Hecate Energy Beacon Solar 4
29956 Highway 14, Cantil, CA 93519Plant Summary Information
Hecate Energy Beacon Solar 4 is ranked #119 out of 851 solar farms in California in terms of total annual net electricity generation.
Hecate Energy Beacon Solar 4 generated 24.2 GWh during the 3-month period between August 2025 to November 2025.
| Plant Name | Hecate Energy Beacon Solar 4 |
|---|---|
| Utility Name | AES Distributed Energy |
| Location | Kern County, CA |
| Initial Operation Date | December 2016 |
| Last Update | Nov 2025 |
| Annual Generation | 116.1 GWh |
| Annual Consumption | 418.2 k MMBtu |
| Ranked #3,249 out of 12,574 Power Plants Nationwide | |
| Ranked #765 out of 6,426 Solar Power Plants Nationwide | |
| Ranked #338 out of 1,603 California Power Plants | |
| Ranked #119 out of 851 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
Hecate Energy Beacon Solar 4, LLC (2013 to 2013) Sustainable Power Group, LLC (2014 to 2020) AES Distributed Energy (2021 to 2024) |
Map of Hecate Energy Beacon Solar 4
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hecate Energy Beacon Solar 4.
Monthly Net Generation for Hecate Energy Beacon Solar 4
Hecate Energy Beacon Solar 4 Details
| Summary Information | |
|---|---|
| Plant Name | Hecate Energy Beacon Solar 4 (59317) |
| Plant Address | 29956 Highway 14, Cantil, CA 93519 |
| Utility | AES Distributed Energy (61012) |
| Latitude, Longitude | 35.25361, -118.02694 |
| Generation Dates on File | Nov 2016 to Nov 2025 |
| Initial Operation Date | December 2016 |
| Annual Generation | 116.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
Generator BEAC4 Details Operating December 2016
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Summer Capacity | 47 MW |
| Winter Capacity | 45 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2016 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| DC Net Capacity | 56.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Hecate Energy Beacon Solar 4 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #755 | Hooper Solar | Mosca, CO | 118.3 GWh |
| #756 | Maiden Creek Solar Power Plant | Maiden, NC | 117.5 GWh |
| #757 | Skysol | Merrill, OR | 117.4 GWh |
| #758 | Sandstone Solar | Florence, AZ | 117.2 GWh |
| #759 | Coral Farms Solar Energy Center | Florahome, FL | 116.8 GWh |
| #760 | Alafia Solar | Mulberry, FL | 116.7 GWh |
| #761 | Sunlight Road Solar | Franklinton, LA | 116.6 GWh |
| #762 | Glover Creek Solar, LLC | Summer Shade, KY | 116.6 GWh |
| #763 | Great Cove Solar | McConnellsburg, PA | 116.4 GWh |
| #764 | Iris Solar LLC | Franklinton, LA | 116.2 GWh |
| #766 | Manatee Solar Energy Center | Parrish, FL | 103.5 GWh |
| #767 | Colgreen North Shore Solar Farm | Mecca, CA | 115.4 GWh |
| #768 | Pavant Solar, LLC | Fillmore, UT | 114.5 GWh |
| #769 | Landrace Holdings, LLC | Conway, SC | 114.3 GWh |
| #770 | Payne Creek Solar | Bowling Green, FL | 114.3 GWh |
| #771 | RE Gaskell West 2 LLC | Rosamond, CA | 114.0 GWh |
| #772 | Wythe County Solar | Wythe County, VA | 113.5 GWh |
| #773 | FPL Cavendish Solar Energy Center | Okeechobee, FL | 113.3 GWh |
| #774 | Silver State Solar Power North | Primm, NV | 113.0 GWh |
| #775 | Beacon Solar Plant Site 2 | Cantil, CA | 113.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hecate Energy Beacon Solar 4.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alta Wind X | Mojave, CA | 379.0 GWh | 16.6 mi |
| Beacon Solar Plant Site 2 | Cantil, CA | 113.0 GWh | 1.8 mi |
| Beacon Solar Plant Site 5 | Cantil, CA | 88.6 GWh | 0.5 mi |
| CalCity Solar 1 | California City, CA | 7.9 GWh | 8.5 mi |
| California City | California City, CA | 4.6 GWh | 7.2 mi |
| Difwind Farms Ltd VI | Mojave, CA | 14.9 GWh | 16.2 mi |
| Eland Solar & Storage Center, Phase 1 Hy | Mojave, CA | 681.5 GWh | 3.5 mi |
| Eland Solar & Storage Center, Phase 2 Hy | Mojave, CA | 224.1 GWh | 3.8 mi |
| Hecate Energy Beacon Solar 1 | Cantil, CA | 129.0 GWh | 1.3 mi |
| Hecate Energy Beacon Solar 3 | Cantil, CA | 122.6 GWh | 0.7 mi |
| North Sky River Energy LLC | Weldon, CA | 435.0 GWh | 11.1 mi |
| Pine Tree Solar Project | Owenyo, CA | 7.2 GWh | 9.7 mi |
| Pine Tree Wind Power Project | Cantil, CA | 115.4 GWh | 8.4 mi |
| RE Barren Ridge 1 | Mojave, CA | 175.0 GWh | 4.1 mi |
| Rising Tree Wind Farm | Mojave, CA | 249.0 GWh | 16.3 mi |
| Rising Tree Wind Farm II | Mojave, CA | 58.7 GWh | 15.2 mi |
| Sky River Wind Energy Center | Tehachapi, CA | 245.0 GWh | 12.4 mi |
| Springbok 3 Solar Farm Hybrid | Cantil, CA | 251.7 GWh | 5.9 mi |
| Springbok Solar Farm 1 | Cantil, CA | 297.7 GWh | 4.1 mi |
| Springbok Solar Farm 2 | Cantil, CA | 399.0 GWh | 2.8 mi |