TA-High Desert LLC
9716 W Avenue I, Lancaster, CA 93535Plant Summary Information
TA-High Desert LLC is ranked #140 out of 818 solar farms in California in terms of total annual net electricity generation.
TA-High Desert LLC generated 10.2 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | TA-High Desert LLC |
---|---|
Utility Name | TA-High Desert LLC |
Location | Los Angeles County, CA |
Initial Operation Date | March 2013 |
Last Update | Dec 2024 |
Annual Generation | 56.8 GWh |
Annual Consumption | 202.7 k MMBtu |
Ranked #3,886 out of 12,312 Power Plants Nationwide | |
Ranked #890 out of 6,191 Solar Power Plants Nationwide | |
Ranked #438 out of 1,568 California Power Plants | |
Ranked #140 out of 818 California Solar Power Plants | |
Fuel Types | Solar |
Map of TA-High Desert LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for TA-High Desert LLC.
Monthly Net Generation for TA-High Desert LLC
TA-High Desert LLC Details
Summary Information | |
---|---|
Plant Name | TA-High Desert LLC (58149) |
Plant Address | 9716 W Avenue I, Lancaster, CA 93535 |
Utility | TA-High Desert LLC (58112) |
Latitude, Longitude | 34.70889, -118.30472 |
Generation Dates on File | Mar 2013 to Dec 2024 |
Initial Operation Date | March 2013 |
Annual Generation | 56.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 12-365-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 66.00 kV |
Energy Storage | No |
Generator TAHD Details Operating March 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | TOT427A_7_N001 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | TOT427A_7_N001 |
Nameplate Capacity | 20 MW |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 25.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
TA-High Desert LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#880 | Oberon IB | Odessa, TX | 58.3 GWh |
#881 | RE Garland A | Rosamond, CA | 58.2 GWh |
#882 | Innovative Solar 31 | Bladenboro, NC | 58.1 GWh |
#883 | Sunlight Road Solar | Franklinton, LA | 57.9 GWh |
#884 | Alton Post Office Solar | Alton, VA | 57.8 GWh |
#885 | Sunray 2 | Daggett, CA | 57.7 GWh |
#886 | Antelope DSR 3 | Lancaster, CA | 57.7 GWh |
#887 | Baldwin Solar BESS | Baldwin, IL | 57.4 GWh |
#888 | Baxley | Baxley, GA | 57.4 GWh |
#889 | Techren Solar III LLC | Boulder, NV | 56.8 GWh |
#891 | Techren Solar IV LLC | Boulder, NV | 56.7 GWh |
#892 | Pinal Central Energy Center Hybrid | Casa Grande, AZ | 54.1 GWh |
#893 | TAI Huntsville Solar Hybrid | Huntsville, AL | 56.6 GWh |
#894 | Webberville Solar Project | Manor, TX | 56.3 GWh |
#895 | SR McNeal | McNeal, AZ | 53.6 GWh |
#896 | Edwards Sanborn E3 | Mojave, CA | 54.7 GWh |
#897 | Kingbird B Solar, LLC | Rosamond, CA | 55.8 GWh |
#898 | Fairbanks Solar Project | Fairbanks, IN | 55.6 GWh |
#899 | Apache Solar I | Cochise, AZ | 55.5 GWh |
#900 | Innovative Solar 47 | Maxton, NC | 55.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding TA-High Desert LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Antelope Big Sky Ranch | Lancaster, CA | 54.0 GWh | 1.4 mi |
Antelope DSR 2 | Lancaster, CA | 12.0 GWh | 1.6 mi |
Antelope Expansion 3A | Lancaster, CA | 31.7 GWh | 1.7 mi |
Antelope Expansion 3B | Lancaster, CA | 11.0 GWh | 1.3 mi |
Central Antelope Dry Ranch B LLC | Lancaster, CA | 6.7 GWh | 0.3 mi |
Central Antelope Dry Ranch C | Lancaster, CA | 33.3 GWh | 0.8 mi |
Elevation Solar C | Lancaster, CA | 101.5 GWh | 1.5 mi |
Lancaster Dry Farm Ranch B | Lancaster, CA | 7.8 GWh | 1 mi |
North Lancaster Ranch | Lancaster, CA | 37.2 GWh | 0.9 mi |
Portal Ridge Solar B, LLC | Lancaster, CA | 46.9 GWh | 1.4 mi |
Rodeo Solar C2 | Lancaster, CA | 2.9 GWh | 0.9 mi |
Rodeo Solar D2 | Lancaster, CA | 2.6 GWh | 0.9 mi |
Summer North Solar | Lancaster, CA | 10.0 GWh | 1.3 mi |
Summer Solar A2 | Lancaster, CA | 3.2 GWh | 1.3 mi |
Summer Solar B2 | Lancaster, CA | 3.0 GWh | 1.3 mi |
Summer Solar C2 | Lancaster, CA | 2.5 GWh | 1.3 mi |
Summer Solar D2 | Lancaster, CA | 1.8 GWh | 1.3 mi |
Summer Solar LLC | Lancaster, CA | 49.1 GWh | 0.5 mi |
Western Antelope Blue Sky B | Lancaster, CA | 50.2 GWh | 1.7 mi |
Western Antelope Dry Ranch | Lancaster, CA | 21.8 GWh | 1.6 mi |