA | 29.3 GWh |
| #1300 | Alpena Cement Plant | Alpena, MI | 204.0 GWh |
| #1302 | Kennecott Power Plant | Magna, UT | 132.8 GWh |
| #1303 | Equinix Great Oaks Blvd. Fuel Cell | San Jose, CA | 26.8 GWh |
| #1304 | Weston | Rothschild, WI | 3.9 TWh |
| #1305 | King City Power Plant | King City, CA | 26.8 GWh |
| #1306 | University of Rochester | Rochester, NY | 26.8 GWh |
| #1307 | Little Dixie | Centrahoma, OK | 26.8 GWh |
| #1308 | Conemaugh | New Florence, PA | 4.7 TWh |
| #1309 | Eastern Maine Medical Center | Bangor, ME | 26.6 GWh |
| #1310 | Cymric 6Z Cogen | McKittrick, CA | 26.6 GWh |
| #1311 | Danskammer Generating Station | Newburgh, NY | 26.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CSUF Trigeneration.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alticor Inc - Solar Project | Buena Park, CA | 1.4 GWh | 6.3 mi |
| Anaheim Solar Energy Plant | Anaheim, CA | 1.7 GWh | 5.7 mi |
| AT&T Anaheim | Anaheim, CA | 7.5 GWh | 3.5 mi |
| Barre Peaker | Stanton, CA | 5.4 GWh | 7.5 mi |
| Biola University Hybrid | La Mirada, CA | 13.5 GWh | 7.5 mi |
| Blacksand Generating Facility | Brea, CA | 30.5 GWh | 4 mi |
| Brea Expansion Plant | Brea, CA | 244.4 GWh | 4.4 mi |
| Buidling L | Santa Fe Springs, CA | 1.4 GWh | 9.2 mi |
| Canyon Power Plant | Anaheim, CA | 18.9 GWh | 2.1 mi |
| CSUF Nutwood Solar | Fullerton, CA | 2.9 GWh | 0.2 mi |
| CSUF State College | Fullerton, CA | 1.6 GWh | 0.2 mi |
| Freeway Springs | Santa Fe Springs, CA | 2.8 GWh | 8.7 mi |
| Industry MetroLink PV 1 | Industry, CA | 1.4 GWh | 9.2 mi |
| Kaiser East La Palma Ave. Fuel Cell | Anaheim, CA | 17.8 GWh | 3.1 mi |
| Kroger La Habra | La Habra, CA | 1.7 GWh | 4.2 mi |
| Santa Fe Springs Rooftop Solar BLDG H | Santa Fe Springs, CA | 2.4 GWh | 9.3 mi |
| Santa Fe Springs Rooftop Solar BLDG M | Santa Fe Springs, CA | 2.6 GWh | 9.3 mi |
| Stanton Energy Reliability Center Hybrid | Stanton, CA | 2.3 GWh | 7.6 mi |
| Staples La Mirada, CA | La Mirada, CA | 1.5 GWh | 7.5 mi |
| Yorba Linda | Yorba Linda, CA | 9.4 GWh | 4.4 mi |