California PV Energy at ISD WWTP
450 Walnut Meadows Drive, Oakley, CA 94561Plant Summary Information
California PV Energy at ISD WWTP is ranked #663 out of 816 solar farms in California in terms of total annual net electricity generation.
California PV Energy at ISD WWTP generated 275.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | California PV Energy at ISD WWTP |
---|---|
Utility Name | California PV Energy LLC |
Location | Contra Costa County, CA |
Initial Operation Date | August 2014 |
Last Update | Dec 2024 |
Annual Generation | 2.0 GWh |
Annual Consumption | 6.9 k MMBtu |
Ranked #10,347 out of 12,288 Power Plants Nationwide | |
Ranked #5,137 out of 6,174 Solar Power Plants Nationwide | |
Ranked #1,382 out of 1,564 California Power Plants | |
Ranked #663 out of 816 California Solar Power Plants | |
Fuel Types | Solar |
Map of California PV Energy at ISD WWTP
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for California PV Energy at ISD WWTP.
Monthly Net Generation for California PV Energy at ISD WWTP
California PV Energy at ISD WWTP Details
Summary Information | |
---|---|
Plant Name | California PV Energy at ISD WWTP (59283) |
Plant Address | 450 Walnut Meadows Drive, Oakley, CA 94561 |
Utility | California PV Energy LLC (58540) |
Latitude, Longitude | 38.00111, -121.70389 |
Generation Dates on File | Aug 2014 to Dec 2024 |
Initial Operation Date | August 2014 |
Annual Generation | 2.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF14-28 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 20.80 kV |
Energy Storage | No |
Generator W4236 Details Operating August 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Pulverized Coal Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 168 |
Tilt Angle | 30 |
DC Net Capacity | 1.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.2 MW |
Virtual Net Metering Agreement | No |
California PV Energy at ISD WWTP Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5127 | Gilead Foster City Solar Project | Foster City, CA | 1.9 GWh |
#5128 | Ace Solar | Piedmont, SC | 2.0 GWh |
#5129 | Medline Ind. Phase 2 Tracy | Tracy, CA | 2.0 GWh |
#5130 | Bizer Creek | Getzville, NY | 2.0 GWh |
#5131 | USS Wells Creek Solar LLC | Goodhue, MN | 2.0 GWh |
#5132 | Silver City WWTP PV Project | Silver City, NM | 2.0 GWh |
#5133 | Montgomery County Correctional Facility | Boyds, MD | 2.0 GWh |
#5134 | USS KVPV Solar LLC CSG | Fulton, MN | 2.0 GWh |
#5135 | Cenergy - Kiger | Embden, ME | 2.0 GWh |
#5136 | Slayton Solar | Slayton, MN | 2.0 GWh |
#5138 | RC Energy AA LLC Solar Facility | Albuquerque, NM | 2.0 GWh |
#5139 | CUA West Campus - North (CSG) | Washington, DC | 2.0 GWh |
#5140 | USS Webster Solar CSG | Webster, MN | 2.0 GWh |
#5141 | USS Kost Trail Solar CSG | North Branch, MN | 2.0 GWh |
#5142 | Honeysuckle Solar, LLC | Lester Prairie, MN | 2.0 GWh |
#5143 | South Cary WRF Solar Array | Apex, NC | 2.0 GWh |
#5144 | North Juvenile Detention Center Solar | Visalia, CA | 2.0 GWh |
#5145 | East Springfield Solar PV | Springfield, MA | 2.0 GWh |
#5146 | USS Milkweed Solar LLC CSG | Paynesville, MN | 2.0 GWh |
#5147 | Flodquist Community Solar LLC CSG | Lindstrom, MN | 2.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding California PV Energy at ISD WWTP.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Keller Canyon | Bay Point, CA | 19.1 GWh | 12.6 mi |
Buena Vista Energy LLC | Byron, CA | 89.6 GWh | 13.7 mi |
Byron Highway Solar | Byron, CA | 13.5 GWh | 11.6 mi |
Columbia Solar Energy, LLC | Pittsburg, CA | 18.7 GWh | 8.9 mi |
CSD 2 - Heritage High | Brentwood, CA | 1.9 GWh | 6.2 mi |
CSD 2- Freedom High | Oakley, CA | 1.4 GWh | 2.3 mi |
Delta Energy Center | Pittsburg, CA | 2.8 TWh | 7.7 mi |
EDF Renewable Windfarm V Inc | Birds Landing, CA | 20.2 GWh | 10.6 mi |
FPL Energy Montezuma Winds LLC | Birds Landing, CA | 85.4 GWh | 12.3 mi |
Gateway Generating Station | Antioch, CA | 2.8 TWh | 3.2 mi |
High Winds LLC | Birds Landing, CA | 233.3 GWh | 11 mi |
Kaiser Deer Valley Rd. Fuel Cell | Antioch, CA | 11.2 GWh | 5 mi |
Los Medanos Energy Center | Pittsburg, CA | 3.1 TWh | 9.4 mi |
Marsh Landing Generating Station | Antioch, CA | 118.9 GWh | 3.5 mi |
Montezuma Wind II | Birds Landing, CA | 195.7 GWh | 10.2 mi |
Oakley Solar Project | Oakley, CA | 2.4 GWh | 2.4 mi |
Riverview Energy Center | Antioch, CA | 21.9 GWh | 4.8 mi |
Shiloh I Wind Project | Rio Vista, CA | 389.6 GWh | 11.4 mi |
Shiloh IV Wind Project LLC | Birds Landing, CA | 278.3 GWh | 12.5 mi |
Solano Wind | Rio Vista, CA | 697.3 GWh | 8.7 mi |