65080 E Broadway St, Joshua Tree, CA 92252Plant Summary Information
Cascade Solar is ranked #161 out of 852 solar farms in California in terms of total annual net electricity generation.
Cascade Solar generated 9.2 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Cascade Solar |
|---|---|
| Utility Name | Cascade Solar LLC |
| Location | San Bernardino County, CA |
| Initial Operation Date | January 2014 |
| Last Update | Dec 2024 |
| Annual Generation | 51.5 GWh |
| Annual Consumption | 183.6 k MMBtu |
| Ranked #4,089 out of 12,613 Power Plants Nationwide | |
| Ranked #1,001 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #457 out of 1,603 California Power Plants | |
| Ranked #161 out of 852 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Cascade Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cascade Solar.
Monthly Net Generation for Cascade Solar
Monthly Plant Fuel Consumption for Cascade Solar
Cascade Solar Details
| Summary Information | |
|---|---|
| Plant Name | Cascade Solar (58590) |
| Plant Address | 65080 E Broadway St, Joshua Tree, CA 92252 |
| Utility | Cascade Solar LLC (58546) |
| Latitude, Longitude | 34.15722, -116.23444 |
| Generation Dates on File | Jan 2014 to Dec 2024 |
| Initial Operation Date | January 2014 |
| Annual Generation | 51.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF13-676-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 33.00 kV |
| Energy Storage | No |
Generator 1 Details Operating January 2014
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 18.5 MW |
| Summer Capacity | 18.5 MW |
| Winter Capacity | 18.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2014 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 24 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Cascade Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #991 | Rio Bravo Solar 1 LLC | McKittrick, CA | 52.3 GWh |
| #992 | RE Rosamond One LLC | Rosamond, CA | 52.3 GWh |
| #993 | Coldwater River Solar | Coldwater, MI | 52.2 GWh |
| #994 | Red Horse III | Wilcox, AZ | 52.2 GWh |
| #995 | CED Ducor 2 | Ducor, CA | 52.2 GWh |
| #996 | TA-Acacia, LLC | Lancaster, CA | 52.0 GWh |
| #997 | CED Ducor 1 | Ducor, CA | 51.9 GWh |
| #998 | Innovative Solar 47 | Maxton, NC | 51.6 GWh |
| #999 | CED Ducor 4 | Ducor, CA | 51.6 GWh |
| #1000 | Sulphur Springs | Cochise, AZ | 51.5 GWh |
| #1002 | Mountain View Solar | North Las Vegas, NV | 51.4 GWh |
| #1003 | Solar Oasis LLC | Palmdale, CA | 51.3 GWh |
| #1004 | Vega Solar | Los Banos, CA | 51.1 GWh |
| #1005 | Midway Solar Farm III | Calipatria, CA | 50.9 GWh |
| #1006 | Rio Bravo Solar II LLC | McKittrick, CA | 50.8 GWh |
| #1007 | Durrance | Mulberry, FL | 50.4 GWh |
| #1008 | Apex Solar PV Power Project | North Las Vegas, NV | 50.3 GWh |
| #1009 | Poseidon Solar, LLC | Globe, AZ | 50.2 GWh |
| #1010 | Western Antelope Blue Sky B | Lancaster, CA | 50.2 GWh |
| #1011 | RE Gaskell West 4 LLC | Rosamond, CA | 50.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cascade Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Coachella Hills Wind | Palm Springs, CA | 219.3 GWh | 26.2 mi |
| Desert Hot Springs Solar | Desert Hot Springs, CA | 4.8 GWh | 23.4 mi |
| Dillon Wind LLC | North Palm Springs, CA | 142.4 GWh | 23.6 mi |
| East Winds Project | Palm Springs, CA | 7.1 GWh | 25.5 mi |
| Edom Hills Project 1 LLC | Cathedral City, CA | 12.4 GWh | 23 mi |
| Garnet Solar Generation Station I LLC | Palm Springs, CA | 9.0 GWh | 25.5 mi |
| Indigo Energy Facility | North Palm Springs, CA | 24.6 GWh | 24.9 mi |
| Karen Avenue Wind Farm | North Palm Springs, CA | 23.4 GWh | 24.8 mi |
| MCAGCC Cogen Plant | Twentynine Palms, CA | 69.2 GWh | 11.7 mi |
| Mountain View I & II | North Palm Springs, CA | 275.2 GWh | 25 mi |
| North Palm Springs 1A | Palm Springs, CA | 5.2 GWh | 26.1 mi |
| North Palm Springs 4A | Palm Springs, CA | 7.9 GWh | 25.4 mi |
| Phoenix Wind Power LLC | North Palm Springs, CA | 2.8 GWh | 24.5 mi |
| San Gorgonio Westwinds II LLC | North Palm Springs, CA | 124.4 GWh | 25 mi |
| San Gorgonio Windplant WPP1993 | North Palm Springs, CA | 202.0 GWh | 25.5 mi |
| Sentinel Energy Center, LLC | Desert Hot Springs, CA | 140.1 GWh | 24.7 mi |
| SEPV 2 | Twentynine Palms, CA | 2.8 GWh | 4.8 mi |
| SEPV 8 | Twentynine Palms, CA | 32.7 GWh | 4.8 mi |
| SEPV9 Power Plant | Twentynine Palms, CA | 24.3 GWh | 8.6 mi |
| Wagner Wind LLC | Palm Springs, CA | 15.5 GWh | 25.1 mi |