CSD 2- Freedom High

1050 Neroly Road, Oakley, CA 95037

Plant Summary Information

CSD 2- Freedom High is ranked #734 out of 817 solar farms in California in terms of total annual net electricity generation.

CSD 2- Freedom High generated 227.0 MWh during the 3-month period between September 2024 to December 2024.

Plant NameCSD 2- Freedom High
Utility NameCleanCapital Holdings
LocationContra Costa County, CA
Initial Operation DateAugust 2013
Last Update Dec 2024
Annual Generation 1.4 GWh
Annual Consumption 4.9 k MMBtu
Ranked #11,019 out of 12,299 Power Plants Nationwide
Ranked #5,745 out of 6,182 Solar Power Plants Nationwide
Ranked #1,459 out of 1,566 California Power Plants
Ranked #734 out of 817 California Solar Power Plants
Fuel Types Solar
Previous Operators Borrego Solar Systems Inc (2013 to 2014)
Ahana Renewables, LLC (2015 to 2021)
CleanCapital Holdings (2022 to 2024)

Map of CSD 2- Freedom High

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CSD 2- Freedom High.

Create Your Account Today

Monthly Net Generation for CSD 2- Freedom High

2002001501501001005050002014201420152015201620162017201720182018201920192020202020212021202220222023202320242024
Download SVG
Download PNG
Download CSV

CSD 2- Freedom High Details

Summary Information
Plant NameCSD 2- Freedom High (59129)
Plant Address1050 Neroly Road, Oakley, CA 95037
UtilityCleanCapital Holdings (65164)
Latitude, Longitude37.96972, -121.71944
Generation Dates on FileAug 2013 to Dec 2024
Initial Operation DateAugust 2013
Annual Generation 1.4 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket NumberQF13-591-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co (14328) CA
Grid Voltage 0.48 kV / 0.28 kV
Energy StorageNo

Generator 57449 Details Operating August 2013

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipWholly Owned by Other Entity
Nameplate Capacity0.9 MW
Summer Capacity0.9 MW
Winter Capacity0.9 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateAugust 2013
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Solar Details
Fixed TiltYes
Azimuth Angle182
Tilt Angle15
DC Net Capacity1.1 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity1.1 MW
Virtual Net Metering AgreementNo

CSD 2- Freedom High Plant Owners

Owner NameAddressOwnership
GLC-(CA) CSD 2, LLC2500 Venture Oaks Way, Sacramento, CA 95833100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#5735GSPP Onyx New Brunswick LLCNew Brunswick, NJ1.4 GWh
#5736Tioga Solar Morris County 1 LLCMorristown, NJ1.4 GWh
#5737Novel Jewison Solar CSGJanesville, MN1.4 GWh
#5738Heller 400MEdison Township, NJ1.4 GWh
#5739Barneveld SolarBarneveld, NY1.4 GWh
#5740ValdostaValdosta, GA1.4 GWh
#5741Manchester Community College EastManchester, CT1.4 GWh
#5742STAG St. Paul Project CSGSaint Paul, MN1.4 GWh
#5743ALDI DC 2South Windsor, CT1.4 GWh
#5744IKEA Las Vegas 462Las Vegas, NV1.4 GWh
#5746Chuckawalla Valley State PrisonBlythe, CA1.4 GWh
#5747Valley Sanitary District WTP SolarIndio, CA1.4 GWh
#5748Farrington FarmChapel Hill, NC1.4 GWh
#5749265 Pleasant Solar NG, LLCLunenburg, MA1.4 GWh
#5750Dinuba Wastewater Treatment PlantDinuba, CA1.4 GWh
#5751Ellettsville Solar RESEllettsville, IN1.4 GWh
#5752Kapolei Solar Energy ParkKapolei, HI1.4 GWh
#5753GreenvilleGreenville, GA1.4 GWh
#5754Mayberry Solar LLCMt. Airy, NC1.4 GWh
#5755McAllister LandfillPortsmouth, RI1.4 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding CSD 2- Freedom High.

Plant NamePlant LocationAnnual GenerationDistance
Ameresco Keller CanyonBay Point, CA19.1 GWh11.9 mi
Buena Vista Energy LLCByron, CA89.6 GWh11.7 mi
Byron Highway SolarByron, CA13.5 GWh10.1 mi
California PV Energy at ISD WWTPOakley, CA2.0 GWh2.3 mi
Columbia Solar Energy, LLCPittsburg, CA18.7 GWh8.6 mi
CSD 2 - Heritage HighBrentwood, CA1.9 GWh3.8 mi
Delta Energy CenterPittsburg, CA3.0 TWh7.5 mi
EDF Renewable Windfarm V IncBirds Landing, CA20.2 GWh11.9 mi
Gateway Generating StationAntioch, CA2.8 TWh3.9 mi
High Winds LLCBirds Landing, CA233.3 GWh12.5 mi
Kaiser Deer Valley Rd. Fuel CellAntioch, CA11.2 GWh3.1 mi
Los Medanos Energy CenterPittsburg, CA3.1 TWh9.3 mi
Marsh Landing Generating StationAntioch, CA118.9 GWh4.1 mi
Montezuma Wind IIBirds Landing, CA195.7 GWh11.6 mi
Oakley Solar ProjectOakley, CA2.4 GWh2.7 mi
Riverview Energy CenterAntioch, CA21.9 GWh5 mi
Shiloh I Wind ProjectRio Vista, CA389.6 GWh12.6 mi
Shiloh IV Wind Project LLCBirds Landing, CA278.3 GWh13.7 mi
Solano WindRio Vista, CA725.4 GWh10.5 mi
Vasco WindsLivermore, CA223.0 GWh12.4 mi