Hecate Energy Beacon Solar 4
29956 Highway 14, Cantil, CA 93519Plant Summary Information
Hecate Energy Beacon Solar 4 is ranked #123 out of 886 solar farms in California in terms of total annual net electricity generation.
Hecate Energy Beacon Solar 4 generated 37.1 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Hecate Energy Beacon Solar 4 |
|---|---|
| Utility Name | AES Distributed Energy |
| Location | Kern County, CA |
| Initial Operation Date | December 2016 |
| Last Update | Jun 2026 |
| Annual Generation | 114.7 GWh |
| Annual Consumption | 436.8 k MMBtu |
| Ranked #3,360 out of 13,094 Power Plants Nationwide | |
| Ranked #867 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #341 out of 1,607 California Power Plants | |
| Ranked #123 out of 886 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
Hecate Energy Beacon Solar 4, LLC (2013 to 2013) Sustainable Power Group, LLC (2014 to 2020) AES Distributed Energy (2021 to 2025) |
Map of Hecate Energy Beacon Solar 4
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hecate Energy Beacon Solar 4.
Monthly Net Generation for Hecate Energy Beacon Solar 4
Monthly Plant Fuel Consumption for Hecate Energy Beacon Solar 4
Hecate Energy Beacon Solar 4 Details
| Summary Information | |
|---|---|
| Plant Name | Hecate Energy Beacon Solar 4 (59317) |
| Plant Address | 29956 Highway 14, Cantil, CA 93519 |
| Utility | AES Distributed Energy (61012) |
| Latitude, Longitude | 35.25361, -118.02694 |
| Generation Dates on File | Nov 2016 to Jun 2026 |
| Initial Operation Date | December 2016 |
| Annual Generation | 114.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
Generator BEAC4 Details Operating December 2016
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Summer Capacity | 47 MW |
| Winter Capacity | 45 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2016 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| DC Net Capacity | 56.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Hecate Energy Beacon Solar 4 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #857 | Sandstone Solar | Florence, AZ | 116.9 GWh |
| #858 | Seabrook Solar | Seabrook, SC | 116.4 GWh |
| #859 | Red Horse 2 | Willcox, AZ | 169.3 GWh |
| #860 | Iris Solar LLC | Franklinton, LA | 116.1 GWh |
| #861 | Landrace Holdings, LLC | Conway, SC | 116.0 GWh |
| #862 | Rattler Solar Plant | Brookesville, FL | 115.8 GWh |
| #863 | Riverside Solar | Ruskin, FL | 115.7 GWh |
| #864 | Sunlight Road Solar | Franklinton, LA | 114.8 GWh |
| #865 | Maiden Creek Solar Power Plant | Maiden, NC | 114.8 GWh |
| #866 | BT Cooke Solar, LLC | Gainsville, TX | 114.7 GWh |
| #868 | Pavant Solar, LLC | Fillmore, UT | 114.5 GWh |
| #869 | Little Manatee River Solar | Ruskin, FL | 114.4 GWh |
| #870 | Salt Creek Township Solar, LLC | Mason City, IL | 114.1 GWh |
| #871 | Silver State Solar Power North | Primm, NV | 114.1 GWh |
| #872 | Alpine Solar | Lancaster, CA | 114.1 GWh |
| #873 | Manatee Solar Energy Center | Parrish, FL | 98.6 GWh |
| #874 | SloughHouse Solar, LLC | SloughHouse, CA | 113.3 GWh |
| #875 | Kimmel Road Solar, LLC | Du Quoin, IL | 112.6 GWh |
| #876 | Gransolar Texas One, LLC | Thorndale, TX | 112.4 GWh |
| #877 | Mare Branch | TBD, FL | 111.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hecate Energy Beacon Solar 4.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Beacon Solar Plant Site 2 | Cantil, CA | 105.2 GWh | 1.8 mi |
| Beacon Solar Plant Site 5 | Cantil, CA | 82.9 GWh | 0.5 mi |
| Bellefield Solar and Energy Storage Farm | Mojave, CA | 508.7 GWh | 13.6 mi |
| CalCity Solar 1 | California City, CA | 8.0 GWh | 8.5 mi |
| California City | California City, CA | 5.1 GWh | 7.2 mi |
| Difwind Farms Ltd VI | Mojave, CA | 12.6 GWh | 16.2 mi |
| Eland Solar & Storage Center, Phase 1 Hy | Mojave, CA | 716.5 GWh | 3.5 mi |
| Eland Solar & Storage Center, Phase 2 Hy | Mojave, CA | 595.1 GWh | 3.8 mi |
| Hecate Energy Beacon Solar 1 | Cantil, CA | 124.6 GWh | 1.3 mi |
| Hecate Energy Beacon Solar 3 | Cantil, CA | 118.3 GWh | 0.7 mi |
| North Sky River Energy LLC | Weldon, CA | 364.8 GWh | 11.1 mi |
| Pine Tree Solar Project | Owenyo, CA | 7.4 GWh | 9.7 mi |
| Pine Tree Wind Power Project | Cantil, CA | 123.0 GWh | 8.4 mi |
| RE Barren Ridge 1 | Mojave, CA | 164.4 GWh | 4.1 mi |
| Rising Tree Wind Farm | Mojave, CA | 250.4 GWh | 16.3 mi |
| Rising Tree Wind Farm II | Mojave, CA | 53.7 GWh | 15.2 mi |
| Sky River Wind Energy Center | Tehachapi, CA | 211.5 GWh | 12.4 mi |
| Springbok 3 Solar Farm Hybrid | Cantil, CA | 233.3 GWh | 5.9 mi |
| Springbok Solar Farm 1 | Cantil, CA | 280.4 GWh | 4.1 mi |
| Springbok Solar Farm 2 | Cantil, CA | 397.1 GWh | 2.8 mi |