Exeter Solar
19995 Avenue 264, Exeter, CA 93221Plant Summary Information
Exeter Solar is ranked #453 out of 849 solar farms in California in terms of total annual net electricity generation.
Exeter Solar generated 1.1 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Exeter Solar |
|---|---|
| Utility Name | Altus Power America Management, LLC |
| Location | Tulare County, CA |
| Initial Operation Date | February 2014 |
| Last Update | Dec 2024 |
| Annual Generation | 4.6 GWh |
| Annual Consumption | 16.2 k MMBtu |
| Ranked #8,220 out of 12,539 Power Plants Nationwide | |
| Ranked #3,325 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #1,124 out of 1,600 California Power Plants | |
| Ranked #453 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Tulare PV I LLC (2013 to 2021) Altus Power America Management, LLC (2022 to 2024) |
Map of Exeter Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Exeter Solar.
Monthly Net Generation for Exeter Solar
Exeter Solar Details
| Summary Information | |
|---|---|
| Plant Name | Exeter Solar (58306) |
| Plant Address | 19995 Avenue 264, Exeter, CA 93221 |
| Utility | Altus Power America Management, LLC (60281) |
| Latitude, Longitude | 36.2675, -119.12858 |
| Generation Dates on File | Feb 2014 to Dec 2024 |
| Initial Operation Date | February 2014 |
| Annual Generation | 4.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF13-196-001,QF13-197-001,QF13-198-001 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator 1 Details Operating February 2014
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1 MW |
| Summer Capacity | 1 MW |
| Winter Capacity | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 2014 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 1.2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator 2 Details Operating February 2014
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1 MW |
| Summer Capacity | 1 MW |
| Winter Capacity | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 2014 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 1.2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator 3 Details Operating February 2014
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 2014 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 1.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Exeter Solar Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #3315 | BQ - Psychedelic Site CSG | Swan Lake, NY | 4.6 GWh |
| #3316 | Bedford Solar (Oppidum) | Bedford, VA | 4.6 GWh |
| #3317 | Woodlawn CSG | Crete, IL | 4.6 GWh |
| #3318 | Trenton Solar Farm (MO) | Trenton, MO | 4.6 GWh |
| #3319 | Burlington Coat Factory Solar | Florence, NJ | 4.6 GWh |
| #3320 | LPEA Sunnyside Solar 1 Facility | Durango, CO | 4.6 GWh |
| #3321 | Galloway Landfill | Wall, NJ | 4.6 GWh |
| #3322 | IL Sidney Project1 | Sidney, IL | 4.6 GWh |
| #3323 | Independence Solar Farm | Independence, MO | 4.6 GWh |
| #3324 | MilfordSolar OR | Forest Grove, OR | 4.6 GWh |
| #3326 | Chicopee Solar | Chicopee, MA | 4.6 GWh |
| #3327 | Lowndes Tycor Farms | Lake Park, GA | 4.6 GWh |
| #3328 | USS Solar Brick | Standard City, IL | 4.6 GWh |
| #3329 | Mount Dora Solar Farm F | Mount Dora, FL | 4.6 GWh |
| #3330 | DG Dighton LLC CSG | Dighton, MA | 4.6 GWh |
| #3331 | California City | California City, CA | 4.6 GWh |
| #3332 | Sierra Pacific Chinese Camp | Chinese Camp, CA | 4.6 GWh |
| #3333 | Acton | Acton, ME | 4.6 GWh |
| #3334 | Sandwich | Sandwich, MA | 4.6 GWh |
| #3335 | Solar Las Vegas MB-1 | Las Vegas, NV | 4.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Exeter Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bob Wiley Detention Center | Visalia, CA | 2.8 GWh | 16.4 mi |
| Central CA Fuel Cell 1 | Tulare, CA | 17.4 GWh | 14.9 mi |
| City of Tulare Water Facility | Tulare, CA | 20.7 GWh | 14.9 mi |
| Civic Center East | Visalia, CA | 2.7 GWh | 11.3 mi |
| Farmersville | Farmersville, CA | 6.5 GWh | 5.4 mi |
| Government Plaza Solar | Visalia, CA | 1.7 GWh | 10.5 mi |
| Ivanhoe Solar | Visalia, CA | 5.6 GWh | 10.9 mi |
| Kaweah Delta District Hospital | Visalia, CA | 21.4 GWh | 10.1 mi |
| Lindsay Solar | Lindsay, CA | 6.2 GWh | 3.9 mi |
| Pivot Energy PPA 22 | Visalia, CA | 68.0 MWh | 15.9 mi |
| POM Beverage Solar | Del Rey, CA | 4.5 GWh | 15.3 mi |
| POM Juice Solar | Fresno, CA | 3.2 GWh | 15.1 mi |
| Porterville 6 and 7 | Porterville, CA | 3.0 GWh | 16.2 mi |
| Porterville Solar | Porterville, CA | 5.7 GWh | 12.4 mi |
| RE-VFO LLC | Visalia, CA | 1.8 GWh | 16.3 mi |
| South County Detention Center Solar | Porterville, CA | 2.4 GWh | 16.2 mi |
| Terminus Hydroelectric Project | Lemon Cove, CA | 42.2 GWh | 12.3 mi |
| Tulare Akers Professional Center | Visalia, CA | 1.6 GWh | 12.9 mi |
| Tulare BioMAT Fuel Cell | Tulare, CA | 13.7 GWh | 14.8 mi |
| Visalia CSG LLC | Tulare, CA | 6.4 GWh | 6.8 mi |