5120 Phillips Rd, Roseville, CA 95678Plant Summary Information
Roseville Energy Park is ranked #37 out of 342 natural gas power plants in California in terms of total annual net electricity generation.
Roseville Energy Park is comprised of 5 generators and generated 246.5 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Roseville Energy Park |
|---|---|
| Utility Name | City of Roseville - (CA) |
| Location | Placer County, CA |
| Initial Operation Date | November 2007 |
| Last Update | Sep 2025 |
| Annual Generation | 598.5 GWh |
| Annual Consumption | 5.6 M MMBtu |
| Ranked #1,140 out of 12,539 Power Plants Nationwide | |
| Ranked #528 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #64 out of 1,600 California Power Plants | |
| Ranked #37 out of 342 California Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Roseville Energy Park
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Roseville Energy Park.
Monthly Net Generation for Roseville Energy Park
Roseville Energy Park Details
| Summary Information | |
|---|---|
| Plant Name | Roseville Energy Park (56298) |
| Plant Address | 5120 Phillips Rd, Roseville, CA 95678 |
| Utility | City of Roseville - (CA) (16295) |
| Latitude, Longitude | 38.7928, -121.3811 |
| Generation Dates on File | Oct 2007 to Sep 2025 |
| Initial Operation Date | November 2007 |
| Annual Generation | 598.5 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | Balancing Authority of Northern California (BANC) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Municipality/recycled water |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of Roseville - (CA) (16295) CA |
| Grid Voltage | 60.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | PACIFIC GAS |
| Natural Gas Storage | No |
Generator 0001 Details Operating November 2007
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | A101 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 40 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 38 MW |
| Winter Capacity | 42 MW |
| Minimum Load | 23 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2007 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 0002 Details Operating November 2007
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | A101 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 40 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 38 MW |
| Winter Capacity | 42 MW |
| Minimum Load | 23 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2007 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 0003 Details Operating November 2007
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | A101 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 85 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 75 MW |
| Winter Capacity | 78 MW |
| Minimum Load | 23 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2007 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 0004 Details Standby August 2022
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 30 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 30.6 MW |
| Winter Capacity | 33.6 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | No |
| First Operation Date | August 2022 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 0005 Details Standby August 2022
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 30 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 30.6 MW |
| Winter Capacity | 33.6 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | No |
| First Operation Date | August 2022 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Roseville Energy Park Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| California Dept. of Water Resources | 3310 El Camino Avenue, Sacramento, CA 95821 | Generator 0004 | 100.00% |
| California Dept. of Water Resources | 3310 El Camino Avenue, Sacramento, CA 95821 | Generator 0005 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #518 | Hunlock Power Station | Hunlock Creek, PA | 630.9 GWh |
| #519 | Horseshoe Lake | Harrah, OK | 614.9 GWh |
| #520 | JCO Oxides Olefins Plant | Port Neeches, TX | 613.8 GWh |
| #521 | Marathon Bay Area Cogen | Martinez, CA | 613.4 GWh |
| #522 | Procter & Gamble Mehoopany Mill | Mehoopany, PA | 612.1 GWh |
| #523 | Frontier | Oklahoma City, OK | 607.4 GWh |
| #524 | Hawthorn | Kansas City, MO | 2.8 TWh |
| #525 | General Electric Plastic | Burkeville, AL | 602.0 GWh |
| #526 | SCA Cogen 2 | Sacramento, CA | 601.6 GWh |
| #527 | Morris Cogeneration LLC | Morris, IL | 598.9 GWh |
| #529 | Topaz Generating | Texas City, TX | 597.6 GWh |
| #530 | Encogen | Bellingham, WA | 593.2 GWh |
| #531 | Beatrice | Beatrice, NE | 589.9 GWh |
| #532 | Union Carbide Seadrift Cogen | Seadrift, TX | 638.9 GWh |
| #533 | Geismar Cogen | Geismar, LA | 585.7 GWh |
| #534 | Axiall Natrium Plant | New Martinsville, WV | 602.0 GWh |
| #535 | Bethpage Power Plant | Hicksville, NY | 573.5 GWh |
| #536 | Berkshire Power | Agawam, MA | 573.3 GWh |
| #537 | Eklutna Generation Station | Chugiak, AK | 573.0 GWh |
| #538 | Shell Chemical | Geismar, LA | 572.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Roseville Energy Park.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Chambers 4 - Sacramento SMF1 | Sacramento, CA | 2.3 GWh | 12.9 mi |
| Folsom | Folsom, CA | 509.9 GWh | 13.4 mi |
| Folsom SP and CSP Sacramento | Represa, CA | 2.3 GWh | 14 mi |
| Intel Folsom | Folsom, CA | 1.5 GWh | 15.2 mi |
| Intel Folsom Phase 2 | Folsom, CA | 1.5 GWh | 15.6 mi |
| Intel Folsom Phase 3 | Folsom, CA | 9.0 GWh | 15.5 mi |
| Lincoln Landfill | Lincoln, CA | 29.5 GWh | 3.8 mi |
| Lincoln WWTF Hybrid | Lincoln, CA | 6.4 GWh | 4.9 mi |
| McClellan (CA) | Sacramento, CA | 3.4 GWh | 9.7 mi |
| Nimbus | Folsom, CA | 37.9 GWh | 13.8 mi |
| Rancho Cordova Medical Offices | Rancho Cordova, CA | 2.0 GWh | 15.7 mi |
| Rio Bravo Rocklin | Lincoln, CA | 155.2 GWh | 4.5 mi |
| Roseville Power Plant #2 | Rocklin, CA | 6.9 GWh | 3.3 mi |
| Sacramento (SMUD) | Sacramento, CA | 2.0 GWh | 14.8 mi |
| Sacramento Point West Medical Offices | Sacramento, CA | 2.1 GWh | 13.8 mi |
| SCDA Solar 1 | Sacramento, CA | 13.4 GWh | 13.1 mi |
| Sierra Pacific Lincoln Facility | Lincoln, CA | 94.1 GWh | 8.5 mi |
| Strata Roof 1 | Sacramento, CA | 1.5 GWh | 12.3 mi |
| US GSA - Sacramento | Sacramento, CA | 2.0 GWh | 13.3 mi |
| Wildflower Solar 1 | Elverta, CA | 27.9 GWh | 8 mi |