Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
CST001 McCarthy Fuel Cell | 2016 ESA Project Company, LLC | Milpitas, CA | California Independent System Operator (CISO) | 8.7 GWh | Dec 2018 | Dec 2024 | Natural Gas |
Cloverdale Solar Center | Adapture Renewables, Inc. | Cloverdale, CA | California Independent System Operator (CISO) | 2.1 GWh | Apr 2019 | Dec 2024 | Solar |
Coalinga Cogeneration Facility | Aera Energy LLC-Coalinga | Coalinga, CA | California Independent System Operator (CISO) | 35.9 GWh | May 1988 | Dec 2024 | Natural Gas |
Citizen B | AES Distributed Energy | Mendota, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2015 | Dec 2024 | Solar |
Central Antelope Dry Ranch C | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 33.3 GWh | Apr 2016 | Dec 2024 | Solar |
Chuckawalla Solar | Altus Power America Management, LLC | Blythe, CA | California Independent System Operator (CISO) | 7.1 GWh | May 2012 | Dec 2024 | Solar |
Cloverdale Solar I | Altus Power America Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 2.2 GWh | May 2014 | Dec 2024 | Solar |
Catalina Express | Altus Power America Management, LLC | San Pedro, CA | California Independent System Operator (CISO) | 1.7 GWh | Nov 2020 | Dec 2024 | Solar |
CA Flats Solar 150, LLC | Arevon Energy, Inc. | Shandon, CA | California Independent System Operator (CISO) | 301.6 GWh | Jan 2019 | Apr 2025 | Solar |
Centinela Solar Energy | Arevon Energy, Inc. | Calexico, CA | California Independent System Operator (CISO) | 352.7 GWh | Jun 2013 | Dec 2024 | Solar |
Coronal Lost Hills | Arevon Energy, Inc. | Lost Hills, CA | California Independent System Operator (CISO) | 37.4 GWh | Apr 2015 | Dec 2024 | Solar |
Camino Solar Hybrid | Avangrid Power LLC | Rosamond, CA | California Independent System Operator (CISO) | 12.0 GWh | - | Apr 2025 | Solar |
Calibrant Bakersfield LLC | Bay4 Energy Services, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2022 | Dec 2024 | Solar |
Comcast - Universal City | Bloom Energy | Universal City, CA | California Independent System Operator (CISO) | 7.8 GWh | Aug 2021 | Dec 2024 | Natural Gas |
CalTech - Pasadena | Bloom Energy | Pasadena, CA | California Independent System Operator (CISO) | 6.8 GWh | Feb 2016 | Dec 2023 | Natural Gas |
CalTech - Pasadena Wilson Ave | Bloom Energy | Pasadena, CA | California Independent System Operator (CISO) | 10.1 GWh | Nov 2019 | Dec 2024 | Natural Gas |
Caltech Central | Bloom Energy 2009 PPA | Pasadena, CA | California Independent System Operator (CISO) | 8.7 GWh | Oct 2010 | Dec 2024 | Natural Gas |
CalTech - Pasadena (PPA) | Bloom Energy 2009 PPA | Pasadena, CA | California Independent System Operator (CISO) | 8.7 GWh | Feb 2016 | Dec 2024 | Natural Gas |
Case Vander Eyk, Jr Dairy Solar | Bravo REC Management LLC | Pixley, CA | California Independent System Operator (CISO) | 2.2 GWh | Sep 2023 | Dec 2024 | Solar |
C&H Sugar Plant | C&H Sugar Company Inc | Crockett, CA | California Independent System Operator (CISO) | 34.2 GWh | Sep 1957 | Apr 2025 | Purchased Steam |
CalCity Solar 1 | CalCity Solar 1, LLC | California City, CA | California Independent System Operator (CISO) | 7.9 GWh | Oct 2019 | Dec 2024 | Solar |
CE Leathers | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 70.6 GWh | Oct 1989 | Dec 2024 | Geothermal |
CA Flats Solar 130, LLC | California Flats Solar 130, LLC | Shandon, CA | California Independent System Operator (CISO) | 233.3 GWh | Oct 2017 | Apr 2025 | Solar |
California Institute of Technology | California Institute-Technology | Pasadena, CA | California Independent System Operator (CISO) | 59.6 GWh | Jul 2003 | Apr 2025 | Natural Gas |
Chowchilla II | California Power Holdings LLC | Chowchilla, CA | California Independent System Operator (CISO) | 16.5 GWh | May 2001 | Dec 2024 | Natural Gas |
California PV Energy at ISD WWTP | California PV Energy LLC | Oakley, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2014 | Dec 2024 | Solar |
CA Dept of Public Health at Richmond | California PV Energy LLC | Richmond, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2016 | Dec 2024 | Solar |
CSUF Trigeneration | California State University at Fullerton | Fullerton, CA | California Independent System Operator (CISO) | 38.0 GWh | Sep 2010 | Apr 2025 | Natural Gas : 82.1% Solar : 17.9% |
CSU Northridge Plant | California State University, Northridge | Northridge, CA | Los Angeles Department of Water and Power (LDWP) | 865.0 MWh | Nov 2001 | Dec 2024 | Solar |
CalPeak Power Vaca Dixon Peaker Plant | CalPeak Power, LLC | Vacaville, CA | California Independent System Operator (CISO) | 3.5 GWh | May 2002 | Dec 2024 | Natural Gas |
CalPeak Power Panoche Peaker Plant | CalPeak Power, LLC | Firebaugh, CA | California Independent System Operator (CISO) | 10.5 GWh | Nov 2001 | Dec 2024 | Natural Gas |
CalPeak Power Border Peaker Plant | CalPeak Power, LLC | San Diego, CA | California Independent System Operator (CISO) | 14.8 GWh | Oct 2001 | Dec 2024 | Natural Gas |
CalPeak Power Enterprise Peaker Plant | CalPeak Power, LLC | Escondido, CA | California Independent System Operator (CISO) | 6.1 GWh | Oct 2001 | Dec 2024 | Natural Gas |
CalRenew-1 | CalRenew-1 LLC | Mendota, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2010 | Dec 2024 | Solar |
CamChino Leasing LLC | CamChino Leasing LLC | Chino, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 1987 | Dec 2024 | Natural Gas |
Carson Cogeneration | Carson Cogeneration Co | Carson, CA | California Independent System Operator (CISO) | 29.1 GWh | Nov 1989 | Aug 2024 | Natural Gas |
Cascade Solar | Cascade Solar LLC | Joshua Tree, CA | California Independent System Operator (CISO) | 51.5 GWh | Dec 2013 | Dec 2024 | Solar |
Chestnut | Castanea Project LLC | Lemoore, CA | California Independent System Operator (CISO) | 387.2 GWh | Nov 2023 | Apr 2025 | Solar : 95.5% |
Castle Rock Vineyards | Castle Rock Cooling | Delano, CA | California Independent System Operator (CISO) | 1.7 GWh | Aug 2010 | Dec 2024 | Solar |
CA Manteca 730 Spreckels Ave | Catalyze Manteca 730 Spreckels Avenue Microgrid LLC | Manteca, CA | California Independent System Operator (CISO) | 323.0 MWh | Aug 2024 | Dec 2024 | Solar |
CA Jurupa Valley 3251 De Forest Circle | Catalyze Mira Loma 3251 De Forest Circle Microgrid LLC | Jurupa Valley, CA | California Independent System Operator (CISO) | 4.7 GWh | Mar 2024 | Dec 2024 | Solar |
CD4 | CD4 | Mammoth Lakes, CA | California Independent System Operator (CISO) | 276.9 GWh | Jun 2022 | Dec 2024 | Geothermal |
Central 40 | Central 40, LLC | Newman, CA | California Independent System Operator (CISO) | 61.2 GWh | Jan 2021 | Apr 2025 | Solar |
Central Antelope Dry Ranch B LLC | Central Antelope Dry Ranch B, LLC | Lancaster, CA | California Independent System Operator (CISO) | 6.7 GWh | Aug 2017 | Dec 2024 | Solar |
Central CA Fuel Cell 1 | Central CA Fuel Cell 1 | Tulare, CA | California Independent System Operator (CISO) | 17.4 GWh | Apr 2018 | Dec 2024 | Natural Gas |
CCCSD Wastewater Treatment Plnt | Central Contra Costa Sanitary District | Martinez, CA | California Independent System Operator (CISO) | 16.4 GWh | Nov 1995 | Apr 2025 | Natural Gas |
Chaffey College Rancho Cucamonga Campus | Chaffey Community College District | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 6.6 GWh | Jan 2017 | Dec 2024 | Solar |
Cymric 36W Cogen | Chevron USA Inc | McKittrick, CA | California Independent System Operator (CISO) | 59.2 GWh | Sep 1982 | Dec 2024 | Natural Gas |
Coalinga 25D Cogen | Chevron USA Inc | Coalinga, CA | California Independent System Operator (CISO) | 42.3 GWh | Sep 1986 | Dec 2024 | Natural Gas |
Cymric 6Z Cogen | Chevron USA Inc | McKittrick, CA | California Independent System Operator (CISO) | 33.3 GWh | Jun 1986 | Dec 2024 | Natural Gas |
Cymric 31X Cogen | Chevron USA Inc | McKittrick, CA | California Independent System Operator (CISO) | 20.2 GWh | Sep 1988 | Dec 2024 | Natural Gas |
Citizens Imperial Solar | Citizens Enterprises Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 46.2 GWh | Jul 2019 | Apr 2025 | Solar |
Canyon Power Plant | City of Anaheim - (CA) | Anaheim, CA | California Independent System Operator (CISO) | 62.1 GWh | Jul 2011 | Apr 2025 | Natural Gas |
City of Hayward WWTP | City of Hayward | Hayward, CA | California Independent System Operator (CISO) | 11.3 GWh | Oct 2010 | Dec 2024 | Other Biomass Gas : 60.4% Solar : 27.7% Natural Gas : 12.0% |
City of Palo Alto | City of Palo Alto | Palo Alta, CA | California Independent System Operator (CISO) | 20.6 MWh | Feb 2002 | Dec 2023 | Natural Gas |
Clearwater Power Plant | City of Riverside - (CA) | Corona, CA | California Independent System Operator (CISO) | 10.3 GWh | Feb 2005 | Dec 2024 | Natural Gas |
Coronus Adelanto West 2 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.3 GWh | Dec 2014 | Dec 2024 | Solar |
Coronus Adelanto West 1 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.3 GWh | Dec 2014 | Dec 2024 | Solar |
CSD 2- Freedom High | CleanCapital Holdings | Oakley, CA | California Independent System Operator (CISO) | 1.4 GWh | Jul 2013 | Dec 2024 | Solar |
CSD 2 - Heritage High | CleanCapital Holdings | Brentwood, CA | California Independent System Operator (CISO) | 1.9 GWh | Aug 2013 | Dec 2024 | Solar |
California Valley Solar Ranch | Clearway Energy Operating LLC | California Valley, CA | California Independent System Operator (CISO) | 597.7 GWh | Aug 2012 | Dec 2024 | Solar |
Collins Pine Project | Collins Pine Co | Chester, CA | California Independent System Operator (CISO) | 10.3 GWh | Nov 1985 | Dec 2024 | Wood/Wood Waste Solids |
Century Generating Facility | Colton Power LP | Colton, CA | California Independent System Operator (CISO) | 651.0 MWh | Aug 2001 | Dec 2023 | Natural Gas |
Colton Solar One, LLC | Colton Solar One, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 3.0 GWh | May 2015 | Dec 2024 | Solar |
Colton Solar Two, LLC | Colton Solar Two, LLC | Colton, CA | California Independent System Operator (CISO) | 1.1 GWh | Mar 2015 | Dec 2024 | Solar |
Columbia Solar Energy, LLC | Columbia Solar Energy LLC | Pittsburg, CA | California Independent System Operator (CISO) | 18.7 GWh | Sep 2015 | Dec 2024 | Solar |
CED Avenal | Consolidated Edison Development Inc. | Avenal, CA | California Independent System Operator (CISO) | 9.7 GWh | Dec 2016 | Dec 2024 | Solar |
Corcoran Solar | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 34.6 GWh | Jul 2013 | Dec 2024 | Solar |
Corcoran Solar 3 | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 46.4 GWh | Jan 2016 | Dec 2024 | Solar |
CED Ducor 1 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 51.9 GWh | Nov 2016 | Dec 2024 | Solar |
Corcoran Solar 2 | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 45.6 GWh | Apr 2015 | Dec 2024 | Solar |
CED Ducor 2 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 52.2 GWh | Nov 2016 | Dec 2024 | Solar |
CED Ducor 4 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 51.6 GWh | Nov 2016 | Dec 2024 | Solar |
CED Ducor 3 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 39.1 GWh | Nov 2016 | Dec 2024 | Solar |
Coso Energy Developers | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 244.2 GWh | Nov 1988 | Dec 2024 | Geothermal |
Coso Power Developers | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 305.2 GWh | Oct 1989 | Apr 2025 | Geothermal |
Coso Finance Partners | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 381.5 GWh | Jun 1987 | Apr 2025 | Geothermal |
Covanta Stanislaus Energy | Covanta Stanislaus Inc | Crows Landing, CA | California Independent System Operator (CISO) | 61.9 GWh | Aug 1988 | Dec 2024 | Non-biogenic Municipal Solid Waste : 50.0% Biogenic Municipal Solid Waste : 40.9% Distillate Fuel Oil : 9.1% |
CP Kelco San Diego Plant | CP Kelco US Inc. | San Diego, CA | California Independent System Operator (CISO) | 76.4 GWh | Sep 1983 | Apr 2025 | Natural Gas |
Creed Energy Center | Creed Energy Center LLC | Suisun, CA | California Independent System Operator (CISO) | 6.3 GWh | Dec 2002 | Dec 2024 | Natural Gas |
Crockett Cogen Project | Crockett Cogeneration | Crockett, CA | California Independent System Operator (CISO) | 1.2 TWh | Nov 1995 | Apr 2025 | Natural Gas |
Crystal Farms Local Solar | Crystal Farms Local Solar, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 10.1 GWh | Oct 2023 | Dec 2024 | Solar |
CSUCI Site Authority | CSUCI Site Authority | Camarillo, CA | California Independent System Operator (CISO) | 2.6 GWh | Feb 1988 | Sep 2024 | Natural Gas |
Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 59.5 GWh | Oct 2017 | Apr 2025 | Solar |
CID Solar (CA) | DG California Solar LLC | Corcoran, CA | California Independent System Operator (CISO) | 3.9 GWh | Aug 2019 | Dec 2024 | Solar |
Childrens Hospital | DTE San Diego COGEN Inc. | San Diego, CA | California Independent System Operator (CISO) | 26.3 GWh | Mar 2000 | Apr 2025 | Natural Gas |
Camanche | East Bay Municipal Util Dist | Clements & Wallace, CA | California Independent System Operator (CISO) | 31.7 GWh | Jun 1983 | Dec 2024 | Water |
CSP Los Angeles | Ecoplexus, Inc | Lancaster, CA | California Independent System Operator (CISO) | 5.6 GWh | Sep 2022 | Dec 2024 | Solar |
Camp San Luis Obispo | Ecoplexus, Inc | San Luis Obispo, CA | California Independent System Operator (CISO) | 158.0 MWh | Jul 2024 | Nov 2024 | Solar |
CA Institute for Women | Ecoplexus, Inc | Chino, CA | California Independent System Operator (CISO) | 2.2 GWh | Jan 2020 | Dec 2024 | Solar |
Centinela State Prison | Ecoplexus, Inc | Sacramento, CA | Imperial Irrigation District (IID) | 16.7 GWh | Nov 2019 | Dec 2024 | Solar |
Calipatria State Prison | Ecoplexus, Inc | Calipatria, CA | Imperial Irrigation District (IID) | 16.5 GWh | Nov 2019 | Dec 2024 | Solar |
Catalina Solar LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 262.2 GWh | Nov 2012 | Dec 2024 | Solar |
Cascade Energy Storage, LLC | Engie North America | Stockton, CA | California Independent System Operator (CISO) | 4.9 GWh | Aug 2024 | Apr 2025 | Electricity used for energy storage |
Crown Cooling Facility | Five Crowns Inc | Brawley, CA | Imperial Irrigation District (IID) | 982.0 MWh | Nov 2011 | Dec 2024 | Solar |
CA - Madera USD - Madera South HS | Forefront Power, LLC | Madera, CA | California Independent System Operator (CISO) | 462.0 MWh | Aug 2023 | Dec 2023 | Solar |
Cabrillo College | Forefront Power, LLC | Aptos, CA | California Independent System Operator (CISO) | 13.0 MWh | Nov 2023 | Dec 2023 | Solar |
CA-DGS-California Men's Colony | Forefront Power, LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 4.6 GWh | Apr 2023 | Dec 2024 | Solar |
CA-Ventura Co CCD-Oxnard College Canopy | Forefront Power, LLC | Ventura, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2022 | Dec 2024 | Solar |
CA - Ventura Co CCD - Moorpark College | Forefront Power, LLC | Moorpark, CA | California Independent System Operator (CISO) | 4.5 GWh | Jul 2023 | Dec 2024 | Solar |
Browse Power Plants By California Counties
Figures are based on April 2025 generation numbers.County | State Rank | Active Plants | Apr 2025 Generation |
---|---|---|---|
Kern County, CA | # 1 | 311 | 34.0 TWh |
Los Angeles County, CA | # 2 | 307 | 20.7 TWh |
San Luis Obispo County, CA | # 3 | 22 | 20.6 TWh |
Riverside County, CA | # 4 | 159 | 14.3 TWh |
San Bernardino County, CA | # 5 | 203 | 13.4 TWh |
Contra Costa County, CA | # 6 | 56 | 13.4 TWh |
Imperial County, CA | # 7 | 84 | 9.7 TWh |
Fresno County, CA | # 8 | 109 | 8.1 TWh |
Shasta County, CA | # 9 | 46 | 7.2 TWh |
Sacramento County, CA | # 10 | 64 | 6.4 TWh |
Sonoma County, CA | # 11 | 26 | 5.2 TWh |
San Diego County, CA | # 12 | 150 | 5.0 TWh |
Santa Clara County, CA | # 13 | 74 | 4.4 TWh |
Kings County, CA | # 14 | 57 | 4.1 TWh |
Butte County, CA | # 15 | 25 | 3.8 TWh |
Monterey County, CA | # 16 | 29 | 3.7 TWh |
Orange County, CA | # 17 | 59 | 3.2 TWh |
Solano County, CA | # 18 | 40 | 3.0 TWh |
Tuolumne County, CA | # 19 | 23 | 3.0 TWh |
Colusa County, CA | # 20 | 3 | 2.9 TWh |
Stanislaus County, CA | # 21 | 25 | 2.6 TWh |
Alameda County, CA | # 22 | 46 | 2.4 TWh |
San Joaquin County, CA | # 23 | 45 | 2.3 TWh |
Placer County, CA | # 24 | 23 | 2.1 TWh |
Plumas County, CA | # 25 | 13 | 2.0 TWh |
Sutter County, CA | # 26 | 8 | 1.8 TWh |
Yuba County, CA | # 27 | 5 | 1.7 TWh |
El Dorado County, CA | # 28 | 15 | 1.5 TWh |
County | State Rank | Active Plants | Apr 2025 Generation |
---|---|---|---|
Inyo County, CA | # 29 | 23 | 1.2 TWh |
Tulare County, CA | # 30 | 68 | 1.0 TWh |
Madera County, CA | # 31 | 28 | 994.0 GWh |
Lake County, CA | # 32 | 10 | 921.2 GWh |
Ventura County, CA | # 33 | 32 | 828.4 GWh |
Mono County, CA | # 34 | 9 | 785.9 GWh |
Amador County, CA | # 35 | 8 | 666.5 GWh |
Calaveras County, CA | # 36 | 6 | 613.6 GWh |
Trinity County, CA | # 37 | 5 | 573.8 GWh |
Humboldt County, CA | # 38 | 10 | 480.9 GWh |
Merced County, CA | # 39 | 30 | 418.2 GWh |
Lassen County, CA | # 40 | 9 | 341.0 GWh |
San Benito County, CA | # 41 | 6 | 332.7 GWh |
Santa Barbara County, CA | # 42 | 18 | 327.1 GWh |
Mariposa County, CA | # 43 | 2 | 299.7 GWh |
Siskiyou County, CA | # 44 | 8 | 242.5 GWh |
Yolo County, CA | # 45 | 15 | 222.2 GWh |
Nevada County, CA | # 46 | 12 | 207.0 GWh |
San Mateo County, CA | # 47 | 10 | 133.4 GWh |
San Francisco County, CA | # 48 | 10 | 85.0 GWh |
Tehama County, CA | # 49 | 7 | 59.7 GWh |
Santa Cruz County, CA | # 50 | 6 | 56.2 GWh |
Napa County, CA | # 51 | 9 | 49.2 GWh |
Sierra County, CA | # 52 | 3 | 31.1 GWh |
Marin County, CA | # 53 | 3 | 19.0 GWh |
Glenn County, CA | # 54 | 2 | 18.7 GWh |
Mendocino County, CA | # 55 | 5 | 12.3 GWh |