El Segundo Energy Center LLC
301 Vista Del Mar Blvd, El Segundo, CA 90245Plant Summary Information
El Segundo Energy Center LLC is ranked #85 out of 314 natural gas power plants in California in terms of total annual net electricity generation.
El Segundo Energy Center LLC is comprised of 4 generators and generated 2.5 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | El Segundo Energy Center LLC |
|---|---|
| Utility Name | NRG Energy Services LLC |
| Location | Los Angeles County, CA |
| Initial Operation Date | July 2013 |
| Last Update | Mar 2026 |
| Annual Generation | 46.2 GWh |
| Annual Consumption | 473.4 k MMBtu |
| Ranked #4,237 out of 12,332 Power Plants Nationwide | |
| Ranked #1,112 out of 2,179 Natural Gas Power Plants Nationwide | |
| Ranked #488 out of 1,530 California Power Plants | |
| Ranked #85 out of 314 California Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
| Previous Operators |
NRG El Segundo Operations Inc (2013 to 2020) El Segundo Energy Center, LLC (2021 to 2023) NRG Energy Services LLC (2024 to 2024) |
Map of El Segundo Energy Center LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for El Segundo Energy Center LLC.
Monthly Net Generation for El Segundo Energy Center LLC
Monthly Plant Fuel Consumption for El Segundo Energy Center LLC
El Segundo Energy Center LLC Details
| Summary Information | |
|---|---|
| Plant Name | El Segundo Energy Center LLC (57901) |
| Plant Address | 301 Vista Del Mar Blvd, El Segundo, CA 90245 |
| Utility | NRG Energy Services LLC (63227) |
| Latitude, Longitude | 33.91056, -118.425 |
| Generation Dates on File | Aug 2013 to Mar 2026 |
| Initial Operation Date | July 2013 |
| Annual Generation | 46.2 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Air Cooled Condensor |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | SOUTHERN CALIFORNIA GAS COMPANY |
Generator 7 Details Operating July 2013
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | 2021 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 198 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 195 MW |
| Winter Capacity | 195 MW |
| Minimum Load | 100 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 8 Details Operating July 2013
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | 2021 |
| Ownership | Single Owner |
| Duct Burners | No |
| Nameplate Capacity | 70.7 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 60 MW |
| Winter Capacity | 60 MW |
| Minimum Load | 47 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 5 Details Operating August 2013
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | 1011 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 198 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 195 MW |
| Winter Capacity | 195 MW |
| Minimum Load | 100 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 6 Details Operating August 2013
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | 1011 |
| Ownership | Single Owner |
| Duct Burners | No |
| Nameplate Capacity | 70.7 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 60 MW |
| Winter Capacity | 60 MW |
| Minimum Load | 47 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
El Segundo Energy Center LLC Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1102 | Argonne National Laboratory CHP | Lemont, IL | 47.9 GWh |
| #1103 | Kalkaska CT #1 | Kalkaska, MI | 47.8 GWh |
| #1104 | Columbus MS | Columbus, MS | 518.6 GWh |
| #1105 | HTW Plant 303 COGEN | Salt Lake City, UT | 47.6 GWh |
| #1106 | Dome Project | Fellows, CA | 47.5 GWh |
| #1107 | Howard Down | Vineland, NJ | 47.4 GWh |
| #1108 | Fort Dodge | Dodge City, KS | 47.2 GWh |
| #1109 | Montclair State University Cogen | Little Falls, NJ | 47.5 GWh |
| #1110 | Powerlane Plant | Greenville, TX | 48.9 GWh |
| #1111 | ACM - Midtown Thermal | Atlantic City, NJ | 46.7 GWh |
| #1113 | Rhode Island Hospital | Providence, RI | 52.7 GWh |
| #1114 | Valmont Combustion Turbine Project | Boulder, CO | 46.0 GWh |
| #1115 | Barrow | Barrow, AK | 45.9 GWh |
| #1116 | NYU LANGONE HEALTH | New York, NY | 46.1 GWh |
| #1117 | Feather River Energy Center | Yuba City, CA | 45.7 GWh |
| #1118 | St Francisville Mill | St. Francisville, LA | 110.3 GWh |
| #1119 | Orbit Bloom Fuel Cell | Medford, NY | 45.6 GWh |
| #1120 | Otter Creek Ethanol Poet - Ashton | Ashton, IA | 45.4 GWh |
| #1121 | Wolf Run Energy | Wilmot Township, PA | 44.9 GWh |
| #1122 | Gilroy Power Plant | Gilroy, CA | 44.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding El Segundo Energy Center LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 20333 Normandie PV, LLC | Torrance, CA | 5.3 GWh | 8.4 mi |
| AT&T - Gardena | Gardena, CA | 7.8 GWh | 8.1 mi |
| AT&T - Hawthorne | Hawthorne, CA | 6.5 GWh | 6.1 mi |
| CBS Television City | Los Angeles, CA | 977.0 MWh | 12 mi |
| Central Utilities Plant LAX 2 | Los Angeles, CA | 31.7 GWh | 2.6 mi |
| DirecTV - Los Angeles | Los Angeles, CA | 8.3 GWh | 5 mi |
| Disney Prospect | Los Angeles, CA | 8.5 GWh | 12 mi |
| El Segundo Cogen | El Segundo, CA | 1.3 TWh | 1.3 mi |
| Equinix Douglas St. Fuel Cell | El Segundo, CA | 8.0 GWh | 2.4 mi |
| Equinix Maple Ave. Fuel Cell | El Segundo, CA | 7.7 GWh | 2 mi |
| Francisco St. Solar | Torrance, CA | 1.2 GWh | 8.1 mi |
| Hyperion Treatment Plant CHP Plant | Playa del Rey, CA | 155.3 GWh | 1.1 mi |
| Kaiser - Harbor City | Harbor City, CA | 17.9 GWh | 11.3 mi |
| KSR053 Cantara Fuel Cell | Panorama City, CA | 12.1 GWh | 11.2 mi |
| Lafayette 2 - MLK Jr. Hospital (MLK) | Los Angeles, CA | 2.3 GWh | 10.6 mi |
| Los Angeles Harbor College | Wilmington, CA | 2.5 GWh | 11.9 mi |
| Scattergood | Playa del Rey, CA | 1.5 TWh | 0.5 mi |
| Torrance Refining Company, LLC | Torrance, CA | 70.3 GWh | 6.7 mi |
| UCLA So Campus Cogen Project | Los Angeles, CA | 237.7 GWh | 11 mi |
| USPS PV | Los Angeles, CA | 10.1 GWh | 10.6 mi |