Pumpjack Solar I
4100 Lokern Rd, McKittrick, CA 93251Plant Summary Information
Pumpjack Solar I is ranked #155 out of 763 solar farms in California in terms of total annual net electricity generation.
Pumpjack Solar I generated 13.3 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Pumpjack Solar I |
---|---|
Utility Name | Duke Energy Renewables Services |
Location | Kern County, CA |
Initial Operation Date | January 2015 |
Last Update | Dec 2022 |
Annual Generation | 51.6 GWh |
Annual Consumption | 187.0 k MMBtu |
Ranked #3,800 out of 11,455 Power Plants Nationwide | |
Ranked #664 out of 5,173 Solar Power Plants Nationwide | |
Ranked #460 out of 1,543 California Power Plants | |
Ranked #155 out of 763 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Pumpjack Solar I, LLC (2013 to 2021) Duke Energy Renewables Services (2022 to 2022) |
Map of Pumpjack Solar I
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pumpjack Solar I.
Monthly Net Generation for Pumpjack Solar I
Pumpjack Solar I Details
Summary Information | |
---|---|
Plant Name | Pumpjack Solar I (59322) |
Plant Address | 4100 Lokern Rd McKittrick, CA 93251 |
Utility | Duke Energy Renewables Services (65411) |
Latitude, Longitude | 35.30556, -119.6225 |
Generation Dates on File | Jan 2015 to Dec 2022 |
Initial Operation Date | January 2015 |
Annual Generation | 51.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating January 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 20 MW |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 26 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Pumpjack Solar I Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Pumpjack Solar I, LLC | 550 S. Caldwell Street, NAS09, Suite 925, Charlotte, NC 28202 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#654 | Bayshore Solar B, LLC | Lancaster, CA | 53.9 GWh |
#655 | Shoreham Solar Commons | Shoreham, NY | 53.6 GWh |
#656 | SR Odom | Moultrie, GA | 53.0 GWh |
#657 | Corcoran Solar 2 | Corcoran, CA | 52.9 GWh |
#658 | CID Solar, LLC | Corcoran, CA | 52.7 GWh |
#659 | Adelanto Solar, LLC | Adelanto, CA | 52.6 GWh |
#660 | Lone Valley Solar Park II LLC | Lucerne Valley, CA | 51.8 GWh |
#661 | Rawhide Prairie Solar Hybrid | Wellington, CO | 51.6 GWh |
#662 | Western Antelope Blue Sky Ranch A | Lancaster, CA | 51.6 GWh |
#663 | Bayshore Solar C, LLC | Lancaster, CA | 51.6 GWh |
#665 | NextEra Westside PV | Five Points, CA | 51.6 GWh |
#666 | Shafter Solar LLC | Bakersfield, CA | 51.3 GWh |
#667 | RE Kent South, LLC | Lemoore, CA | 51.3 GWh |
#668 | Midway Solar Farm III | Calipatria, CA | 51.1 GWh |
#669 | Westmoreland County Solar Project | WARSAW, VA | 51.0 GWh |
#670 | Gaston Solar Power Plant | Cherryville Township, NC | 50.8 GWh |
#671 | Redwood 4 Solar Farm | Edison, CA | 50.8 GWh |
#672 | Delta's Edge Solar | Greenwood, MS | 50.7 GWh |
#673 | Fall River Solar, LLC | Edgemont, SD | 50.7 GWh |
#674 | RE Garland A | Rosamond, CA | 50.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pumpjack Solar I.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ABEC #2 dba West-Star Dairy | Buttonwillow, CA | 8.8 GWh | 15.7 mi |
Berry NMW Cogens | Bakersfield, CA | 74.6 GWh | 0.6 mi |
Castor Solar | Dustin Acres, CA | 3.1 GWh | 14.8 mi |
Cymric 31X Cogen | McKittrick, CA | 41.1 GWh | 4.5 mi |
Cymric 36W Cogen | McKittrick, CA | 50.9 GWh | 5 mi |
Cymric 6Z Cogen | McKittrick, CA | 45.1 GWh | 3 mi |
Dome Project | Fellows, CA | 53.2 GWh | 6.3 mi |
Eagle Creek | Taft, CA | 8.9 GWh | 14.3 mi |
Elk Hills Cogen | Tupman, CA | 31.2 GWh | 13.6 mi |
Elk Hills Power LLC | Tupman, CA | 3.7 TWh | 8.7 mi |
La Paloma Generating Plant | McKittrick, CA | 2.3 TWh | 1.9 mi |
McKittrick Cogen | McKittrick, CA | 84.5 GWh | 2.2 mi |
McKittrick Limited | Bakersfield, CA | 38.0 GWh | 2.4 mi |
Midway Sunset Cogen | Fellows, CA | 166.8 GWh | 5.4 mi |
Rio Bravo Solar 1 LLC | McKittrick, CA | 48.3 GWh | 8.4 mi |
Rio Bravo Solar II LLC | McKittrick, CA | 49.0 GWh | 8.1 mi |
South Belridge Cogeneration Facility | McKittrick, CA | 467.5 GWh | 10.4 mi |
Sunrise Power LLC | Fellows, CA | 3.1 TWh | 7 mi |
Welport Lease Project | McKittrick, CA | 37.2 GWh | 4 mi |
Wonderful Orchards - Belridge | Lost Hills, CA | 12.1 GWh | 15.2 mi |