CamChino Leasing LLC
5601 Eucalyptus Ave, Chino, CA 91710Plant Summary Information
CamChino Leasing LLC is ranked #230 out of 316 natural gas power plants in California in terms of total annual net electricity generation.
CamChino Leasing LLC is comprised of 2 generators and generated 1.9 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | CamChino Leasing LLC |
|---|---|
| Utility Name | CamChino Leasing LLC |
| Location | San Bernardino County, CA |
| Initial Operation Date | December 1987 |
| Last Update | Dec 2024 |
| Annual Generation | 6.9 GWh |
| Annual Consumption | 107.8 k MMBtu |
| Ranked #7,454 out of 13,081 Power Plants Nationwide | |
| Ranked #1,654 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #968 out of 1,606 California Power Plants | |
| Ranked #230 out of 316 California Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
| Previous Operator |
OLS Energy-Chino (2013 to 2023) CamChino Leasing LLC (2024 to 2025) |
Map of CamChino Leasing LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CamChino Leasing LLC.
Monthly Net Generation for CamChino Leasing LLC
Monthly Plant Fuel Consumption for CamChino Leasing LLC
CamChino Leasing LLC Details
| Summary Information | |
|---|---|
| Plant Name | CamChino Leasing LLC (50850) |
| Plant Address | 5601 Eucalyptus Ave, Chino, CA 91710 |
| Utility | CamChino Leasing LLC (14265) |
| Latitude, Longitude | 33.98963, -117.68091 |
| Generation Dates on File | Jan 2001 to Dec 2024 |
| Initial Operation Date | December 1987 |
| Annual Generation | 6.9 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | Yes |
| FERC Cogeneration Docket Number | 84-443-000; '91-66-000 |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP CHP (3) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 66.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | SOUTHERN CALIFORNIA GAS COMPANY |
| Natural Gas Storage | No |
Generator GEN1 Details Operating December 1987
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | CIMGEN_7_B1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CIMGEN_7_B1 |
| Nameplate Capacity | 23.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 22.5 MW |
| Winter Capacity | 22.5 MW |
| Minimum Load | 15 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 1987 |
| Combined Heat & Power | Yes |
| Sector Name | IPP CHP (3) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating December 1987
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | No |
| RTO ISO LMP Node Designation | CIMGEN_7_B1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CIMGEN_7_B1 |
| Nameplate Capacity | 7.3 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 6.5 MW |
| Winter Capacity | 6 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 1987 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | IPP CHP (3) |
| Topping Or Bottoming | B |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Fluidized Bed Technology | No |
| Pulverized Coal Technology | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
CamChino Leasing LLC Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1644 | Sierra Nevada Brewing Co Hybrid | Chico, CA | 10.7 GWh |
| #1645 | Equinix San Jose | San Jose, CA | 7.0 GWh |
| #1646 | San Diego Community College | San Diego, CA | 7.0 GWh |
| #1647 | CCSU Fuel Cell Project | New Britain, CT | 7.0 GWh |
| #1648 | Hurricane City Power | Hurricane, UT | 7.0 GWh |
| #1649 | Pixar - Emeryville | Emeryville, CA | 7.0 GWh |
| #1650 | CalTech - Pasadena (PPA) | Pasadena, CA | 7.0 GWh |
| #1651 | Maxim | San Jose, CA | 6.9 GWh |
| #1652 | CalPeak Power Vaca Dixon Peaker Plant | Vacaville, CA | 6.9 GWh |
| #1653 | Intel Santa Clara | Santa Clara, CA | 6.9 GWh |
| #1655 | AES Huntington Beach LLC | Huntington Beach, CA | 6.9 GWh |
| #1656 | Comcast - Universal City | Universal City, CA | 6.9 GWh |
| #1657 | Ingredion Winston Salem | Winston-Salem, NC | 28.8 GWh |
| #1658 | Bos Dairy, LLC | Fair Oaks, IN | 6.8 GWh |
| #1659 | Wellhead Power Panoche | Firebaugh, CA | 6.8 GWh |
| #1660 | Carthage Energy LLC | Carthage, NY | 6.7 GWh |
| #1661 | Herrema Dairy | Fair Oaks, IN | 6.6 GWh |
| #1662 | McPherson 3 | McPherson, KS | 7.5 GWh |
| #1663 | Smith College Central Heating Plant | Northampton, MA | 6.5 GWh |
| #1664 | Midway Peaking LLC | Firebaugh, CA | 6.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CamChino Leasing LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 9150 Hermosa Solar GM | Rancho Cucamonga, CA | 2.8 GWh | 8.6 mi |
| CA Institute for Women | Chino, CA | 2.1 GWh | 3.8 mi |
| CA Jurupa Valley 3251 De Forest Circle | Jurupa Valley, CA | 8.5 GWh | 9.5 mi |
| Chambers 4 - Eastvale DCA2 | Eastvale, CA | 424.0 MWh | 7.3 mi |
| Chambers 4 - Eastvale LGB3 | Eastvale, CA | 3.9 GWh | 7.4 mi |
| Clearwater Power Plant | Corona, CA | 3.5 GWh | 8 mi |
| Gilead Sciences La Verne Rooftop Solar | La Verne, CA | 2.5 GWh | 9.4 mi |
| Industry MetroLink PV 1 | Industry, CA | 1.4 GWh | 9.5 mi |
| Kaiser Ontario | Ontario, CA | 7.7 GWh | 5.1 mi |
| KP Ontario Vineyard Solar | Ontario, CA | 2.7 GWh | 5.1 mi |
| Mira Loma | Mira Loma, CA | 2.2 GWh | 8.4 mi |
| Mira Loma Peaker | Ontario, CA | 1.1 GWh | 7 mi |
| New-Indy Ontario Mill | Ontario, CA | 247.7 GWh | 8.9 mi |
| Oltmans SCE at Champagne | Ontario, CA | 1.6 GWh | 9.4 mi |
| Oltmans SCE at Jurupa | Ontario, CA | 2.4 GWh | 6.4 mi |
| PVN Milliken, LLC | Ontario, CA | 5.1 GWh | 7.4 mi |
| San Antonio Regional Hospital | Upland, CA | 12.7 GWh | 8.1 mi |
| San Antonio West Solar Rooftop | Chino, CA | 2.3 GWh | 2.1 mi |
| SunE- E Philadelphia Ontario | Ontario, CA | 1.5 GWh | 9 mi |
| Terra Francesco | Ontario, CA | 2.2 GWh | 5.5 mi |