Caltech Central

1124 E California St, Pasadena, CA 91106

Plant Summary Information

Caltech Central is ranked #215 out of 342 natural gas power plants in California in terms of total annual net electricity generation.

Caltech Central is comprised of 11 generators and generated 2.1 GWh during the 3-month period between September 2024 to December 2024.

Plant NameCaltech Central
Utility NameBloom Energy 2009 PPA
LocationLos Angeles County, CA
Initial Operation DateNovember 2010
Last Update Dec 2024
Annual Generation 8.7 GWh
Annual Consumption 59.0 k MMBtu
Ranked #6,580 out of 12,539 Power Plants Nationwide
Ranked #1,604 out of 2,243 Natural Gas Power Plants Nationwide
Ranked #901 out of 1,600 California Power Plants
Ranked #215 out of 342 California Natural Gas Power Plants
Fuel Types Natural Gas

Map of Caltech Central

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Caltech Central.

Create Your Account Today

Monthly Net Generation for Caltech Central

Caltech Central Details

Summary Information
Plant NameCaltech Central (57460)
Plant Address1124 E California St, Pasadena, CA 91106
UtilityBloom Energy 2009 PPA (56778)
Latitude, Longitude34.1358, -118.1267
Generation Dates on FileNov 2010 to Dec 2024
Initial Operation DateNovember 2010
Annual Generation 8.7 GWh
Fuel Types Natural Gas
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerSouthern California Edison Co (17609) CA
Grid Voltage 4.00 kV
Energy StorageNo
 
Natural Gas Information
Local Distribution Company (LDC)SOUTHERN CALIFORNIA GAS COMPANY
Natural Gas StorageNo

Generator CL00 Details Operating November 2010

TechnologyOther Natural Gas
Prime MoverFuel Cell
OwnershipSingle Owner
Nameplate Capacity0.1 MW
Summer Capacity0.1 MW
Winter Capacity0.1 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2010
Planned RetirementMarch 2031
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Solid Fuel Gasification No
Time From Cold Shutdown To Full Load12H
Multiple FuelsNo

Generator CL01 Details Operating November 2010

TechnologyOther Natural Gas
Prime MoverFuel Cell
OwnershipSingle Owner
Nameplate Capacity0.1 MW
Summer Capacity0.1 MW
Winter Capacity0.1 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2010
Planned RetirementMarch 2031
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Multiple FuelsNo

Generator CL02 Details Operating November 2010

TechnologyOther Natural Gas
Prime MoverFuel Cell
OwnershipSingle Owner
Nameplate Capacity0.1 MW
Summer Capacity0.1 MW
Winter Capacity0.1 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2010
Planned RetirementMarch 2031
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Multiple FuelsNo

Generator CL03 Details Operating November 2010

TechnologyOther Natural Gas
Prime MoverFuel Cell
OwnershipSingle Owner
Nameplate Capacity0.1 MW
Summer Capacity0.1 MW
Winter Capacity0.1 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2010
Planned RetirementMarch 2031
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H

Generator CL04 Details Operating November 2010

TechnologyOther Natural Gas
Prime MoverFuel Cell
OwnershipSingle Owner
Nameplate Capacity0.1 MW
Summer Capacity0.1 MW
Winter Capacity0.1 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2010
Planned RetirementMarch 2031
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H

Generator CL05 Details Operating November 2010

TechnologyOther Natural Gas
Prime MoverFuel Cell
OwnershipSingle Owner
Nameplate Capacity0.1 MW
Summer Capacity0.1 MW
Winter Capacity0.1 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2010
Planned RetirementMarch 2031
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H

Generator CL06 Details Operating November 2010

TechnologyOther Natural Gas
Prime MoverFuel Cell
OwnershipSingle Owner
Nameplate Capacity0.1 MW
Summer Capacity0.1 MW
Winter Capacity0.1 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2010
Planned RetirementMarch 2031
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H

Generator CL07 Details Operating November 2010

TechnologyOther Natural Gas
Prime MoverFuel Cell
OwnershipSingle Owner
Nameplate Capacity0.1 MW
Summer Capacity0.1 MW
Winter Capacity0.1 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2010
Planned RetirementMarch 2031
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H

Generator CL08 Details Operating November 2010

TechnologyOther Natural Gas
Prime MoverFuel Cell
OwnershipSingle Owner
Nameplate Capacity0.1 MW
Summer Capacity0.1 MW
Winter Capacity0.1 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2010
Planned RetirementMarch 2031
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H

Generator CL09 Details Operating November 2010

TechnologyOther Natural Gas
Prime MoverFuel Cell
OwnershipSingle Owner
Nameplate Capacity0.1 MW
Summer Capacity0.1 MW
Winter Capacity0.1 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2010
Planned RetirementMarch 2031
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H

Generator CL10 Details Operating November 2010

TechnologyOther Natural Gas
Prime MoverFuel Cell
OwnershipSingle Owner
Nameplate Capacity0.1 MW
Summer Capacity0.1 MW
Winter Capacity0.1 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2010
Planned RetirementMarch 2031
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H

Caltech Central Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Natural Gas.

RankPlant NamePlant LocationAnnual Generation
#1594Red Hills Generating FacilityAckerman, MS2.3 TWh
#1595Agua Mansa Power PlantColton, CA8.8 GWh
#1596NHH003 Clarkson Fuel CellBrooklyn, NY8.8 GWh
#1597FLEX GibraltarMilpitas, CA8.7 GWh
#1598Ripon Generation StationRipon, CA8.7 GWh
#1599CalTech - Pasadena (PPA)Pasadena, CA8.7 GWh
#1600Charter Dura-BarWoodstock, IL8.7 GWh
#1601Kaiser DowneyDowney, CA8.7 GWh
#1602CST001 McCarthy Fuel CellMilpitas, CA8.7 GWh
#1603Covanta Fairfax EnergyLorton, VA646.5 GWh
#1605Tulare BioMAT Fuel CellTulare, CA13.7 GWh
#1606Dick's CreekMonroe, OH8.7 GWh
#1607Henrietta PeakerLemoore, CA8.6 GWh
#1608Georgia LFG Oak Grove PlantWinder, GA38.7 GWh
#1609Micro Santa ClaraSan Jose, CA8.6 GWh
#1610SEMASS Resource RecoveryWest Wareham, MA569.5 GWh
#1611Life Technologies CarlsbadCarlsbad, CA8.6 GWh
#1612Taylor Farms - Schilling PlaceSalinas, CA8.5 GWh
#1613Life Technologies - PleasantonPleasanton, CA8.5 GWh
#1614Disney ProspectLos Angeles, CA8.5 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Caltech Central.

Plant NamePlant LocationAnnual GenerationDistance
Big BearLos Angeles, CA7.0 GWh9.1 mi
California Institute of TechnologyPasadena, CA40.5 GWh0.2 mi
CalTech - PasadenaPasadena, CA6.8 GWh0.2 mi
CalTech - Pasadena (PPA)Pasadena, CA8.7 GWh0.4 mi
CalTech - Pasadena Wilson AvePasadena, CA10.1 GWh0.2 mi
Forever 21 Retail, Inc.Los Angeles, CA1.1 GWh6 mi
GlenarmPasadena, CA38.5 GWh1.5 mi
GraysonGlendale, CA18.1 GWh8.8 mi
H. GonzalesVernon, CA178.4 MWh10.9 mi
Irwindale Brew Yard, LLCIrwindale, CA517.0 MWh10.8 mi
Kaiser - LALos Angeles, CA19.1 GWh10 mi
Lafayette 2 - Internal Services DeptLos Angeles, CA2.6 GWh6.7 mi
Lake OneBurbank, CA285.0 MWh11.1 mi
Magnolia Power ProjectBurbank, CA1.2 TWh11.2 mi
MalburgVernon, CA326.4 GWh10.9 mi
Metro Support Services Center SolarLos Angeles, CA154.0 MWh8 mi
Occidental College Solar ProjectLos Angeles, CA1.3 GWh4.6 mi
Puente Hills Energy RecoveryWhittier, CA151.3 GWh9.7 mi
Ratkovich AlhambraAlhambra, CA8.0 GWh4 mi
Toyon Power StationLos Angeles, CA6.6 GWh10.2 mi