Brookfield Tehachapi 1
15509 70th St., Mojave, CA 93501Plant Summary Information
Brookfield Tehachapi 1 is ranked #20 out of 110 wind farms in California in terms of total annual net electricity generation.
Brookfield Tehachapi 1 generated 48.9 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Brookfield Tehachapi 1 |
|---|---|
| Utility Name | Coram California Development, L.P. |
| Location | Kern County, CA |
| Initial Operation Date | March 2012 |
| Last Update | Dec 2024 |
| Annual Generation | 276.9 GWh |
| Annual Consumption | 981.8 k MMBtu |
| Ranked #2,054 out of 12,539 Power Plants Nationwide | |
| Ranked #614 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #195 out of 1,600 California Power Plants | |
| Ranked #20 out of 110 California Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operators |
Brookfield Renewable Energy Group (2013 to 2013) Brookfield Energy Marketing LP (2014 to 2014) Coram California Development, L.P. (2015 to 2024) Consolidated Edison Development Inc. (2016 to 2020) |
Map of Brookfield Tehachapi 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brookfield Tehachapi 1.
Monthly Net Generation for Brookfield Tehachapi 1
Brookfield Tehachapi 1 Details
| Summary Information | |
|---|---|
| Plant Name | Brookfield Tehachapi 1 (57962) |
| Plant Address | 15509 70th St., Mojave, CA 93501 |
| Utility | Coram California Development, L.P. (60081) |
| Latitude, Longitude | 35.00833, -118.24139 |
| Generation Dates on File | Apr 2012 to Dec 2024 |
| Initial Operation Date | March 2012 |
| Annual Generation | 276.9 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 12-6 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 60.00 kV |
| Energy Storage | No |
Generator BT1 Details Operating March 2012
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 102 MW |
| Summer Capacity | 102 MW |
| Winter Capacity | 102 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2012 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 34 |
| Turbine Details | |
| Number Of Turbines | 34 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V90-3.0 |
| Design Wind Speed | 18 MPH |
| Wind Quality Class | 1 - High Wind |
| Turbine Hub Height Feet | 278 |
Brookfield Tehachapi 1 Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Brookfield Renewable Energy Group | 75 State Street Suite 2701, Boston, MA 2109 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #604 | Big Level Wind | Hector Township, PA | 281.3 GWh |
| #605 | Lone Tree Wind, LLC | Tiskilwa, IL | 279.2 GWh |
| #606 | Caprock Wind Farm | San Jon, NM | 279.0 GWh |
| #607 | Kossuth County Wind | Lu Verne, IA | 278.8 GWh |
| #608 | Timbermill Wind, LLC | Edenton, NC | 278.6 GWh |
| #609 | Shiloh IV Wind Project LLC | Birds Landing, CA | 278.3 GWh |
| #610 | Rail Splitter Wind Farm | Hopedale, IL | 278.1 GWh |
| #611 | Sagebrush Power Partners | Ellensburg, WA | 277.8 GWh |
| #612 | Green Pastures Wind I | Seymour, TX | 277.5 GWh |
| #613 | Prairie Breeze II | Elgin, NE | 277.4 GWh |
| #615 | Baffin Wind | Sarita, TX | 276.6 GWh |
| #616 | Northwest Ohio Wind | Haviland, OH | 276.4 GWh |
| #617 | Goodnoe Hills | Goldendale, WA | 275.5 GWh |
| #618 | Leaning Juniper | Arlington, OR | 275.2 GWh |
| #619 | Anticline Wind | Casper, WY | 274.8 GWh |
| #620 | Charles City Wind Farm | Charles City, IA | 274.1 GWh |
| #621 | High Plains | Rock River, WY | 274.1 GWh |
| #622 | Twin Ridges Wind Farm | Meyersdale, PA | 273.9 GWh |
| #623 | High Prairie Wind Farm | Queen City, MO | 273.5 GWh |
| #624 | Vantage Wind Energy LLC | Ellensburg, WA | 273.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Brookfield Tehachapi 1.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alta Wind Energy Center II | Mojave, CA | 364.6 GWh | 3.2 mi |
| Alta Wind Energy Center III | Mojave, CA | 363.2 GWh | 3.2 mi |
| Alta Wind Energy Center IV | Mojave, CA | 193.4 GWh | 0.1 mi |
| Alta Wind Energy Center V | Mojave, CA | 288.4 GWh | 0.1 mi |
| Alta Wind VIII | Mojave, CA | 222.0 GWh | 1.3 mi |
| Alta Wind X | Mojave, CA | 379.0 GWh | 4.3 mi |
| Mojave 16/17/18 | Mojave, CA | 73.9 GWh | 2.8 mi |
| Mojave 3/4/5 | Mojave, CA | 132.8 GWh | 3.1 mi |
| Mustang Hills LLC | Mojave, CA | 301.5 GWh | 3.3 mi |
| Oak Creek Energy Systems I | Mojave, CA | 54.5 GWh | 3.2 mi |
| Pinyon Pine I | Mojave, CA | 306.6 GWh | 2.9 mi |
| Pinyon Pine II | Mojave, CA | 233.1 GWh | 1.6 mi |
| RE Camelot LLC | Mojave, CA | 125.1 GWh | 3.4 mi |
| RE Columbia Two, LLC | Mojave, CA | 40.4 GWh | 3.4 mi |
| Rising Tree Wind Farm III | Mojave, CA | 261.4 GWh | 3.6 mi |
| SEPV Mojave West | Mojave, CA | 53.5 GWh | 2.5 mi |
| TPC Windfarms LLC | Mojave, CA | 46.5 GWh | 3 mi |
| Voyager Wind I | Mojave, CA | 413.4 GWh | 3.5 mi |
| Voyager Wind III | Mojave, CA | 141.2 GWh | 3.9 mi |
| Windhub Solar A LLC | Mojave, CA | 46.6 GWh | 2.8 mi |