Rio Bravo Solar 1 LLC
2 Miles NE of Hwy 33 and Lokem, McKittrick, CA 93251Plant Summary Information
Rio Bravo Solar 1 LLC is ranked #149 out of 818 solar farms in California in terms of total annual net electricity generation.
Rio Bravo Solar 1 LLC generated 8.4 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Rio Bravo Solar 1 LLC |
---|---|
Utility Name | Duke Energy Renewables Services |
Location | Kern County, CA |
Initial Operation Date | December 2016 |
Last Update | Dec 2024 |
Annual Generation | 52.3 GWh |
Annual Consumption | 185.3 k MMBtu |
Ranked #3,984 out of 12,312 Power Plants Nationwide | |
Ranked #918 out of 6,191 Solar Power Plants Nationwide | |
Ranked #453 out of 1,568 California Power Plants | |
Ranked #149 out of 818 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Infigen Asset Management LLC (2013 to 2013) Infigen Energy US Development LLC (2014 to 2014) SunPower Corporation, Systems (2015 to 2015) Rio Bravo Solar I, LLC (2016 to 2021) Duke Energy Renewables Services (2022 to 2024) |
Map of Rio Bravo Solar 1 LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Rio Bravo Solar 1 LLC.
Monthly Net Generation for Rio Bravo Solar 1 LLC
Rio Bravo Solar 1 LLC Details
Summary Information | |
---|---|
Plant Name | Rio Bravo Solar 1 LLC (59249) |
Plant Address | 2 Miles NE of Hwy 33 and Lokem, McKittrick, CA 93251 |
Utility | Duke Energy Renewables Services (65411) |
Latitude, Longitude | 35.41611, -119.6825 |
Generation Dates on File | Dec 2016 to Dec 2024 |
Initial Operation Date | December 2016 |
Annual Generation | 52.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator PV1 Details Operating December 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 20 MW |
Summer Capacity | 19.5 MW |
Winter Capacity | 14.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 26 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Rio Bravo Solar 1 LLC Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Leeward Asset Management, LLC | 6688 N. Central Expressway, Suite 500, Dallas, TX 75206 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#908 | Antelope Big Sky Ranch | Lancaster, CA | 54.0 GWh |
#909 | Creston Solar (50 MW) | Creston, IA | 53.9 GWh |
#910 | Barilla Solar | Fort Stockton, TX | 53.7 GWh |
#911 | Aspen Road Solar | Spring Run, PA | 53.5 GWh |
#912 | SEPV Mojave West | Mojave, CA | 53.5 GWh |
#913 | Caden Energix Endless Caverns, LLC | New Market, VA | 53.2 GWh |
#914 | Adelanto Solar, LLC | Adelanto, CA | 53.2 GWh |
#915 | Catalina Solar 2, LLC | Rosamond, CA | 52.8 GWh |
#916 | Gaskell West 1 Solar Facility | Lancaster, CA | 52.6 GWh |
#917 | East Nash PV2 | Spring Hope, NC | 52.5 GWh |
#919 | RE Rosamond One LLC | Rosamond, CA | 52.3 GWh |
#920 | Red Horse III | Wilcox, AZ | 52.2 GWh |
#921 | CED Ducor 2 | Ducor, CA | 52.2 GWh |
#922 | TA-Acacia, LLC | Lancaster, CA | 52.0 GWh |
#923 | CED Ducor 1 | Ducor, CA | 51.9 GWh |
#924 | Shoreham Solar Commons | Shoreham, NY | 51.8 GWh |
#925 | CED Ducor 4 | Ducor, CA | 51.6 GWh |
#926 | Sulphur Springs | Cochise, AZ | 51.5 GWh |
#927 | Cascade Solar | Joshua Tree, CA | 51.5 GWh |
#928 | Solar Oasis LLC | Palmdale, CA | 51.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Rio Bravo Solar 1 LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ABEC #2 dba West-Star Dairy | Buttonwillow, CA | 8.5 GWh | 14.6 mi |
Berry NMW Cogens | Bakersfield, CA | 71.7 GWh | 8.5 mi |
California Valley Solar Ranch | California Valley, CA | 597.7 GWh | 14.7 mi |
Chevron - Lost Hills Hybrid | Lost Hills, CA | 67.7 GWh | 14.1 mi |
Cottonwood Solar, LLC (Goose Lake) | Lost Hills, CA | 31.5 GWh | 13.6 mi |
Cymric 31X Cogen | McKittrick, CA | 20.2 GWh | 3.8 mi |
Cymric 36W Cogen | McKittrick, CA | 59.2 GWh | 3.7 mi |
Cymric 6Z Cogen | McKittrick, CA | 33.3 GWh | 5.3 mi |
Dome Project | Fellows, CA | 47.5 GWh | 14.6 mi |
Elk Hills Cogen | Tupman, CA | 52.8 GWh | 5.3 mi |
La Paloma Generating Plant | McKittrick, CA | 2.1 TWh | 9.8 mi |
McKittrick Cogen | McKittrick, CA | 67.5 GWh | 7 mi |
McKittrick Limited | Bakersfield, CA | 10.4 GWh | 6.8 mi |
Midway Sunset Cogen | Fellows, CA | 222.5 GWh | 13.4 mi |
Pumpjack Solar I | McKittrick, CA | 46.2 GWh | 8.4 mi |
Rio Bravo Solar II LLC | McKittrick, CA | 50.8 GWh | 3 mi |
South Belridge Cogeneration Facility | McKittrick, CA | 473.0 GWh | 2.1 mi |
Welport Lease Project | McKittrick, CA | 35.4 GWh | 4.4 mi |
Wonderful Huller & Shellling | Lost Hills, CA | 3.5 GWh | 12.6 mi |
Wonderful Orchards - Belridge | Lost Hills, CA | 11.9 GWh | 6.9 mi |