Imperial Solar Energy Center South
147 Pulliam Rd, Calexico, CA 92231Plant Summary Information
Imperial Solar Energy Center South is ranked #68 out of 816 solar farms in California in terms of total annual net electricity generation.
Imperial Solar Energy Center South generated 62.1 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Imperial Solar Energy Center South |
---|---|
Utility Name | CSOLAR IV South LLC |
Location | Imperial County, CA |
Initial Operation Date | November 2013 |
Last Update | Dec 2024 |
Annual Generation | 264.3 GWh |
Annual Consumption | 961.2 k MMBtu |
Ranked #2,057 out of 12,288 Power Plants Nationwide | |
Ranked #226 out of 6,174 Solar Power Plants Nationwide | |
Ranked #204 out of 1,564 California Power Plants | |
Ranked #68 out of 816 California Solar Power Plants | |
Fuel Types | Solar |
Map of Imperial Solar Energy Center South
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Imperial Solar Energy Center South.
Monthly Net Generation for Imperial Solar Energy Center South
Imperial Solar Energy Center South Details
Summary Information | |
---|---|
Plant Name | Imperial Solar Energy Center South (57490) |
Plant Address | 147 Pulliam Rd, Calexico, CA 92231 |
Utility | CSOLAR IV South LLC (56819) |
Latitude, Longitude | 32.66329, -115.65828 |
Generation Dates on File | Apr 2013 to Dec 2024 |
Initial Operation Date | November 2013 |
Annual Generation | 264.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG11-104-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 56819 Details Operating November 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | CSLR4S_2_SOLAR |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CSLR4S_2_SOLAR |
Nameplate Capacity | 128.9 MW |
Summer Capacity | 128.9 MW |
Winter Capacity | 128.9 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 172.2 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Imperial Solar Energy Center South Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Tenaska CSOLAR South, LLC | 14302 FNB Parkway, Omaha, NE 68154 | 3.00% |
Tenaska CSOLAR South Holdings, LLC | 14302 FNB Parkway, Omaha, NE 68154 | 49.00% |
Tenaska IV South Partners, LLC | 14302 FNB Parkway, Omaha, NE 68154 | 48.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#216 | BPL Files Solar | Itasca, TX | 272.8 GWh |
#217 | Oberon IA | Odessa, TX | 272.5 GWh |
#218 | Ivanpah 2 | Nipton, CA | 283.1 GWh |
#219 | Grant County | Town of Potosi, WI | 270.6 GWh |
#220 | Golden Triangle II | St.Artesia, MS | 266.2 GWh |
#221 | North Fork Solar Project | Snyder, OK | 269.6 GWh |
#222 | Atrisco Solar LLC | Rio Rancho, NM | 269.0 GWh |
#223 | Sunshine Valley Solar | Armagosa, NV | 267.8 GWh |
#224 | Bellflower Solar 1 | Lewisville, IN | 266.3 GWh |
#225 | Dougherty County Solar, LLC | Albany, GA | 265.5 GWh |
#227 | Fence Post Solar Hybrid Project, LLC | Corsicana, TX | 261.1 GWh |
#228 | Bluebell Solar II | Sterling, TX | 262.3 GWh |
#229 | Catalina Solar LLC | Rosamond, CA | 262.2 GWh |
#230 | TS Power Plant | Battle Mountain, NV | 1.5 TWh |
#231 | Antelope Expansion 2 | Lancaster, CA | 260.4 GWh |
#232 | Milford Solar 1 | Milford, UT | 260.4 GWh |
#233 | Resurgence Solar | Boron, CA | 247.5 GWh |
#234 | Ivanpah 3 | Nipton, CA | 270.2 GWh |
#235 | Pearl River Solar Park LLC | Morton, MS | 259.5 GWh |
#236 | Jackpot Solar, LLC | Twin Falls, ID | 258.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Imperial Solar Energy Center South.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Campo Verde Solar | El Centro, CA | 294.7 GWh | 7.4 mi |
Centinela Solar Energy | Calexico, CA | 352.7 GWh | 1.7 mi |
Centinela State Prison | Sacramento, CA | 16.7 GWh | 13.4 mi |
Drew Solar LLC | Calexico, CA | 313.4 GWh | 1.7 mi |
Drop 5 | Calexico, CA | 6.4 GWh | 15.5 mi |
El Centro Hybrid | El Centro, CA | 1.0 TWh | 11.8 mi |
Heber Geothermal | Heber, CA | 384.9 GWh | 8.9 mi |
Heber Solar | Heber, CA | 24.6 GWh | 7.6 mi |
Imperial Solar Energy Center West | Seeley, CA | 373.6 GWh | 10.3 mi |
Imperial Valley Solar, LLC | Calexico, CA | 443.5 GWh | 4.2 mi |
IVC Solar | Imperial, CA | 4.2 GWh | 14.6 mi |
Mount Signal Solar Farm II | Calexico, CA | 408.6 GWh | 1.7 mi |
Mount Signal Solar Farm V | Calexico, CA | 644.7 GWh | 5.4 mi |
Second Imperial Geothermal | Heber, CA | 302.3 GWh | 8 mi |
SEPV Imperial Dixieland East | Imperial, CA | 4.2 GWh | 11.1 mi |
SEPV Imperial Dixieland West | Imperial, CA | 7.8 GWh | 11.5 mi |
Sol Orchard El Centro PV | El Centro, CA | 47.1 GWh | 11.7 mi |
USG 1 | El Centro, CA | 3.0 GWh | 14.6 mi |
USG 2 | El Centro, CA | 1.6 GWh | 14.8 mi |
Wistaria Ranch Solar | Calexico, CA | 296.9 GWh | 2.4 mi |