Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Auwahi Wind Energy Hybrid | Auwahi Wind Energy LLC | Kula, HI | 87.2 GWh | Nov 2012 | Dec 2024 | Wind | |
| Industrial Plant | Alaska Electric Light & Power Co. | Juneau, AK | 19.0 MWh | Oct 2016 | Dec 2024 | Distillate Fuel Oil | |
| Waipio Solar | Waipio PV, LLC | Waipio, HI | (HECO) | 96.6 GWh | Aug 2019 | Feb 2026 | Solar |
| West Loch Solar One | Hawaiian Electric Co Inc | Ewa Beach, HI | (HECO) | 36.5 GWh | Oct 2019 | Dec 2024 | Solar |
| Slana Generating Station | Alaska Power and Telephone Co | Slana, AK | (NA) | 1.4 GWh | Dec 2015 | Dec 2024 | Distillate Fuel Oil |
| Waihonu North Solar | Waihonu North LLC | Mililani, HI | 4.5 GWh | Jun 2016 | Dec 2024 | Solar | |
| Hiilangaay Hydro | Haida Energy, Inc. | Hydaburg, AK | 4.4 GWh | Dec 2020 | Dec 2024 | Water | |
| Biomass to Energy Facility, Kauai | Mahipapa LLC | Koloa, HI | 6.4 GWh | Apr 2014 | Dec 2024 | Agricultural By-Products : 99.8% | |
| Na Pua Makani Wind Project | Na Pua Makani Power Partners LLC | Kahuku, HI | 100.7 GWh | Nov 2020 | Feb 2026 | Wind | |
| Whitman | Ketchikan Public Utilities | Ketchikan, AK | 8.6 GWh | Dec 2014 | Dec 2024 | Water | |
| Delta Wind Farm | Alaska Environmental Power | Delta Junction, AK | (NA) | 3.9 GWh | Aug 2008 | Dec 2024 | Wind |
| JBER Landfill Gas Power Plant | Doyon Utilities, LLC | Anchorage, AK | 42.2 GWh | Jul 2012 | Feb 2026 | Landfill Gas : 94.6% Natural Gas : 5.4% | |
| Eklutna Generation Station | Matanuska Electric Assn Inc | Chugiak, AK | 573.0 GWh | Jan 2015 | Dec 2024 | Natural Gas | |
| KRS I Anahola Solar Hybrid | Kauai Island Utility Cooperative | Anahola, HI | 19.7 GWh | Jul 2015 | Feb 2026 | Solar | |
| KRS II Koloa Solar | Kauai Island Utility Cooperative | Koloa, HI | 18.6 GWh | May 2014 | Feb 2026 | Solar | |
| Kalaeloa Renewable Energy Park | ENI New Energy US Inc | Ewa Beach, HI | 4.3 GWh | Dec 2013 | Dec 2024 | Solar | |
| Allison Creek Hydro | Copper Valley Elec Assn, Inc | Valdez, AK | 18.5 GWh | Sep 2016 | Dec 2024 | Water | |
| Waihonu South Solar | Waihonu South LLC | Mililani, HI | 1.3 GWh | Jun 2016 | Dec 2024 | Solar | |
| HNL Emergency Power Facility | Hawaiian Electric Co Inc | Honolulu, HI | 5.8 GWh | May 2017 | Dec 2024 | Other Biomass Liquids | |
| Aloha Solar Energy Fund 1 PK1 | Altus Power America Management, LLC | Waianae, HI | 6.6 GWh | Feb 2017 | Dec 2024 | Solar | |
| Port Allen Solar | Kaieie Waho Company LLC | Eleele, HI | 8.5 GWh | Nov 2012 | Dec 2024 | Solar | |
| Mauka FIT One | Valta Energy | Kahuku, HI | 3.1 GWh | Sep 2020 | Dec 2024 | Solar | |
| Fire Island Wind | Fire Island Wind LLC | Anchorage, AK | 49.4 GWh | Aug 2012 | Dec 2024 | Wind | |
| Kapolei Solar Energy Park | Altus Power America Management, LLC | Kapolei, HI | (HECO) | 1.4 GWh | Jan 2012 | Dec 2024 | Solar |
| Pearl City Peninsula Solar Park | Altus Power America Management, LLC | Honolulu, HI | (HECO) | 1.2 GWh | Oct 2012 | Dec 2024 | Solar |
| Klawock Power Generation Station | Alaska Power and Telephone Co | Klawock, AK | (NA) | 500.0 MWh | Aug 2017 | Dec 2024 | Distillate Fuel Oil |
| Tyee Lake Hydroelectric Facility | Southeast Alaska Power Agency | Wrangell, AK | (NA) | 126.0 GWh | Jun 1983 | Dec 2024 | Water |
| EE Waianae Solar Project | EE Waianae Solar Project LLC | Waianae, HI | (HECO) | 57.8 GWh | Dec 2016 | Feb 2026 | Solar |
| AES Lawai Solar Hybrid | AES Distributed Energy | Lawai, HI | 39.5 GWh | Nov 2018 | Feb 2026 | Solar | |
| Kihei Solar Farm | South Maui Renewable Resources LLC | Kihei, HI | (HECO) | 352.0 MWh | Apr 2018 | Jun 2024 | Solar |
| Falls Hydro | Eagle Creek Renewable Energy, LLC | Badin, NC | Alcoa Power Generating, Inc. - Yadkin Division (YAD) | 126.5 GWh | Aug 1919 | Dec 2024 | Water |
| High Rock Hydro | Eagle Creek Renewable Energy, LLC | Denton, NC | Alcoa Power Generating, Inc. - Yadkin Division (YAD) | 141.0 GWh | Oct 1927 | Dec 2024 | Water |
| Tuckertown Hydro | Eagle Creek Renewable Energy, LLC | New London, NC | Alcoa Power Generating, Inc. - Yadkin Division (YAD) | 137.6 GWh | Mar 1962 | Dec 2024 | Water |
| Narrows (NC) | Eagle Creek Renewable Energy, LLC | Badin, NC | Alcoa Power Generating, Inc. - Yadkin Division (YAD) | 487.5 GWh | Jun 1917 | Dec 2024 | Water |
| Yuma Cogeneration Associates | Falcon Power Operating Company | Yuma, AZ | Arizona Public Service Company (AZPS) | 17.6 GWh | Feb 1994 | Oct 2025 | Natural Gas |
| Four Corners | Arizona Public Service Co | Fruitland, NM | Arizona Public Service Company (AZPS) | 9.3 TWh | Jun 1969 | Feb 2026 | Bituminous Coal : 99.3% Natural Gas : 0.7% |
| Luke Solar | Arizona Public Service Co | Glendale, AZ | Arizona Public Service Company (AZPS) | 32.2 GWh | May 2015 | Dec 2024 | Solar |
| Novo BioPower Plant | Novo Biopower LLC | Snowflake, AZ | Arizona Public Service Company (AZPS) | 168.1 GWh | May 2008 | Dec 2024 | Wood/Wood Waste Solids : 99.8% |
| Poseidon Wind, LLC | Axium Arizona Renewables, LLC | Herber, AZ | Arizona Public Service Company (AZPS) | 104.0 GWh | Nov 2010 | Feb 2026 | Wind |
| Northwest Regional | WM Renewable Energy LLC | Surprise, AZ | Arizona Public Service Company (AZPS) | 16.6 GWh | Jul 2012 | Dec 2024 | Landfill Gas |
| Solana Generating Station | Arizona Solar One LLC | Gila Bend, AZ | Arizona Public Service Company (AZPS) | 853.4 GWh | Sep 2013 | Feb 2026 | Solar |
| Cholla | Arizona Public Service Co | Joseph City, AZ | Arizona Public Service Company (AZPS) | 1.3 TWh | Apr 1962 | Mar 2025 | Subbituminous Coal : 99.9% |
| Douglas | Arizona Public Service Co | Douglas, AZ | Arizona Public Service Company (AZPS) | 93.0 MWh | Apr 1972 | Dec 2024 | Distillate Fuel Oil |
| Ocotillo | Arizona Public Service Co | Tempe, AZ | Arizona Public Service Company (AZPS) | 405.1 GWh | Feb 1960 | Feb 2026 | Natural Gas |
| West Phoenix | Arizona Public Service Co | Phoenix, AZ | Arizona Public Service Company (AZPS) | 3.9 TWh | Apr 1972 | Feb 2026 | Natural Gas |
| Saguaro | Arizona Public Service Co | Red Rock, AZ | Arizona Public Service Company (AZPS) | 135.2 GWh | Apr 1972 | Dec 2024 | Natural Gas |
| Yucca | Arizona Public Service Co | Yuma, AZ | Arizona Public Service Company (AZPS) | 162.2 GWh | Mar 1959 | Feb 2026 | Natural Gas : 98.3% Distillate Fuel Oil : 1.7% |
| Prescott Airport | Arizona Public Service Co | Prescott, AZ | Arizona Public Service Company (AZPS) | 2.5 GWh | Sep 2002 | Dec 2024 | Solar |
| Amazon Goodyear | Westbound Solar 3, LLC | Goodyear, AZ | Arizona Public Service Company (AZPS) | 4.5 GWh | Jun 2023 | Dec 2024 | Solar |
| Chevelon Butte Wind Farm | AES Clean Energy | Winslow, AZ | Arizona Public Service Company (AZPS) | 582.1 GWh | Apr 2023 | Feb 2026 | Wind |
| Harquahala Sun Solar Project | Copia Power | Tonopah, AZ | Arizona Public Service Company (AZPS) | 374.3 GWh | - | Feb 2026 | Solar |
| Mesquite Solar 5, LLC | Consolidated Edison Development Inc. | Tonopah, AZ | Arizona Public Service Company (AZPS) | 137.5 GWh | Jun 2023 | Feb 2026 | Solar |
| Chevelon Butte Phase 2 | AES Clean Energy | Winslow, AZ | Arizona Public Service Company (AZPS) | 486.6 GWh | Mar 2024 | Feb 2026 | Wind |
| Box Canyon (AZ) | BOCA bn, LLC | Florence, AZ | Arizona Public Service Company (AZPS) | 609.7 GWh | - | Feb 2026 | Solar |
| Sun Streams 3 | Sun Streams PVS, LLC | Arlington, AZ | Arizona Public Service Company (AZPS) | 477.6 GWh | May 2024 | Feb 2026 | Solar |
| Sun Streams 4 | Sun Streams Expansion, LLC | Tonopah, AZ | Arizona Public Service Company (AZPS) | 732.1 GWh | - | Feb 2026 | Solar |
| Yuma Solar + Storage | Invenergy Services LLC | Fortuna Foothills, AZ | Arizona Public Service Company (AZPS) | 186.4 GWh | - | Feb 2026 | Solar |
| Agave | Arizona Public Service Co | Arlington, AZ | Arizona Public Service Company (AZPS) | 298.0 GWh | Aug 2023 | Feb 2026 | Solar |
| Serrano | Serrano Solar, LLC | Marana, AZ | Arizona Public Service Company (AZPS) | 372.3 GWh | - | Feb 2026 | Solar |
| Harquahala 2 | Copia Power | Tonopah, AZ | Arizona Public Service Company (AZPS) | 750.4 GWh | - | Feb 2026 | Solar |
| Banner Solar Ironwood | Banner Solar Ironwood LLC | Queen Creek, AZ | Arizona Public Service Company (AZPS) | 3.8 GWh | Nov 2021 | Dec 2024 | Solar |
| Cotton Center Solar Hybrid | Arizona Public Service Co | Gila Bend, AZ | Arizona Public Service Company (AZPS) | 36.5 GWh | Oct 2011 | Dec 2024 | Solar |
| Arlington Valley Solar Energy II | Arevon Energy, Inc. | Arlington, AZ | Arizona Public Service Company (AZPS) | 341.2 GWh | Mar 2013 | Dec 2024 | Solar |
| Jewish Community Center PV | AES Distributed Energy | Scottsdale, AZ | Arizona Public Service Company (AZPS) | 1.8 GWh | Aug 2012 | Dec 2024 | Solar |
| Saddle Mountain Solar I | SunE AZ2, LLC | Tonopah, AZ | Arizona Public Service Company (AZPS) | 34.5 GWh | Nov 2012 | Dec 2024 | Solar |
| Paradise Valley H.S. PV | AES Distributed Energy | Phoenix, AZ | Arizona Public Service Company (AZPS) | 2.1 GWh | Dec 2012 | Dec 2024 | Solar |
| Chino Valley Solar | Arizona Public Service Co | Chino Valley, AZ | Arizona Public Service Company (AZPS) | 41.0 GWh | Nov 2012 | Dec 2024 | Solar |
| Arizona State University CHP | Energy Center Phoenix LLC | Tempe, AZ | Arizona Public Service Company (AZPS) | 40.2 GWh | Mar 2006 | Feb 2026 | Natural Gas |
| Paloma Solar Hybrid | Arizona Public Service Co | Gila Bend, AZ | Arizona Public Service Company (AZPS) | 31.9 GWh | Aug 2011 | Dec 2024 | Solar |
| Hyder Solar Hybrid | Arizona Public Service Co | Hyder, AZ | Arizona Public Service Company (AZPS) | 35.3 GWh | Oct 2011 | Dec 2024 | Solar |
| Macys Goodyear | Macys Corporate Services, Inc | Goodyear, AZ | Arizona Public Service Company (AZPS) | 3.1 GWh | Nov 2010 | Dec 2024 | Solar |
| RE Ajo 1 LLC | Duke Energy Renewables Services | Ajo, AZ | Arizona Public Service Company (AZPS) | 8.9 GWh | Jul 2011 | Dec 2024 | Solar |
| Arizona Western College PV | AES Distributed Energy | Yuma, AZ | Arizona Public Service Company (AZPS) | 1.5 GWh | Oct 2011 | Dec 2024 | Solar |
| RE Bagdad Solar I LLC | Duke Energy Renewables Services | Bagdad, AZ | Arizona Public Service Company (AZPS) | 31.3 GWh | Nov 2011 | Dec 2024 | Solar |
| Walmart Casa Grande | Tesla Inc. | Casa Grande, AZ | Arizona Public Service Company (AZPS) | 1.8 GWh | May 2011 | Dec 2023 | Solar |
| Perrin Ranch Wind LLC | Perrin Ranch Wind LLC | Williams, AZ | Arizona Public Service Company (AZPS) | 173.7 GWh | Dec 2011 | Feb 2026 | Wind |
| Buckeye Union HS District 201 | Luminace Solar Arizona, LLC | Buckeye, AZ | Arizona Public Service Company (AZPS) | 6.8 GWh | Nov 2011 | Dec 2024 | Solar |
| Prescott Solar Plant | SunE AZ1, LLC | Prescott, AZ | Arizona Public Service Company (AZPS) | 23.0 GWh | Nov 2011 | Dec 2024 | Solar |
| Foothills Solar Plant Hybrid | Arizona Public Service Co | Yuma, AZ | Arizona Public Service Company (AZPS) | 97.8 GWh | Feb 2013 | Dec 2024 | Solar |
| Badger 1 | Desert Sky Solar LLC | Tonopah, AZ | Arizona Public Service Company (AZPS) | 33.2 GWh | Oct 2013 | Dec 2024 | Solar |
| Black Mountain Solar LLC | Duke Energy Renewables Services | Golden Valley, AZ | Arizona Public Service Company (AZPS) | 19.3 GWh | Nov 2012 | Dec 2024 | Solar |
| Kingman 1 | Brookfield Renewable Trading and Marketing LP | Kingman, AZ | Arizona Public Service Company (AZPS) | 19.3 GWh | Aug 2011 | Feb 2026 | Wind : 96.2% Solar : 3.8% |
| AZ State University - Tempe Campus Solar | Arizona State University FDM | Tempe, AZ | Arizona Public Service Company (AZPS) | 1.1 GWh | Nov 2003 | Dec 2024 | Solar |
| Intel - Ocotillo Campus Solar | Tesla Inc. | Chandler, AZ | Arizona Public Service Company (AZPS) | 2.3 GWh | Nov 2017 | Dec 2024 | Solar |
| Red Rock | Arizona Public Service Co | Red Rock, AZ | Arizona Public Service Company (AZPS) | 93.1 GWh | Jan 2017 | Feb 2026 | Solar |
| Estrella Mountain PV | Tesla Inc. | Avondale, AZ | Arizona Public Service Company (AZPS) | 3.8 GWh | May 2019 | Dec 2024 | Solar |
| Phoenix Airport Rental Car Center | SunStrong Management, LLC | Phoenix, AZ | Arizona Public Service Company (AZPS) | 4.4 GWh | Nov 2012 | Dec 2024 | Solar |
| Lake Pleasant WTP | MN8 Energy LLC | Peoria, AZ | Arizona Public Service Company (AZPS) | 12.9 GWh | Nov 2012 | Dec 2024 | Solar |
| Phoenix Airport East Economy Lot | SunStrong Management, LLC | Phoenix, AZ | Arizona Public Service Company (AZPS) | 1.3 GWh | Nov 2012 | Dec 2024 | Solar |
| RE Gillespie 1 LLC | MN8 Energy LLC | Gila Bend, AZ | Arizona Public Service Company (AZPS) | 36.8 GWh | Nov 2013 | Dec 2024 | Solar |
| Union HS at Casa Grande | Luminace Solar Holding, LLC | Casa Grande, AZ | Arizona Public Service Company (AZPS) | 2.9 GWh | Nov 2012 | Dec 2024 | Solar |
| Vista Grande HS at Casa Grande | Luminace Solar Holding, LLC | Casa Grande, AZ | Arizona Public Service Company (AZPS) | 2.8 GWh | Nov 2012 | Dec 2024 | Solar |
| Hyder II Hybrid | Arizona Public Service Co | Hyder, AZ | Arizona Public Service Company (AZPS) | 32.5 GWh | Nov 2013 | Dec 2024 | Solar |
| Gilbert Solar Facility I, LLC | Gilbert Solar Facility I, LLC | Gilbert, AZ | Arizona Public Service Company (AZPS) | 3.8 GWh | Sep 2011 | Dec 2024 | Solar |
| Gila Bend Hybrid | Arizona Public Service Co | Gila Bend, AZ | Arizona Public Service Company (AZPS) | 84.7 GWh | Sep 2014 | Dec 2024 | Solar |
| Desert Star Hybrid | Arizona Public Service Co | Buckeye, AZ | Arizona Public Service Company (AZPS) | 29.2 GWh | Aug 2015 | Dec 2024 | Solar |
| Arlington Valley Energy Facility | Arlington Valley LLC | Arlington, AZ | Arlington Valley, LLC (DEAA) | 3.0 TWh | May 2002 | Feb 2026 | Natural Gas |
| Dell Power Station | Associated Electric Coop, Inc | Dell, AR | Associated Electric Cooperative, Inc. (AECI) | 3.9 TWh | Jul 2007 | Dec 2024 | Natural Gas : 99.5% |
| Macon Energy Center | City of Macon - (MO) | Macon, MO | Associated Electric Cooperative, Inc. (AECI) | 80.7 GWh | Apr 2003 | Dec 2024 | Natural Gas |
| Thomas Hill | Associated Electric Coop, Inc | Clifton Hill, MO | Associated Electric Cooperative, Inc. (AECI) | 7.3 TWh | Nov 1966 | Feb 2026 | Subbituminous Coal : 99.9% |
Summary of Power Plants By State
Figures are based on February 2026 generation numbers.| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 77 | 10,522.92 GWh |
| Alaska | # 48 | 139 | 547.09 GWh |
| Arizona | # 16 | 184 | 7,875.02 GWh |
| Arkansas | # 25 | 114 | 5,134.19 GWh |
| California | # 5 | 1,677 | 13,090.02 GWh |
| Colorado | # 31 | 294 | 4,129.24 GWh |
| Connecticut | # 32 | 162 | 3,713.11 GWh |
| Delaware | # 49 | 33 | 489.00 GWh |
| District of Columbia | # 51 | 16 | 15.28 GWh |
| Florida | # 3 | 334 | 18,619.02 GWh |
| Georgia | # 8 | 248 | 10,834.93 GWh |
| Hawaii | # 47 | 70 | 669.33 GWh |
| Idaho | # 41 | 145 | 1,901.37 GWh |
| Illinois | # 4 | 380 | 14,875.53 GWh |
| Indiana | # 12 | 216 | 9,790.54 GWh |
| Iowa | # 19 | 290 | 6,378.25 GWh |
| Kansas | # 29 | 183 | 4,702.54 GWh |
| Kentucky | # 22 | 60 | 6,056.73 GWh |
| Louisiana | # 17 | 86 | 7,844.56 GWh |
| Maine | # 45 | 215 | 1,304.77 GWh |
| Maryland | # 38 | 203 | 3,022.33 GWh |
| Massachusetts | # 43 | 638 | 1,703.92 GWh |
| Michigan | # 11 | 268 | 9,944.77 GWh |
| Minnesota | # 28 | 763 | 4,707.75 GWh |
| Mississippi | # 23 | 56 | 5,592.62 GWh |
| Missouri | # 24 | 127 | 5,447.62 GWh |
| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,424.51 GWh |
| Nebraska | # 35 | 124 | 3,248.85 GWh |
| Nevada | # 39 | 114 | 3,017.15 GWh |
| New Hampshire | # 44 | 56 | 1,533.32 GWh |
| New Jersey | # 27 | 386 | 5,076.17 GWh |
| New Mexico | # 37 | 143 | 3,060.89 GWh |
| New York | # 9 | 949 | 10,653.43 GWh |
| North Carolina | # 7 | 903 | 11,173.71 GWh |
| North Dakota | # 33 | 59 | 3,698.46 GWh |
| Ohio | # 6 | 200 | 13,061.62 GWh |
| Oklahoma | # 18 | 141 | 6,415.64 GWh |
| Oregon | # 21 | 270 | 6,135.97 GWh |
| Pennsylvania | # 2 | 251 | 20,963.61 GWh |
| Rhode Island | # 46 | 100 | 708.28 GWh |
| South Carolina | # 15 | 207 | 8,044.42 GWh |
| South Dakota | # 42 | 52 | 1,872.08 GWh |
| Tennessee | # 20 | 88 | 6,323.51 GWh |
| Texas | # 1 | 959 | 41,824.62 GWh |
| Utah | # 36 | 125 | 3,187.35 GWh |
| Vermont | # 50 | 116 | 163.02 GWh |
| Virginia | # 14 | 236 | 9,222.47 GWh |
| Washington | # 13 | 135 | 9,340.69 GWh |
| West Virginia | # 30 | 40 | 4,249.38 GWh |
| Wisconsin | # 26 | 239 | 5,119.83 GWh |
| Wyoming | # 34 | 70 | 3,369.17 GWh |