Caltech Central
1124 E California St, Pasadena, CA 91106Plant Summary Information
Caltech Central is ranked #224 out of 339 natural gas power plants in California in terms of total annual net electricity generation.
Caltech Central is comprised of 11 generators and generated 2.1 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Caltech Central |
---|---|
Utility Name | Bloom Energy 2009 PPA |
Location | Los Angeles County, CA |
Initial Operation Date | November 2010 |
Last Update | Dec 2024 |
Annual Generation | 8.7 GWh |
Annual Consumption | 61.5 k MMBtu |
Ranked #6,522 out of 12,299 Power Plants Nationwide | |
Ranked #1,605 out of 2,221 Natural Gas Power Plants Nationwide | |
Ranked #901 out of 1,566 California Power Plants | |
Ranked #224 out of 339 California Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Caltech Central
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Caltech Central.
Monthly Net Generation for Caltech Central
Caltech Central Details
Summary Information | |
---|---|
Plant Name | Caltech Central (57460) |
Plant Address | 1124 E California St, Pasadena, CA 91106 |
Utility | Bloom Energy 2009 PPA (56778) |
Latitude, Longitude | 34.1358, -118.1267 |
Generation Dates on File | Nov 2010 to Dec 2024 |
Initial Operation Date | November 2010 |
Annual Generation | 8.7 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 4.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | SOUTHERN CALIFORNIA GAS COMPANY |
Natural Gas Storage | No |
Generator CL00 Details Operating November 2010
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2010 |
---|---|
Planned Retirement | March 2031 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator CL01 Details Operating November 2010
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2010 |
---|---|
Planned Retirement | March 2031 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator CL02 Details Operating November 2010
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2010 |
---|---|
Planned Retirement | March 2031 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator CL03 Details Operating November 2010
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2010 |
---|---|
Planned Retirement | March 2031 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Generator CL04 Details Operating November 2010
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2010 |
---|---|
Planned Retirement | March 2031 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Generator CL05 Details Operating November 2010
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2010 |
---|---|
Planned Retirement | March 2031 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Generator CL06 Details Operating November 2010
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2010 |
---|---|
Planned Retirement | March 2031 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Generator CL07 Details Operating November 2010
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2010 |
---|---|
Planned Retirement | March 2031 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Generator CL08 Details Operating November 2010
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2010 |
---|---|
Planned Retirement | March 2031 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Generator CL09 Details Operating November 2010
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2010 |
---|---|
Planned Retirement | March 2031 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Generator CL10 Details Operating November 2010
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2010 |
---|---|
Planned Retirement | March 2031 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Caltech Central Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1595 | Roll Delano | Delano, CA | 8.9 GWh |
#1596 | Simplot Phosphates | Rock Springs, WY | 98.4 GWh |
#1597 | Trinity College Fuel Cell | Hartford, CT | 8.9 GWh |
#1598 | Hoag Hospital Cogen Plant | Newport Beach, CA | 8.8 GWh |
#1599 | Agua Mansa Power Plant | Colton, CA | 8.8 GWh |
#1600 | NHH003 Clarkson Fuel Cell | Brooklyn, NY | 8.8 GWh |
#1601 | FLEX Gibraltar | Milpitas, CA | 8.7 GWh |
#1602 | CalTech - Pasadena (PPA) | Pasadena, CA | 8.7 GWh |
#1603 | Kaiser Downey | Downey, CA | 8.7 GWh |
#1604 | CST001 McCarthy Fuel Cell | Milpitas, CA | 8.7 GWh |
#1606 | Tulare BioMAT Fuel Cell | Tulare, CA | 13.7 GWh |
#1607 | Ripon Generation Station | Ripon, CA | 8.7 GWh |
#1608 | Dick's Creek | Monroe, OH | 8.7 GWh |
#1609 | Georgia LFG Oak Grove Plant | Winder, GA | 38.7 GWh |
#1610 | Micro Santa Clara | San Jose, CA | 8.6 GWh |
#1611 | Life Technologies Carlsbad | Carlsbad, CA | 8.6 GWh |
#1612 | Charter Dura-Bar | Woodstock, IL | 8.5 GWh |
#1613 | Taylor Farms - Schilling Place | Salinas, CA | 8.5 GWh |
#1614 | Life Technologies - Pleasanton | Pleasanton, CA | 8.5 GWh |
#1615 | Disney Prospect | Los Angeles, CA | 8.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Caltech Central.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Big Bear | Los Angeles, CA | 7.0 GWh | 9.1 mi |
California Institute of Technology | Pasadena, CA | 59.6 GWh | 0.2 mi |
CalTech - Pasadena | Pasadena, CA | 6.8 GWh | 0.2 mi |
CalTech - Pasadena (PPA) | Pasadena, CA | 8.7 GWh | 0.4 mi |
CalTech - Pasadena Wilson Ave | Pasadena, CA | 10.1 GWh | 0.2 mi |
Forever 21 Retail, Inc. | Los Angeles, CA | 1.1 GWh | 6 mi |
Glenarm | Pasadena, CA | 38.5 GWh | 1.5 mi |
Grayson | Glendale, CA | 50.4 GWh | 8.8 mi |
H. Gonzales | Vernon, CA | 178.4 MWh | 10.9 mi |
Irwindale Brew Yard, LLC | Irwindale, CA | 714.0 MWh | 10.8 mi |
Kaiser - LA | Los Angeles, CA | 19.1 GWh | 10 mi |
Lafayette 2 - Internal Services Dept | Los Angeles, CA | 2.6 GWh | 6.7 mi |
Lake One | Burbank, CA | 285.0 MWh | 11.1 mi |
Magnolia Power Project | Burbank, CA | 1.3 TWh | 11.2 mi |
Malburg | Vernon, CA | 362.0 GWh | 10.9 mi |
Metro Support Services Center Solar | Los Angeles, CA | 479.0 MWh | 8 mi |
Occidental College Solar Project | Los Angeles, CA | 1.3 GWh | 4.6 mi |
Puente Hills Energy Recovery | Whittier, CA | 157.5 GWh | 9.7 mi |
Ratkovich Alhambra | Alhambra, CA | 8.0 GWh | 4 mi |
Toyon Power Station | Los Angeles, CA | 6.6 GWh | 10.2 mi |