UCLA So Campus Cogen Project
721 Charles E. Young Dr., S, Los Angeles, CA 90095Plant Summary Information
UCLA So Campus Cogen Project is ranked #47 out of 316 natural gas power plants in California in terms of total annual net electricity generation.
UCLA So Campus Cogen Project is comprised of 3 generators and generated 51.7 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | UCLA So Campus Cogen Project |
|---|---|
| Utility Name | University of California-LA |
| Location | Los Angeles County, CA |
| Initial Operation Date | October 1993 |
| Last Update | Jun 2026 |
| Annual Generation | 245.8 GWh |
| Annual Consumption | 3.4 M MMBtu |
| Ranked #2,294 out of 13,094 Power Plants Nationwide | |
| Ranked #693 out of 2,208 Natural Gas Power Plants Nationwide | |
| Ranked #220 out of 1,607 California Power Plants | |
| Ranked #47 out of 316 California Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of UCLA So Campus Cogen Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for UCLA So Campus Cogen Project.
Monthly Net Generation for UCLA So Campus Cogen Project
Monthly Plant Fuel Consumption for UCLA So Campus Cogen Project
UCLA So Campus Cogen Project Details
| Summary Information | |
|---|---|
| Plant Name | UCLA So Campus Cogen Project (52073) |
| Plant Address | 721 Charles E. Young Dr., S, Los Angeles, CA 90095 |
| Utility | University of California-LA (19524) |
| Latitude, Longitude | 34.0692, -118.4439 |
| Generation Dates on File | Jan 2001 to Jun 2026 |
| Initial Operation Date | October 1993 |
| Annual Generation | 245.8 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
| NAICS Code | Educational Services (611) |
| Sector | Commercial CHP (5) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | SOUTHERN CALIFORNIA GAS COMPANY |
| Natural Gas Storage | No |
Generator GEN3 Details Operating October 1993
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 14 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 11 MW |
| Winter Capacity | 12 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 1993 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator GEN-B Details Operating October 2025
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 16.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 13.5 MW |
| Winter Capacity | 14.2 MW |
| Minimum Load | 8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2025 |
| Combined Heat & Power | Yes |
|---|---|
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 13.5 MW |
| Net Winter Capacity With Natural Gas | 14.2 MW |
| Net Summer Capacity With Oil | 13.5 MW |
| Net Winter Capacity With Oil | 14.2 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | UNK |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator GEN-A Details Operating March 2025
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 16.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 13.5 MW |
| Winter Capacity | 14.2 MW |
| Minimum Load | 8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2025 |
| Combined Heat & Power | Yes |
|---|---|
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 13.5 MW |
| Net Winter Capacity With Natural Gas | 14.2 MW |
| Net Summer Capacity With Oil | 13.5 MW |
| Net Winter Capacity With Oil | 14.2 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | UNK |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
UCLA So Campus Cogen Project Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #683 | Portside Energy | Portage, IN | 262.4 GWh |
| #684 | Sylvarena | Raleigh, MS | 262.1 GWh |
| #685 | Ames Electric Services Power Plant | Ames, IA | 285.0 GWh |
| #686 | Hardin County Peaking Facility | Kountze, TX | 256.8 GWh |
| #687 | US Borax | Boron, CA | 256.5 GWh |
| #688 | Salinas River Cogeneration | San Ardo, CA | 255.2 GWh |
| #689 | Manchief Electric Generating Station | Brush, CO | 254.9 GWh |
| #690 | Nevada Cogen Associates 2 Black Mountain | Las Vegas, NV | 254.0 GWh |
| #691 | Milford Power LP | Milford, MA | 253.3 GWh |
| #692 | Archer Daniels Midland Cedar Rapids | Cedar Rapids, IA | 1.0 TWh |
| #694 | Corpus Refinery | Corpus Christi, TX | 271.3 GWh |
| #695 | Chambersburg | Chambersburg, PA | 244.4 GWh |
| #696 | New-Indy Ontario Mill | Ontario, CA | 244.3 GWh |
| #697 | Brotman Power Station | Rosharon, TX | 242.9 GWh |
| #698 | Exira | Brayton, IA | 243.5 GWh |
| #699 | Consumer Operations LLC | Green Bay, WI | 240.4 GWh |
| #700 | Exelon West Medway II LLC | Medway, MA | 252.4 GWh |
| #701 | West Gardner | Johnson, KS | 239.2 GWh |
| #702 | Angus Anson | Sioux Falls, SD | 238.5 GWh |
| #703 | Edward L. Addison Generating Plant | Thomaston, GA | 241.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding UCLA So Campus Cogen Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ATT Van Nyus | Van Nuys, CA | 7.5 GWh | 8.8 mi |
| ATT Ventura Blvd | Sherman Oaks, CA | 8.3 GWh | 5.8 mi |
| CBS Television City | Los Angeles, CA | 977.0 MWh | 4.8 mi |
| Central Utilities Plant LAX 2 | Los Angeles, CA | 31.8 GWh | 9 mi |
| Comcast - Universal City | Universal City, CA | 6.9 GWh | 6.7 mi |
| DirecTV - Los Angeles | Los Angeles, CA | 7.9 GWh | 6 mi |
| Disney Prospect | Los Angeles, CA | 8.0 GWh | 1.1 mi |
| El Segundo Energy Center LLC | El Segundo, CA | 47.1 GWh | 11 mi |
| Equinix Douglas St. Fuel Cell | El Segundo, CA | 15.5 GWh | 10.8 mi |
| Equinix Maple Ave. Fuel Cell | El Segundo, CA | 8.0 GWh | 10.3 mi |
| Hyperion Treatment Plant CHP Plant | Playa del Rey, CA | 156.1 GWh | 10 mi |
| Kaiser - LA | Los Angeles, CA | 36.9 GWh | 8.7 mi |
| Kaiser - Woodland Hills | Woodland Hills, CA | 21.2 GWh | 11 mi |
| Lake One | Burbank, CA | 3.4 GWh | 10.5 mi |
| Magnolia Power Project | Burbank, CA | 1.2 TWh | 10.5 mi |
| PAC Aviation Solar | Van Nuys, CA | 3.0 GWh | 10.6 mi |
| Pacific Aviation | Van Nuys, CA | 2.9 GWh | 10.5 mi |
| Pierce College | Wilmington, CA | 143.0 MWh | 10.9 mi |
| Scattergood | Playa del Rey, CA | 1.4 TWh | 10.5 mi |
| Toyon Power Station | Los Angeles, CA | 5.0 GWh | 9.6 mi |