Springbok Solar Farm 2
29977 Neuralia Road, Cantil, CA 93519Plant Summary Information
Springbok Solar Farm 2 is ranked #41 out of 854 solar farms in California in terms of total annual net electricity generation.
Springbok Solar Farm 2 generated 71.7 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Springbok Solar Farm 2 |
|---|---|
| Utility Name | 63SU 8me, LLC |
| Location | Kern County, CA |
| Initial Operation Date | September 2016 |
| Last Update | Dec 2024 |
| Annual Generation | 399.0 GWh |
| Annual Consumption | 1.4 M MMBtu |
| Ranked #1,612 out of 12,637 Power Plants Nationwide | |
| Ranked #169 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #116 out of 1,603 California Power Plants | |
| Ranked #41 out of 854 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Springbok Solar Farm 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Springbok Solar Farm 2.
Monthly Net Generation for Springbok Solar Farm 2
Monthly Plant Fuel Consumption for Springbok Solar Farm 2
Springbok Solar Farm 2 Details
| Summary Information | |
|---|---|
| Plant Name | Springbok Solar Farm 2 (59840) |
| Plant Address | 29977 Neuralia Road, Cantil, CA 93519 |
| Utility | 63SU 8me, LLC (59616) |
| Latitude, Longitude | 35.25003, -117.97685 |
| Generation Dates on File | Sep 2016 to Dec 2024 |
| Initial Operation Date | September 2016 |
| Annual Generation | 399.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 16-106-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator SB2 Details Operating September 2016
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 155 MW |
| Summer Capacity | 155 MW |
| Winter Capacity | 155 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2016 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| DC Net Capacity | 165 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Springbok Solar Farm 2 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #159 | Huck Finn Renewable Energy Center | Vandalia, MO | 414.6 GWh |
| #160 | Chaparral Springs | Rosamond, CA | 399.2 GWh |
| #161 | Sandrini Solar 200 | Mettler, CA | 411.1 GWh |
| #162 | Sun Streams, LLC | Arlington, AZ | 409.9 GWh |
| #163 | Oak Ridge Solar | Oak Ridge, LA | 406.9 GWh |
| #164 | Sherco Solar I | Clear Lake, MN | 406.4 GWh |
| #165 | Wright Solar Park | Los Banos, CA | 403.3 GWh |
| #166 | Mount Signal Solar Farm II | Calexico, CA | 401.9 GWh |
| #167 | Mesquite Solar 1 | Tonopah, AZ | 401.4 GWh |
| #168 | Crane Solar Project | Crane, TX | 401.1 GWh |
| #170 | Misae Solar | Childress, TX | 398.9 GWh |
| #171 | Chestnut | Lemoore, CA | 372.0 GWh |
| #172 | Crooked Lake Solar, LLC | Blytheville, AR | 394.6 GWh |
| #173 | Serrano | Marana, AZ | 372.3 GWh |
| #174 | North Rosamond Solar LLC | Rosamond, CA | 391.4 GWh |
| #175 | Riverstart Solar Park LLC | Modoc, IN | 390.5 GWh |
| #176 | Mustang Two | Lemoore, CA | 390.1 GWh |
| #177 | Shakes Solar | Carrizo Springs, TX | 389.3 GWh |
| #178 | Big Plain Solar, LLC | London, OH | 389.3 GWh |
| #179 | Scarlet II Hybrid | Cantua Creek, CA | 367.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Springbok Solar Farm 2.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Beacon Solar Plant Site 2 | Cantil, CA | 111.7 GWh | 1.7 mi |
| Beacon Solar Plant Site 5 | Cantil, CA | 88.5 GWh | 3.3 mi |
| Bellefield Solar and Energy Storage Farm | Mojave, CA | 143.9 GWh | 14.4 mi |
| CalCity Solar 1 | California City, CA | 7.9 GWh | 7.5 mi |
| California City | California City, CA | 4.6 GWh | 6.4 mi |
| Difwind Farms Ltd VI | Mojave, CA | 14.9 GWh | 17.6 mi |
| Edwards Sanborn S1 | Mojave, CA | 100.4 GWh | 17.7 mi |
| Eland Solar & Storage Center, Phase 1 Hy | Mojave, CA | 665.8 GWh | 1.8 mi |
| Eland Solar & Storage Center, Phase 2 Hy | Mojave, CA | 329.0 GWh | 2.3 mi |
| Hecate Energy Beacon Solar 1 | Cantil, CA | 127.6 GWh | 2.5 mi |
| Hecate Energy Beacon Solar 3 | Cantil, CA | 120.7 GWh | 2.1 mi |
| Hecate Energy Beacon Solar 4 | Cantil, CA | 115.3 GWh | 2.8 mi |
| North Sky River Energy LLC | Weldon, CA | 435.0 GWh | 13.6 mi |
| Pine Tree Solar Project | Owenyo, CA | 7.2 GWh | 12.4 mi |
| Pine Tree Wind Power Project | Cantil, CA | 115.4 GWh | 11.2 mi |
| RE Barren Ridge 1 | Mojave, CA | 175.0 GWh | 6.1 mi |
| Rising Tree Wind Farm II | Mojave, CA | 58.7 GWh | 17.1 mi |
| Sky River Wind Energy Center | Tehachapi, CA | 245.0 GWh | 15.3 mi |
| Springbok 3 Solar Farm Hybrid | Cantil, CA | 243.2 GWh | 5.6 mi |
| Springbok Solar Farm 1 | Cantil, CA | 297.7 GWh | 1.2 mi |