Ocotillo Express LLC
1377 West Imerial Highway, Ocotillo, CA 92259Plant Summary Information
Ocotillo Express LLC is ranked #3 out of 110 wind farms in California in terms of total annual net electricity generation.
Ocotillo Express LLC generated 172.1 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Ocotillo Express LLC |
|---|---|
| Utility Name | Pattern Operators LP |
| Location | Imperial County, CA |
| Initial Operation Date | December 2012 |
| Last Update | Aug 2026 |
| Annual Generation | 424.6 GWh |
| Annual Consumption | 1.6 M MMBtu |
| Ranked #1,589 out of 13,301 Power Plants Nationwide | |
| Ranked #458 out of 1,377 Wind Power Plants Nationwide | |
| Ranked #104 out of 1,641 California Power Plants | |
| Ranked #3 out of 110 California Wind Power Plants | |
| Fuel Types | Wind |
Map of Ocotillo Express LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ocotillo Express LLC.
Monthly Net Generation for Ocotillo Express LLC
Monthly Plant Fuel Consumption for Ocotillo Express LLC
Ocotillo Express LLC Details
| Summary Information | |
|---|---|
| Plant Name | Ocotillo Express LLC (57514) |
| Plant Address | 1377 West Imerial Highway, Ocotillo, CA 92259 |
| Utility | Pattern Operators LP (56545) |
| Latitude, Longitude | 32.75278, -116.04472 |
| Generation Dates on File | Dec 2012 to Aug 2026 |
| Initial Operation Date | December 2012 |
| Annual Generation | 424.6 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
| Grid Voltage | 500.00 kV |
| Energy Storage | No |
Generator WTG Details Operating December 2012
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 265.4 MW |
| Summer Capacity | 265.4 MW |
| Winter Capacity | 265.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2012 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 112 |
| Turbine Details | |
| Number Of Turbines | 112 |
|---|---|
| Predominant Turbine Manufacturer | Siemens |
| Predominant Turbine Model Number | SWT-2.3-108 |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262.4 |
Ocotillo Express LLC Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Ocotillo Express LLC | Pier 1, Bay 3, San Francisco, CA 94111 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #448 | Post Rock Wind Power Project, LLC | Ellsworth, KS | 433.4 GWh |
| #449 | Buffalo Ridge Wind | Lake Benton, MN | 432.5 GWh |
| #450 | Bishop Hill III | Cambridge, IL | 431.8 GWh |
| #451 | Meadow Lake Wind Farm LLC | Lafayette, IN | 431.7 GWh |
| #452 | Gunsight Mountain Wind Energy LLC | Big Spring, TX | 430.6 GWh |
| #453 | Glen Ullin Energy Center | Glen Ullin, ND | 429.8 GWh |
| #454 | Sunflower Wind Project | Mandan, ND | 429.7 GWh |
| #455 | Crossover Wind | Wynne, AR | 428.5 GWh |
| #456 | Redbed Plains Wind Farm | Tuttle, OK | 427.7 GWh |
| #457 | Anticline Wind | Casper, WY | 424.7 GWh |
| #459 | Heartland Divide Wind Project, LLC | Melville, IA | 422.5 GWh |
| #460 | Callahan Divide Wind Energy Center | Tusocola, TX | 422.0 GWh |
| #461 | Briscoe Wind Farm | Silverton, TX | 420.8 GWh |
| #462 | Crossroads Wind Farm | Canton, OK | 420.2 GWh |
| #463 | Tatanka Wind Power LLC | Ashley, ND | 420.0 GWh |
| #464 | Midway Wind, LLC | Taft, TX | 417.6 GWh |
| #465 | Dunlap | Medicine Bow, WY | 416.7 GWh |
| #466 | Judith Gap Wind Energy Center | Harlowton, MT | 413.7 GWh |
| #467 | Voyager Wind II | Mojave, CA | 411.3 GWh |
| #468 | Panther Creek Wind Farm II | Big Spring, TX | 411.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ocotillo Express LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Campo Verde Solar | El Centro, CA | 292.7 GWh | 18.5 mi |
| Centinela Solar Energy | Calexico, CA | 448.6 GWh | 23.5 mi |
| Centinela State Prison | Sacramento, CA | 18.0 GWh | 16 mi |
| Drew Solar LLC | Calexico, CA | 304.4 GWh | 22.5 mi |
| Golden Acorn Casino | Campo, CA | 4.4 GWh | 18.3 mi |
| Imperial Solar Energy Center South | Calexico, CA | 251.1 GWh | 23.3 mi |
| Imperial Solar Energy Center West | Seeley, CA | 357.0 GWh | 15.5 mi |
| Jacumba Solar Farm | Jacumba, CA | 46.3 GWh | 10.3 mi |
| Kumeyaay Wind | Campo, CA | 130.5 GWh | 17.6 mi |
| Mount Signal Solar Farm II | Calexico, CA | 355.0 GWh | 24.8 mi |
| Ocotillo Wells | Borrego Springs, CA | 99.7 GWh | 22.4 mi |
| SEPV Imperial Dixieland East | Imperial, CA | 5.3 GWh | 16 mi |
| SEPV Imperial Dixieland West | Imperial, CA | 8.5 GWh | 15.7 mi |
| Seville 1 | Ocotillo Wells, CA | 53.3 GWh | 24.9 mi |
| Seville 2 | Ocotillo Wells, CA | 78.3 GWh | 24.8 mi |
| Titan Solar 1 (CA) | Borrego Springs, CA | 164.1 GWh | 26.9 mi |
| Tule Wind LLC | Boulevard, CA | 349.0 GWh | 15.5 mi |
| USG 1 | El Centro, CA | 2.9 GWh | 11.2 mi |
| USG 2 | El Centro, CA | 1.3 GWh | 10.9 mi |
| Wistaria Ranch Solar | Calexico, CA | 268.4 GWh | 25.3 mi |