Coalinga 25D Cogen
39405 South Derrick Ave, Coalinga, CA 93210Plant Summary Information
Coalinga 25D Cogen is ranked #94 out of 342 natural gas power plants in California in terms of total annual net electricity generation.
Coalinga 25D Cogen is comprised of 4 generators and generated 11.4 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Coalinga 25D Cogen |
|---|---|
| Utility Name | Chevron USA Inc |
| Location | Fresno County, CA |
| Initial Operation Date | October 1986 |
| Last Update | Dec 2024 |
| Annual Generation | 42.3 GWh |
| Annual Consumption | 744.7 k MMBtu |
| Ranked #4,284 out of 12,539 Power Plants Nationwide | |
| Ranked #1,148 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #517 out of 1,600 California Power Plants | |
| Ranked #94 out of 342 California Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Coalinga 25D Cogen
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Coalinga 25D Cogen.
Monthly Net Generation for Coalinga 25D Cogen
Coalinga 25D Cogen Details
| Summary Information | |
|---|---|
| Plant Name | Coalinga 25D Cogen (52086) |
| Plant Address | 39405 South Derrick Ave, Coalinga, CA 93210 |
| Utility | Chevron USA Inc (54713) |
| Latitude, Longitude | 36.1556, -120.3972 |
| Generation Dates on File | Jan 2001 to Dec 2024 |
| Initial Operation Date | October 1986 |
| Annual Generation | 42.3 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | Yes |
| FERC Cogeneration Docket Number | 86-662-001 |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Oil and Gas Extraction (211) |
| Sector | Industrial CHP (7) |
| Water Source | Wells |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | Other - See pipeline notes. |
| Pipeline Name |
MOJAVE PIPELINE CO LLC PACIFIC GAS |
| Pipeline Notes | San Joaquin Fuel System; Owned/Operated by Chevron North America Exploration and Production (CNAEP) |
| Natural Gas Storage | No |
Generator TG1 Details Operating October 1986
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DERRICK_6_N003 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | TH_ZP26_GEN-APND |
| Nameplate Capacity | 3.4 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 2.7 MW |
| Winter Capacity | 2.9 MW |
| Minimum Load | 1.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 1986 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator TG2 Details Operating October 1986
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DERRICK_6_N003 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | TH_ZP26_GEN-APND |
| Nameplate Capacity | 3.4 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 2.7 MW |
| Winter Capacity | 2.9 MW |
| Minimum Load | 1.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 1986 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator TG3 Details Operating December 1987
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DERRICK_6_N003 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | TH_ZP26_GEN-APND |
| Nameplate Capacity | 3.4 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 2.7 MW |
| Winter Capacity | 2.9 MW |
| Minimum Load | 1.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 1987 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator TG4 Details Operating December 1987
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DERRICK_6_N003 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | TH_ZP26_GEN-APND |
| Nameplate Capacity | 3.4 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 2.7 MW |
| Winter Capacity | 2.9 MW |
| Minimum Load | 1.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 1987 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Coalinga 25D Cogen Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1138 | Taft 26C Cogen | Taft, CA | 43.4 GWh |
| #1139 | Port Allen (LA) | Port Allen, LA | 43.4 GWh |
| #1140 | Ormond Beach | Oxnard, CA | 43.1 GWh |
| #1141 | U S Alliance Coosa Pines | Coosa Pines, AL | 141.9 GWh |
| #1142 | Soldotna | Soldotna, AK | 42.1 GWh |
| #1143 | Subase Microgrid Project | Groton, CT | 43.1 GWh |
| #1144 | George Birdsall | Colorado Springs, CO | 43.1 GWh |
| #1145 | SJ/SC WPCP | San Jose, CA | 83.5 GWh |
| #1146 | Bucknell University | Lewisburg, PA | 43.6 GWh |
| #1147 | Bayswater Peaking Facility LLC | Far Rockaway, NY | 42.5 GWh |
| #1149 | Louisiana Tech University Power Plant | Ruston, LA | 42.3 GWh |
| #1150 | Marsh Landing Generating Station | Antioch, CA | 41.8 GWh |
| #1151 | Mars Wrigley Confectionery US, LLC | Hackettstown, NJ | 41.7 GWh |
| #1152 | Beaver Dam (PA) | Canton Township, PA | 41.5 GWh |
| #1153 | Erving Paper Mills | Erving, MA | 41.7 GWh |
| #1154 | Oxbow Creek | Factoryville, PA | 41.0 GWh |
| #1155 | Cogeneration 2 | Tucson, AZ | 40.9 GWh |
| #1156 | Hank Nikkels Plant 1 | Anchorage, AK | 41.2 GWh |
| #1157 | Rubart | Ulysses, KS | 40.9 GWh |
| #1158 | California Institute of Technology | Pasadena, CA | 40.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Coalinga 25D Cogen.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Avenal Park | Avenal, CA | 9.5 GWh | 19.7 mi |
| CA-DGS RFP-Pleasant Valley State Prison | Coalinga, CA | 4.0 GWh | 8.2 mi |
| Cantua Solar Station | TBD, CA | 31.2 GWh | 18.9 mi |
| CDCR (CA) - Pleasant Valley State Prison | Coalinga, CA | 2.8 GWh | 9.7 mi |
| CED Avenal | Avenal, CA | 9.7 GWh | 17.6 mi |
| Coalinga Cogeneration Facility | Coalinga, CA | 35.9 GWh | 2.1 mi |
| DSH (CA) - Coalinga State Hospital | Coalinga, CA | 4.6 GWh | 10.1 mi |
| Fifth Standard Solar PV, LLC (Hybrid) | Huron, CA | 317.9 GWh | 16.3 mi |
| Five Points Solar Park | Five Points, CA | 93.3 GWh | 18.3 mi |
| Gates Solar Station | Huron, CA | 31.7 GWh | 15.9 mi |
| Harris Farms Solar Facility | Coalinga, CA | 3.0 GWh | 11.5 mi |
| Huron Solar Station | Huron, CA | 28.8 GWh | 20.5 mi |
| NextEra Westside PV | Five Points, CA | 40.6 GWh | 21.4 mi |
| Sand Drag LLC | Avenal, CA | 28.2 GWh | 20 mi |
| Sun City Project LLC | Avenal, CA | 33.9 GWh | 20 mi |
| Van der Kooi Dairy Solar Array | Riverdale, CA | 3.7 GWh | 22.9 mi |
| West Gates Solar Station | Huron, CA | 19.2 GWh | 14.8 mi |
| Westlands Solar PV Farm | Huron, CA | 33.9 GWh | 18 mi |
| Westside Solar Station | Five Points, CA | 13.9 GWh | 21.6 mi |
| Whitney Point Solar | Five Points, CA | 44.4 GWh | 21 mi |