Depot Park Solar System
16 Business Park Way, Sacramento, CA 95828Plant Summary Information
Depot Park Solar System is ranked #552 out of 849 solar farms in California in terms of total annual net electricity generation.
Depot Park Solar System generated 490.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Depot Park Solar System |
|---|---|
| Utility Name | Depot Park Solar Farm |
| Location | Sacramento County, CA |
| Initial Operation Date | December 2010 |
| Last Update | Dec 2024 |
| Annual Generation | 3.2 GWh |
| Annual Consumption | 11.3 k MMBtu |
| Ranked #9,336 out of 12,539 Power Plants Nationwide | |
| Ranked #4,264 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #1,251 out of 1,600 California Power Plants | |
| Ranked #552 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Golden State Energy LLC (2013 to 2017) Depot Park Solar Farm (2018 to 2024) |
Map of Depot Park Solar System
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Depot Park Solar System.
Monthly Net Generation for Depot Park Solar System
Depot Park Solar System Details
| Summary Information | |
|---|---|
| Plant Name | Depot Park Solar System (58119) |
| Plant Address | 16 Business Park Way, Sacramento, CA 95828 |
| Utility | Depot Park Solar Farm (62034) |
| Latitude, Longitude | 38.515, -121.39833 |
| Generation Dates on File | Jan 2012 to Dec 2024 |
| Initial Operation Date | December 2010 |
| Annual Generation | 3.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Balancing Authority of Northern California (BANC) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Sacramento Municipal Util Dist (16534) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator DPSS Details Operating December 2010
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 3 MW |
| Summer Capacity | 2.7 MW |
| Winter Capacity | 1 MW |
| Minimum Load | 3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2010 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| East West Fixed Tilt | Yes |
| Other Solar Technology | No |
| Azimuth Angle | 90 |
| DC Net Capacity | 2.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Depot Park Solar System Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #4254 | Shelby Solar Array | Shelby, OH | 3.2 GWh |
| #4255 | Innovative Solar 23 | Kings Mountain, NC | 3.2 GWh |
| #4256 | Washburn Road Solar | Freetown, MA | 3.2 GWh |
| #4257 | County Home Solar Center, LLC | Shelby, NC | 3.2 GWh |
| #4258 | Innovative Solar 14, LLC | Hendersonville, NC | 3.2 GWh |
| #4259 | Henry Miller RD | Dos Palos, CA | 3.2 GWh |
| #4260 | AVI Bakersfield | Bakersfield, CA | 3.2 GWh |
| #4261 | DG Foxborough Elm CSG | Foxborough, MA | 3.2 GWh |
| #4262 | Wallace | Wallace, NC | 3.2 GWh |
| #4263 | Clifton Park Solar 2, LLC | Rexford, NY | 3.2 GWh |
| #4265 | Bashaw Solar CSG 1, LLC | Newbury, MA | 3.2 GWh |
| #4266 | Leominster (MA)-South Street-R&D | Tewksbury, MA | 3.2 GWh |
| #4267 | CED Westfield Solar, LLC | Westfield, MA | 3.2 GWh |
| #4268 | River Bend Solar, LLC (MT) | Reed Point, MT | 3.2 GWh |
| #4269 | Tower Road Solar, LLC CSG | Lee, IL | 3.2 GWh |
| #4270 | Horn | Lancaster, CA | 3.2 GWh |
| #4271 | Snowden River CSG | Columbia, MD | 3.2 GWh |
| #4272 | Oak Leaf - CSG Portfolio (OL 37) | Watkins, CO | 3.2 GWh |
| #4273 | Coyote Ridge Community Solar | Fort Collins, CO | 3.2 GWh |
| #4274 | SCE&G Curie CSG | Hampton, SC | 3.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Depot Park Solar System.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Carson Ice-Gen Project | Sacramento, CA | 80.1 GWh | 5.9 mi |
| CSU Sacramento I | Sacramento, CA | 2.1 GWh | 2.9 mi |
| Department of Justice | Sacramento, CA | 3.9 GWh | 3.5 mi |
| Dept of General Services -FTB | Sacramento, CA | 5.1 GWh | 4.6 mi |
| FAA NorCal TRACON | Mather AFB, CA | 1.6 GWh | 8.2 mi |
| FRV SI Transport Solar LP | Sacramento, CA | 1.4 GWh | 2 mi |
| McClellan (CA) | Sacramento, CA | 3.4 GWh | 9.5 mi |
| Rancho Cordova Medical Offices | Rancho Cordova, CA | 2.0 GWh | 7.2 mi |
| RE Kammerer 1 LLC | Elk Grove, CA | 11.0 GWh | 10.4 mi |
| RE Kammerer 2 LLC | Elk Grove, CA | 11.1 GWh | 10.4 mi |
| RE Kammerer 3 LLC | Elk Grove, CA | 11.0 GWh | 10.4 mi |
| Renew Solar ABC Sacramento LLC | Sacramento, CA | 2.7 GWh | 9.8 mi |
| Sacramento (SMUD) | Sacramento, CA | 2.0 GWh | 5.9 mi |
| Sacramento Fairbain Water Treatment Plan | Sacramento, CA | 961.0 MWh | 2.9 mi |
| Sacramento Point West Medical Offices | Sacramento, CA | 2.1 GWh | 5.8 mi |
| Sacramento Regional County Sanitation PV | Elk Grove, CA | 7.3 GWh | 5.8 mi |
| SCA Cogen 2 | Sacramento, CA | 601.6 GWh | 1.1 mi |
| Solar Star California II LLC | Sacramento, CA | 3.5 GWh | 4.2 mi |
| SPA Cogen 3 | Sacramento, CA | 531.2 GWh | 4.1 mi |
| US GSA - Sacramento | Sacramento, CA | 2.0 GWh | 6 mi |