Hecate Energy Beacon Solar 4
29956 Highway 14, Cantil, CA 93519Plant Summary Information
Hecate Energy Beacon Solar 4 is ranked #118 out of 818 solar farms in California in terms of total annual net electricity generation.
Hecate Energy Beacon Solar 4 generated 39.2 GWh during the 3-month period between March 2025 to June 2025.
Plant Name | Hecate Energy Beacon Solar 4 |
---|---|
Utility Name | AES Distributed Energy |
Location | Kern County, CA |
Initial Operation Date | December 2016 |
Last Update | Jun 2025 |
Annual Generation | 116.5 GWh |
Annual Consumption | 442.4 k MMBtu |
Ranked #3,154 out of 12,327 Power Plants Nationwide | |
Ranked #679 out of 6,200 Solar Power Plants Nationwide | |
Ranked #345 out of 1,567 California Power Plants | |
Ranked #118 out of 818 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Hecate Energy Beacon Solar 4, LLC (2013 to 2013) Sustainable Power Group, LLC (2014 to 2020) AES Distributed Energy (2021 to 2024) |
Map of Hecate Energy Beacon Solar 4
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hecate Energy Beacon Solar 4.
Monthly Net Generation for Hecate Energy Beacon Solar 4
Hecate Energy Beacon Solar 4 Details
Summary Information | |
---|---|
Plant Name | Hecate Energy Beacon Solar 4 (59317) |
Plant Address | 29956 Highway 14, Cantil, CA 93519 |
Utility | AES Distributed Energy (61012) |
Latitude, Longitude | 35.25361, -118.02694 |
Generation Dates on File | Nov 2016 to Jun 2025 |
Initial Operation Date | December 2016 |
Annual Generation | 116.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator BEAC4 Details Operating December 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Summer Capacity | 47 MW |
Winter Capacity | 45 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 56.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Hecate Energy Beacon Solar 4 Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#669 | Debary Solar Power Plant | DeBary, FL | 119.5 GWh |
#670 | Alpine Solar | Lancaster, CA | 118.8 GWh |
#671 | Gadsden County Solar | Chattahoochee, FL | 118.4 GWh |
#672 | Hooper Solar | Mosca, CO | 118.3 GWh |
#673 | Desper Solar | Louisa, VA | 117.8 GWh |
#674 | Ocotillo Wells | Borrego Springs, CA | 117.6 GWh |
#675 | Borden Solar Farm | Madera, CA | 117.3 GWh |
#676 | Sandstone Solar | Florence, AZ | 117.2 GWh |
#677 | Colgreen North Shore Solar Farm | Mecca, CA | 116.9 GWh |
#678 | Riverstart Solar Park III | Modoc, IN | 116.5 GWh |
#680 | Horizon Solar Energy Center | Hawthorne, FL | 116.2 GWh |
#681 | Techren Solar V | Boulder, NV | 115.5 GWh |
#682 | Beacon Solar Plant Site 2 | Cantil, CA | 115.5 GWh |
#683 | Iris Solar LLC | Franklinton, LA | 115.1 GWh |
#684 | Boulder Solar II, LLC | Boulder City, NV | 115.1 GWh |
#685 | Twin Lakes | Interlachen, FL | 115.0 GWh |
#686 | SolaireHolman Solar Project | Alpine, TX | 114.7 GWh |
#687 | Meherrin Solar | Skippers, VA | 114.7 GWh |
#688 | Silver State Solar Power North | Primm, NV | 114.5 GWh |
#689 | Pavant Solar, LLC | Fillmore, UT | 114.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hecate Energy Beacon Solar 4.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alta Wind X | Mojave, CA | 336.5 GWh | 16.6 mi |
Beacon Solar Plant Site 2 | Cantil, CA | 115.5 GWh | 1.8 mi |
Beacon Solar Plant Site 5 | Cantil, CA | 95.4 GWh | 0.5 mi |
CalCity Solar 1 | California City, CA | 7.9 GWh | 8.5 mi |
California City | California City, CA | 4.6 GWh | 7.2 mi |
Difwind Farms Ltd VI | Mojave, CA | 14.9 GWh | 16.2 mi |
Edwards Sanborn S1 | Mojave, CA | 97.0 GWh | 16.7 mi |
Eland Solar & Storage Center, Phase 1 Hy | Mojave, CA | 374.5 GWh | 3.5 mi |
Hecate Energy Beacon Solar 1 | Cantil, CA | 130.3 GWh | 1.3 mi |
Hecate Energy Beacon Solar 3 | Cantil, CA | 127.1 GWh | 0.7 mi |
North Sky River Energy LLC | Weldon, CA | 435.0 GWh | 11.1 mi |
Pine Tree Solar Project | Owenyo, CA | 7.2 GWh | 9.7 mi |
Pine Tree Wind Power Project | Cantil, CA | 115.4 GWh | 8.4 mi |
RE Barren Ridge 1 | Mojave, CA | 175.0 GWh | 4.1 mi |
Rising Tree Wind Farm | Mojave, CA | 249.0 GWh | 16.3 mi |
Rising Tree Wind Farm II | Mojave, CA | 58.7 GWh | 15.2 mi |
Sky River Wind Energy Center | Tehachapi, CA | 245.0 GWh | 12.4 mi |
Springbok 3 Solar Farm Hybrid | Cantil, CA | 250.4 GWh | 5.9 mi |
Springbok Solar Farm 1 | Cantil, CA | 297.7 GWh | 4.1 mi |
Springbok Solar Farm 2 | Cantil, CA | 399.0 GWh | 2.8 mi |