29956 Highway 14, Cantil, CA 93519Plant Summary Information
Hecate Energy Beacon Solar 1 is ranked #102 out of 816 solar farms in California in terms of total annual net electricity generation.
Hecate Energy Beacon Solar 1 generated 24.2 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Hecate Energy Beacon Solar 1 |
---|---|
Utility Name | AES Distributed Energy |
Location | Kern County, CA |
Initial Operation Date | April 2017 |
Last Update | Mar 2025 |
Annual Generation | 131.0 GWh |
Annual Consumption | 484.0 k MMBtu |
Ranked #2,943 out of 12,288 Power Plants Nationwide | |
Ranked #557 out of 6,174 Solar Power Plants Nationwide | |
Ranked #319 out of 1,564 California Power Plants | |
Ranked #102 out of 816 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Hecate Energy Beacon Solar 1, LLC (2013 to 2013) Sustainable Power Group, LLC (2014 to 2020) AES Distributed Energy (2021 to 2024) |
Map of Hecate Energy Beacon Solar 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hecate Energy Beacon Solar 1.
Monthly Net Generation for Hecate Energy Beacon Solar 1
Hecate Energy Beacon Solar 1 Details
Summary Information | |
---|---|
Plant Name | Hecate Energy Beacon Solar 1 (59315) |
Plant Address | 29956 Highway 14, Cantil, CA 93519 |
Utility | AES Distributed Energy (61012) |
Latitude, Longitude | 35.26944, -118.01444 |
Generation Dates on File | Apr 2017 to Mar 2025 |
Initial Operation Date | April 2017 |
Annual Generation | 131.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator BEAC1 Details Operating April 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 56 MW |
Summer Capacity | 51 MW |
Winter Capacity | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 63.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Hecate Energy Beacon Solar 1 Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#547 | Barefoot Bay Solar Energy Center | Sebastian, FL | 132.9 GWh |
#548 | Longbow Solar, LLC | Liverpool, TX | 132.8 GWh |
#549 | North Star Solar | Mendota, CA | 132.4 GWh |
#550 | Babcock Solar Energy Center Hybrid | Punta Gorda, FL | 131.6 GWh |
#551 | NC 102 Project LLC | Midland, NC | 131.7 GWh |
#552 | Innovative Solar 37 LLC | Morven, NC | 131.5 GWh |
#553 | Hecate Energy Beacon Solar 3 | Cantil, CA | 131.2 GWh |
#554 | Blue Cypress Solar Energy Center | Vero Beach, FL | 131.2 GWh |
#555 | Cotton Creek Solar Energy Center | McDavid, FL | 131.1 GWh |
#556 | Mesquite Solar 5, LLC | Tonopah, AZ | 120.9 GWh |
#558 | Lithia Solar | Lithia, FL | 130.6 GWh |
#559 | Crystal Hill Solar | Crystal Hill, VA | 130.6 GWh |
#560 | Great Cove Solar II | Saint Thomas, PA | 130.0 GWh |
#561 | Shoe Creek Solar, LLC | Laurinburg, NC | 129.7 GWh |
#562 | Paddock Solar | Beloit, WI | 129.4 GWh |
#563 | Farmington Solar | Farmington, ME | 129.4 GWh |
#564 | Falmouth Renewable Energy Center | Live Oak, FL | 129.3 GWh |
#565 | Anhinga Solar Energy Center | Green Cove Springs, FL | 129.2 GWh |
#566 | Gulf Power Blue Indigo Energy | Cottondale, FL | 129.0 GWh |
#567 | Luciana | Richgrove, CA | 128.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hecate Energy Beacon Solar 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alta Wind X | Mojave, CA | 336.5 GWh | 17.9 mi |
Beacon Solar Plant Site 2 | Cantil, CA | 114.7 GWh | 0.9 mi |
Beacon Solar Plant Site 5 | Cantil, CA | 96.1 GWh | 1.8 mi |
CalCity Solar 1 | California City, CA | 7.9 GWh | 9.3 mi |
California City | California City, CA | 4.6 GWh | 8 mi |
Difwind Farms Ltd VI | Mojave, CA | 14.9 GWh | 17.5 mi |
Edwards Sanborn S1 | Mojave, CA | 92.8 GWh | 18 mi |
Eland Solar & Storage Center, Phase 1 Hy | Mojave, CA | 205.6 GWh | 3.8 mi |
Hecate Energy Beacon Solar 3 | Cantil, CA | 131.2 GWh | 1.1 mi |
Hecate Energy Beacon Solar 4 | Cantil, CA | 116.1 GWh | 1.3 mi |
North Sky River Energy LLC | Weldon, CA | 435.0 GWh | 11.1 mi |
Pine Tree Solar Project | Owenyo, CA | 7.2 GWh | 10.6 mi |
Pine Tree Wind Power Project | Cantil, CA | 115.4 GWh | 9.2 mi |
RE Barren Ridge 1 | Mojave, CA | 175.0 GWh | 5.4 mi |
Rising Tree Wind Farm | Mojave, CA | 249.0 GWh | 17.6 mi |
Rising Tree Wind Farm II | Mojave, CA | 58.7 GWh | 16.5 mi |
Sky River Wind Energy Center | Tehachapi, CA | 245.0 GWh | 13.1 mi |
Springbok 3 Solar Farm Hybrid | Cantil, CA | 250.2 GWh | 6.8 mi |
Springbok Solar Farm 1 | Cantil, CA | 297.7 GWh | 3.6 mi |
Springbok Solar Farm 2 | Cantil, CA | 399.0 GWh | 2.5 mi |