San Diego - NCRC at Vista
325 S. Melrose Dr, Vista, CA 92083Plant Summary Information
San Diego - NCRC at Vista is ranked #578 out of 849 solar farms in California in terms of total annual net electricity generation.
San Diego - NCRC at Vista generated 584.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | San Diego - NCRC at Vista |
|---|---|
| Utility Name | California PV Energy 3, LLC |
| Location | San Diego County, CA |
| Initial Operation Date | March 2021 |
| Last Update | Dec 2024 |
| Annual Generation | 2.9 GWh |
| Annual Consumption | 10.5 k MMBtu |
| Ranked #9,547 out of 12,539 Power Plants Nationwide | |
| Ranked #4,452 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #1,284 out of 1,600 California Power Plants | |
| Ranked #578 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of San Diego - NCRC at Vista
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for San Diego - NCRC at Vista.
Monthly Net Generation for San Diego - NCRC at Vista
San Diego - NCRC at Vista Details
| Summary Information | |
|---|---|
| Plant Name | San Diego - NCRC at Vista (64049) |
| Plant Address | 325 S. Melrose Dr, Vista, CA 92083 |
| Utility | California PV Energy 3, LLC (63667) |
| Latitude, Longitude | 33.19028, -117.25558 |
| Generation Dates on File | Mar 2021 to Dec 2024 |
| Initial Operation Date | March 2021 |
| Annual Generation | 2.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator NCRC Details Operating March 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.8 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 1.8 MW |
| Winter Capacity | 1.8 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | March 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 178 |
| Tilt Angle | 7 |
| DC Net Capacity | 2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 2 MW |
| Virtual Net Metering Agreement | No |
San Diego - NCRC at Vista Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #4442 | Lisbon Street Solar | Lewiston, ME | 3.0 GWh |
| #4443 | O'Shea Solar Farm | Detroit, MI | 3.0 GWh |
| #4444 | First Baptist Church of Glenarden | Upper Marlboro, MD | 3.0 GWh |
| #4445 | Hadley 2 Solar, LLC CSG | Hadley, MA | 3.0 GWh |
| #4446 | White CSG | Baltimore, MD | 3.0 GWh |
| #4447 | Mustang One | Cambridge, MD | 3.0 GWh |
| #4448 | ER Salvage Yard | Morrisville, VT | 3.0 GWh |
| #4449 | AGA TAG Solar III LLC | Spartanburg, SC | 2.9 GWh |
| #4450 | Greenfield Solar PV | Greenfield, MA | 2.9 GWh |
| #4451 | El Dorado Solar, LLC | El Dorado Hills, CA | 2.9 GWh |
| #4453 | Trout Creek Solar | Buena Vista, CO | 2.9 GWh |
| #4454 | Baltimore City G | Perryman, MD | 2.9 GWh |
| #4455 | Minisink Community Solar 2 LLC | Minisink, NY | 2.9 GWh |
| #4456 | KS Solar Six LLC | Hubbardston, MA | 2.9 GWh |
| #4457 | NY Van Buren II CSG | Warners, NY | 2.9 GWh |
| #4458 | Sydney Solar | Hampton, CT | 2.9 GWh |
| #4459 | Hatfield Renewables Community Solar | Hatfield, MA | 2.9 GWh |
| #4460 | Innovative Solar 15, LLC | Ellenboro, NC | 2.9 GWh |
| #4461 | HCE Reams Solar, LLC | Dinwiddie, VA | 2.9 GWh |
| #4462 | KDC Solar CV Central MD Regional Transit | West Friendship, MD | 2.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding San Diego - NCRC at Vista.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bear Valley | Escondido, CA | 4.2 GWh | 13.9 mi |
| CalPeak Power Enterprise Peaker Plant | Escondido, CA | 6.1 GWh | 9.3 mi |
| Carlsbad Energy Center | Carlsbad, CA | 264.4 GWh | 5.7 mi |
| Encina Water Pollution Control | Carlsbad, CA | 14.2 GWh | 6.4 mi |
| Escondido Energy Center | Escondido, CA | 9.4 GWh | 9.2 mi |
| GEN005 Antibody Fuel Cell | Oceanside, CA | 20.6 GWh | 2.9 mi |
| Genentech-Oceanside Hybrid | Oceanside, CA | 3.6 GWh | 2.9 mi |
| Gilead Oceanside Solar Project | Oceanside, CA | 2.4 GWh | 3.2 mi |
| Goal Line LP | Escondido, CA | 8.3 GWh | 10.3 mi |
| Life Technologies Carlsbad | Carlsbad, CA | 8.6 GWh | 4.1 mi |
| NLP Granger | Valley Center, CA | 4.8 GWh | 12.6 mi |
| Orange Grove Peaking Facility | Pala, CA | 23.6 GWh | 14.3 mi |
| Palomar Energy | Escondido, CA | 1.4 TWh | 9.3 mi |
| Red Mountain | Fallbrook, CA | 34.3 GWh | 14.6 mi |
| SDCWA - Twin Oaks | San Marcos, CA | 1.3 GWh | 5.1 mi |
| Vallecitos Water District | San Marcos, CA | 3.2 GWh | 4.8 mi |
| Valley Center | Valley Center, CA | 4.7 GWh | 14.1 mi |
| Valley Center 1 | Valley Center, CA | 3.6 GWh | 15 mi |
| Valley Center 2 | Valley Center, CA | 11.4 GWh | 15 mi |
| Watkins Manufacturing Co. | San Diego, CA | 7.4 GWh | 3.4 mi |