Springbok Solar Farm 1
29999 Neuralia Rd., Cantil, CA 93519Plant Summary Information
Springbok Solar Farm 1 is ranked #68 out of 852 solar farms in California in terms of total annual net electricity generation.
Springbok Solar Farm 1 generated 52.9 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Springbok Solar Farm 1 |
|---|---|
| Utility Name | 62SK 8me, LLC |
| Location | Kern County, CA |
| Initial Operation Date | July 2016 |
| Last Update | Dec 2024 |
| Annual Generation | 297.7 GWh |
| Annual Consumption | 1.1 M MMBtu |
| Ranked #2,000 out of 12,613 Power Plants Nationwide | |
| Ranked #272 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #177 out of 1,603 California Power Plants | |
| Ranked #68 out of 852 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Springbok Solar Farm 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Springbok Solar Farm 1.
Monthly Net Generation for Springbok Solar Farm 1
Monthly Plant Fuel Consumption for Springbok Solar Farm 1
Springbok Solar Farm 1 Details
| Summary Information | |
|---|---|
| Plant Name | Springbok Solar Farm 1 (59532) |
| Plant Address | 29999 Neuralia Rd., Cantil, CA 93519 |
| Utility | 62SK 8me, LLC (59273) |
| Latitude, Longitude | 35.24917, -117.95528 |
| Generation Dates on File | Jul 2016 to Dec 2024 |
| Initial Operation Date | July 2016 |
| Annual Generation | 297.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 16-57-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator SB1 Details Operating July 2016
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 105 MW |
| Summer Capacity | 105 MW |
| Winter Capacity | 105 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2016 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| DC Net Capacity | 136.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Springbok Solar Farm 1 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #262 | Concho Valley Solar, LLC | San Angelo, TX | 303.6 GWh |
| #263 | Baldy Mesa Solar & Storage | Adelanto, CA | 297.4 GWh |
| #264 | Samson Solar Energy II LLC | Cunningham, TX | 302.7 GWh |
| #265 | Oberon IA | Odessa, TX | 302.7 GWh |
| #266 | Cavalier Solar | Smithfield, VA | 301.8 GWh |
| #267 | Copperhead Solar, LLC | Riesel, TX | 296.7 GWh |
| #268 | Pixley Solar Energy | Pixley, KS | 299.6 GWh |
| #269 | Upton County Solar | McCamey, TX | 299.1 GWh |
| #270 | Skipjack Solar Center | Wayside, VA | 298.4 GWh |
| #271 | Hudson - High Desert Hybrid | Victorville, CA | 289.0 GWh |
| #273 | Harry Allen Solar Energy LLC | Apex, NV | 296.9 GWh |
| #274 | Paris Solar | Union Grove, WI | 296.4 GWh |
| #275 | Campo Verde Solar | El Centro, CA | 294.7 GWh |
| #276 | North Fork Solar Project | Snyder, OK | 294.3 GWh |
| #277 | River Fork Solar, LLC | Albion, MI | 293.4 GWh |
| #278 | Hardin Solar Energy LLC | Alger, OH | 291.5 GWh |
| #279 | Nebula Solar | La Feria, TX | 291.3 GWh |
| #280 | Wistaria Ranch Solar | Calexico, CA | 288.9 GWh |
| #281 | Valentine Solar, LLC | Rosamond, CA | 287.7 GWh |
| #282 | Highlander Solar Energy Station 1 | Spotsylvania, VA | 286.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Springbok Solar Farm 1.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Beacon Solar Plant Site 2 | Cantil, CA | 112.3 GWh | 2.7 mi |
| Beacon Solar Plant Site 5 | Cantil, CA | 88.5 GWh | 4.5 mi |
| CalCity Solar 1 | California City, CA | 7.9 GWh | 7.5 mi |
| California City | California City, CA | 4.6 GWh | 6.5 mi |
| Difwind Farms Ltd VI | Mojave, CA | 14.9 GWh | 18.4 mi |
| Edwards Sanborn S1 | Mojave, CA | 100.5 GWh | 18.3 mi |
| Edwards Sanborn S3 | Mojave, CA | 83.8 GWh | 18.7 mi |
| Eland Solar & Storage Center, Phase 1 Hy | Mojave, CA | 684.0 GWh | 2.1 mi |
| Eland Solar & Storage Center, Phase 2 Hy | Mojave, CA | 260.1 GWh | 2.6 mi |
| Hecate Energy Beacon Solar 1 | Cantil, CA | 128.7 GWh | 3.6 mi |
| Hecate Energy Beacon Solar 3 | Cantil, CA | 122.1 GWh | 3.4 mi |
| Hecate Energy Beacon Solar 4 | Cantil, CA | 115.9 GWh | 4.1 mi |
| North Sky River Energy LLC | Weldon, CA | 435.0 GWh | 14.7 mi |
| Pine Tree Solar Project | Owenyo, CA | 7.2 GWh | 13.6 mi |
| Pine Tree Wind Power Project | Cantil, CA | 115.4 GWh | 12.4 mi |
| RE Barren Ridge 1 | Mojave, CA | 175.0 GWh | 7.1 mi |
| Rising Tree Wind Farm II | Mojave, CA | 58.7 GWh | 18 mi |
| Sky River Wind Energy Center | Tehachapi, CA | 245.0 GWh | 16.5 mi |
| Springbok 3 Solar Farm Hybrid | Cantil, CA | 251.1 GWh | 6 mi |
| Springbok Solar Farm 2 | Cantil, CA | 399.0 GWh | 1.2 mi |