Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
TA-High Desert LLC | TA-High Desert LLC | Lancaster, CA | California Independent System Operator (CISO) | 56.8 GWh | Feb 2013 | Dec 2024 | Solar |
North Sky River Energy LLC | North Sky River Energy LLC | Weldon, CA | California Independent System Operator (CISO) | 435.0 GWh | Nov 2012 | Dec 2024 | Wind |
Energy Center | University of Redlands | Redlands, CA | California Independent System Operator (CISO) | 1.5 GWh | Jan 2007 | Dec 2024 | Natural Gas |
CSUF Trigeneration | California State University at Fullerton | Fullerton, CA | California Independent System Operator (CISO) | 38.0 GWh | Sep 2010 | Apr 2025 | Natural Gas : 82.1% Solar : 17.9% |
Parnassus Central Utility Plant | University of California-San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 68.7 GWh | Dec 1995 | Apr 2025 | Natural Gas |
Sentinel Energy Center, LLC | Sentinel Energy Center LLC | Desert Hot Springs, CA | California Independent System Operator (CISO) | 311.2 GWh | Apr 2013 | Apr 2025 | Natural Gas |
Sand Drag LLC | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 28.2 GWh | Jul 2011 | Dec 2024 | Solar |
AV Solar Ranch One | AV Solar Ranch 1 LLC | Lancaster, CA | California Independent System Operator (CISO) | 568.9 GWh | Jul 2014 | Apr 2025 | Solar |
Genesis Solar Energy Project | Genesis Solar LLC | Blythe, CA | California Independent System Operator (CISO) | 644.3 GWh | Oct 2013 | Apr 2025 | Solar |
Yolo County Solar Project | Yolo County of | Woodland, CA | California Independent System Operator (CISO) | 534.0 MWh | Nov 2010 | Dec 2023 | Solar |
California Valley Solar Ranch | Clearway Energy Operating LLC | California Valley, CA | California Independent System Operator (CISO) | 597.7 GWh | Aug 2012 | Dec 2024 | Solar |
Solar Photovoltaic Project #42 | Southern California Edison Co | Tulare, CA | California Independent System Operator (CISO) | 7.6 GWh | Oct 2012 | Dec 2024 | Solar |
Solar Borrego I | NRG Solar Borrego I | Borrego Springs, CA | California Independent System Operator (CISO) | 62.2 GWh | Jan 2013 | Dec 2024 | Solar |
Mountain View IV | AES Distributed Energy | North Palm Springs, CA | California Independent System Operator (CISO) | 186.8 GWh | Jan 2012 | Dec 2024 | Wind |
Caltech Central | Bloom Energy 2009 PPA | Pasadena, CA | California Independent System Operator (CISO) | 8.7 GWh | Oct 2010 | Dec 2024 | Natural Gas |
Sun City Project LLC | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 33.9 GWh | Jul 2011 | Dec 2024 | Solar |
Mariposa Energy Project | Diamond Generating Corporation | Byron, CA | California Independent System Operator (CISO) | 73.7 GWh | Sep 2012 | Apr 2025 | Natural Gas |
Manzana Wind LLC | Avangrid Power LLC | Rosamond, CA | California Independent System Operator (CISO) | 543.7 GWh | Nov 2012 | Dec 2024 | Wind |
Imperial Solar Energy Center South | CSOLAR IV South LLC | Calexico, CA | California Independent System Operator (CISO) | 264.3 GWh | Oct 2013 | Dec 2024 | Solar |
Imperial Solar Energy Center West | CSOLAR IV West LLC | Seeley, CA | California Independent System Operator (CISO) | 373.6 GWh | Mar 2016 | Dec 2024 | Solar |
Stroud Solar Station | Pacific Gas & Electric Co. | Helm, CA | California Independent System Operator (CISO) | 25.0 GWh | Aug 2011 | Oct 2024 | Solar |
Five Points Solar Station | Pacific Gas & Electric Co. | Five Points, CA | California Independent System Operator (CISO) | 15.4 GWh | Aug 2011 | Dec 2024 | Solar |
Westside Solar Station | Pacific Gas & Electric Co. | Five Points, CA | California Independent System Operator (CISO) | 13.9 GWh | Jul 2011 | Dec 2024 | Solar |
FRV SI Transport Solar LP | FRV SI Transport Solar, L.P. (Sacremento) | Sacramento, CA | California Independent System Operator (CISO) | 1.4 GWh | Jul 2010 | Dec 2024 | Solar |
Ocotillo Express LLC | Pattern Operators LP | Ocotillo, CA | California Independent System Operator (CISO) | 525.8 GWh | Nov 2012 | Apr 2025 | Wind |
Alta Wind Energy Center II | Alta Wind II, LLC | Mojave, CA | California Independent System Operator (CISO) | 299.7 GWh | Dec 2010 | Dec 2023 | Wind |
Ivanpah 2 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 276.7 GWh | Nov 2013 | Apr 2025 | Solar : 95.9% Natural Gas : 4.1% |
Ivanpah 1 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 179.1 GWh | Nov 2013 | Apr 2025 | Solar : 96.4% Natural Gas : 3.6% |
Ivanpah 3 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 261.8 GWh | Nov 2013 | Apr 2025 | Solar : 96.2% Natural Gas : 3.8% |
UCI Facilities Management Central Plant | University of California Irvine | Irvine, CA | California Independent System Operator (CISO) | 112.1 GWh | Jun 2007 | Apr 2025 | Natural Gas |
G2 Energy Ostrom Road LLC | G2 Energy LLC | Wheatland, CA | California Independent System Operator (CISO) | 29.0 GWh | Jan 2009 | Dec 2024 | Landfill Gas |
Calabasas Gas to Energy Facility | Los Angeles County Sanitation | Agoura, CA | California Independent System Operator (CISO) | 36.3 GWh | Jun 2010 | Dec 2024 | Landfill Gas |
FPL Energy Montezuma Winds LLC | FPL Energy Montezuma Wind | Birds Landing, CA | California Independent System Operator (CISO) | 85.4 GWh | Oct 2010 | Dec 2024 | Wind |
Marsh Landing Generating Station | Marsh Landing LLC | Antioch, CA | California Independent System Operator (CISO) | 118.9 GWh | Apr 2013 | Apr 2025 | Natural Gas |
Alta Wind Energy Center I | Alta Wind I, LLC | Mojave, CA | California Independent System Operator (CISO) | 361.0 GWh | Dec 2010 | Dec 2023 | Wind |
Walnut Creek Energy Park | Walnut Creek LLC | Industry, CA | California Independent System Operator (CISO) | 204.3 GWh | Mar 2013 | Apr 2025 | Natural Gas |
Alta Wind Energy Center III | Alta Wind III, LLC | Mojave, CA | California Independent System Operator (CISO) | 302.6 GWh | Jan 2011 | Dec 2023 | Wind |
Alta Wind Energy Center IV | Alta Wind IV, LLC | Mojave, CA | California Independent System Operator (CISO) | 147.8 GWh | Mar 2011 | Dec 2023 | Wind |
Alta Wind Energy Center V | Alta Wind V, LLC | Mojave, CA | California Independent System Operator (CISO) | 288.4 GWh | Mar 2011 | Dec 2024 | Wind |
Alpine Solar | Alpine BESS LLC | Lancaster, CA | California Independent System Operator (CISO) | 118.8 GWh | Jan 2013 | Dec 2024 | Solar |
Garnet Wind Energy Center | Terra-Gen Operating Co-Wind | North Palm Springs, CA | California Independent System Operator (CISO) | 11.9 GWh | May 2009 | Dec 2024 | Wind |
Mojave Solar Project | Mojave Solar LLC | Hinkley, CA | California Independent System Operator (CISO) | 601.6 GWh | Nov 2014 | Apr 2025 | Solar |
Panoche Valley Solar Farm | Consolidated Edison Development Inc. | Paicines, CA | California Independent System Operator (CISO) | 317.6 GWh | Dec 2017 | Apr 2025 | Solar |
Avenal Park | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 9.5 GWh | Jul 2011 | Dec 2024 | Solar |
Watkins Manufacturing Co. | Watkins Manufacturing Corporation | San Diego, CA | California Independent System Operator (CISO) | 6.5 GWh | Oct 2001 | Apr 2025 | Natural Gas |
City of Madera WWTP | SunE GIL1, LLC | Madera, CA | California Independent System Operator (CISO) | 1.4 GWh | Aug 2009 | Dec 2024 | Solar |
Staples La Mirada, CA | SunE WF3-ST Holdings, LLC | La Mirada, CA | California Independent System Operator (CISO) | 871.0 MWh | Feb 2009 | Dec 2024 | Solar |
Topaz Solar Farm | Topaz Solar Farms LLC | Santa Margarita, CA | California Independent System Operator (CISO) | 1.0 TWh | Mar 2013 | Apr 2025 | Solar |
Power Generation Station (PGS) 2 | East Bay Municipal Util Dist | Oakland, CA | California Independent System Operator (CISO) | 16.5 GWh | Nov 2011 | Dec 2024 | Other Biomass Gas |
Vasco Winds | Vasco Winds, LLC | Livermore, CA | California Independent System Operator (CISO) | 223.0 GWh | Nov 2011 | Dec 2024 | Wind |
Montezuma Wind II | NextEra Energy Montezuma Wind II, LLC | Birds Landing, CA | California Independent System Operator (CISO) | 195.7 GWh | Dec 2011 | Dec 2024 | Wind |
Signal Hill West Unit | Signal Hill Petroleum, Inc | Signal Hill, CA | California Independent System Operator (CISO) | 38.4 GWh | Jun 2004 | Apr 2025 | Other Gas |
Catalina Solar LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 262.2 GWh | Nov 2012 | Dec 2024 | Solar |
City of Palo Alto | City of Palo Alto | Palo Alta, CA | California Independent System Operator (CISO) | 20.6 MWh | Feb 2002 | Dec 2023 | Natural Gas |
Temescal Canyon RV, LLC | Temescal Canyon RV, LLC | Corona, CA | California Independent System Operator (CISO) | 1.9 GWh | Apr 2011 | Dec 2024 | Solar |
North Palm Springs 4A | Greenbacker Renewable Energy Corporation | Palm Springs, CA | California Independent System Operator (CISO) | 7.9 GWh | Sep 2012 | Dec 2024 | Solar |
Shiloh IV Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 278.3 GWh | Nov 2012 | Dec 2024 | Wind |
North Palm Springs 1A | Greenbacker Renewable Energy Corporation | Palm Springs, CA | California Independent System Operator (CISO) | 5.2 GWh | Mar 2012 | Dec 2024 | Solar |
Pacific Wind LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 311.2 GWh | Jul 2012 | Dec 2024 | Wind |
Naval Air Weapons Station China Lake | MN8 Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 22.0 GWh | Aug 2012 | Dec 2024 | Solar |
Ameresco Butte County | Ameresco Butte County LLC | Paradise, CA | California Independent System Operator (CISO) | 16.8 GWh | Jan 2013 | Dec 2024 | Landfill Gas |
Palo Verde College | Scale Sustainable I, LLC | Blythe, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2009 | Dec 2023 | Solar |
Windstar 1 | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 263.0 GWh | Jan 2012 | Dec 2024 | Wind |
Foundation AB | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2011 | Dec 2024 | Wind |
Broadridge Cogen | Broadridge Customer Communications | El Dorado Hills, CA | California Independent System Operator (CISO) | 15.8 GWh | Apr 2008 | Dec 2024 | Natural Gas : 91.9% Solar : 8.1% |
Giffen | Pacific Gas & Electric Co. | TBD, CA | California Independent System Operator (CISO) | 13.6 GWh | May 2012 | Dec 2024 | Solar |
Cantua Solar Station | Pacific Gas & Electric Co. | TBD, CA | California Independent System Operator (CISO) | 31.2 GWh | May 2012 | Dec 2024 | Solar |
Huron Solar Station | Pacific Gas & Electric Co. | Huron, CA | California Independent System Operator (CISO) | 28.8 GWh | May 2012 | Dec 2024 | Solar |
Pio Pico Energy Center | Pio Pico Energy Center LLC | San Diego, CA | California Independent System Operator (CISO) | 65.9 GWh | Oct 2016 | Dec 2024 | Natural Gas |
Sunnyvale City of WPCP | Sunnyvale City of WPCP | Sunnyvale, CA | California Independent System Operator (CISO) | 9.5 GWh | Oct 1997 | Dec 2024 | Natural Gas : 48.8% Other Biomass Gas : 28.3% Landfill Gas : 22.9% |
Sunset Reservoir North Basin | Duke Energy Renewables Services | San Francisco, CA | California Independent System Operator (CISO) | 6.5 GWh | Aug 2010 | Dec 2024 | Solar |
Algonquin Power Sanger LLC | Algonquin Power Sanger LLC | Sanger, CA | California Independent System Operator (CISO) | 10.0 GWh | Nov 2007 | Jan 2025 | Natural Gas |
CCCSD Wastewater Treatment Plnt | Central Contra Costa Sanitary District | Martinez, CA | California Independent System Operator (CISO) | 16.4 GWh | Nov 1995 | Apr 2025 | Natural Gas |
Robert O Schulz Solar Farm | South San Joaquin Irr District | Oakdale, CA | California Independent System Operator (CISO) | 2.1 GWh | Apr 2008 | Dec 2024 | Solar |
Vaca Dixon Solar Station | Pacific Gas & Electric Co. | Vacaville, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2009 | Dec 2024 | Solar |
University of California San Diego Hybri | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 219.1 GWh | Jun 2001 | Apr 2025 | Natural Gas |
Oxnard Paper Mill | New-Indy, Oxnard LLC | Oxnard, CA | California Independent System Operator (CISO) | 190.8 GWh | Feb 1986 | Apr 2025 | Natural Gas |
Shiloh III Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 265.2 GWh | Nov 2011 | Dec 2024 | Wind |
Teichert Materials-Teichert Vernalis | Foundation HA Energy Generation, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 1.9 GWh | Sep 2010 | Dec 2024 | Wind |
Rising Tree Wind Farm | Rising Tree Wind Farm LLC | Mojave, CA | California Independent System Operator (CISO) | 249.0 GWh | Dec 2014 | Dec 2024 | Wind |
Foundation ST | Foundation HA Energy Generation, LLC | Tracy, CA | California Independent System Operator (CISO) | 2.2 GWh | May 2011 | Dec 2024 | Wind |
Regulus Solar Project | Regulus Solar, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 153.6 GWh | Oct 2014 | Dec 2024 | Solar |
Adobe Solar | Southern Power Co | Arvin, CA | California Independent System Operator (CISO) | 39.6 GWh | Apr 2014 | Dec 2024 | Solar |
Sacramento Municipal Util Dist | South Sutter Water District | Sacramento, CA | California Independent System Operator (CISO) | 15.9 GWh | Jan 1985 | Mar 2024 | Water |
Thermalito | California Dept. of Water Resources | Oroville, CA | California Independent System Operator (CISO) | 340.5 GWh | Jan 1968 | Apr 2025 | Water |
Colgate | Yuba County Water Agency | Dobbins, CA | California Independent System Operator (CISO) | 1.5 TWh | Sep 1969 | Apr 2025 | Water |
Narrows 2 | Yuba County Water Agency | Browns Valley, CA | California Independent System Operator (CISO) | 156.8 GWh | Nov 1969 | Dec 2024 | Water |
Bear Valley | City of Escondido - (CA) | Escondido, CA | California Independent System Operator (CISO) | 4.2 GWh | May 1986 | Dec 2024 | Water |
Temescal | Metropolitan Water District of S CA | Corona, CA | California Independent System Operator (CISO) | 16.8 GWh | Jun 1983 | Dec 2024 | Water |
Corona | Metropolitan Water District of S CA | Corona, CA | California Independent System Operator (CISO) | 14.5 GWh | Jul 1983 | Dec 2024 | Water |
Perris | Metropolitan Water District of S CA | Perris, CA | California Independent System Operator (CISO) | 5.4 GWh | Apr 1983 | Jan 2024 | Water |
Red Mountain | Metropolitan Water District of S CA | Fallbrook, CA | California Independent System Operator (CISO) | 34.3 GWh | May 1985 | Oct 2024 | Water |
Sonoma California Geothermal | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 447.6 GWh | Nov 1983 | Dec 2024 | Geothermal |
Edward C Hyatt | California Dept. of Water Resources | Oroville, CA | California Independent System Operator (CISO) | 2.2 TWh | Feb 1968 | Apr 2025 | Water |
Camanche | East Bay Municipal Util Dist | Clements & Wallace, CA | California Independent System Operator (CISO) | 31.7 GWh | Jun 1983 | Dec 2024 | Water |
Newcastle | Pacific Gas & Electric Co. | Auburn, CA | California Independent System Operator (CISO) | 7.5 GWh | Nov 1986 | Dec 2024 | Water |
Kerckhoff 2 | Pacific Gas & Electric Co. | Auberry, CA | California Independent System Operator (CISO) | 407.9 GWh | Apr 1983 | Apr 2025 | Water |
Toadtown | Pacific Gas & Electric Co. | Magalia, CA | California Independent System Operator (CISO) | 2.4 GWh | Mar 1986 | Oct 2024 | Water |
Etiwanda | Metropolitan Water District of S CA | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 21.1 GWh | Nov 1994 | Mar 2024 | Water |
Moccasin Low Head Hydro Project | City & County of San Francisco | Moccasin, CA | California Independent System Operator (CISO) | 4.0 MWh | Jun 1987 | Nov 2024 | Water |
Browse Power Plants By California Counties
Figures are based on April 2025 generation numbers.County | State Rank | Active Plants | Apr 2025 Generation |
---|---|---|---|
Kern County, CA | # 1 | 311 | 34.0 TWh |
Los Angeles County, CA | # 2 | 307 | 20.7 TWh |
San Luis Obispo County, CA | # 3 | 22 | 20.6 TWh |
Riverside County, CA | # 4 | 159 | 14.3 TWh |
San Bernardino County, CA | # 5 | 203 | 13.4 TWh |
Contra Costa County, CA | # 6 | 56 | 13.4 TWh |
Imperial County, CA | # 7 | 84 | 9.7 TWh |
Fresno County, CA | # 8 | 109 | 8.1 TWh |
Shasta County, CA | # 9 | 46 | 7.2 TWh |
Sacramento County, CA | # 10 | 64 | 6.4 TWh |
Sonoma County, CA | # 11 | 26 | 5.2 TWh |
San Diego County, CA | # 12 | 150 | 5.0 TWh |
Santa Clara County, CA | # 13 | 74 | 4.4 TWh |
Kings County, CA | # 14 | 57 | 4.1 TWh |
Butte County, CA | # 15 | 25 | 3.8 TWh |
Monterey County, CA | # 16 | 29 | 3.7 TWh |
Orange County, CA | # 17 | 59 | 3.2 TWh |
Solano County, CA | # 18 | 40 | 3.0 TWh |
Tuolumne County, CA | # 19 | 23 | 3.0 TWh |
Colusa County, CA | # 20 | 3 | 2.9 TWh |
Stanislaus County, CA | # 21 | 25 | 2.6 TWh |
Alameda County, CA | # 22 | 46 | 2.4 TWh |
San Joaquin County, CA | # 23 | 45 | 2.3 TWh |
Placer County, CA | # 24 | 23 | 2.1 TWh |
Plumas County, CA | # 25 | 13 | 2.0 TWh |
Sutter County, CA | # 26 | 8 | 1.8 TWh |
Yuba County, CA | # 27 | 5 | 1.7 TWh |
El Dorado County, CA | # 28 | 15 | 1.5 TWh |
County | State Rank | Active Plants | Apr 2025 Generation |
---|---|---|---|
Inyo County, CA | # 29 | 23 | 1.2 TWh |
Tulare County, CA | # 30 | 68 | 1.0 TWh |
Madera County, CA | # 31 | 28 | 994.0 GWh |
Lake County, CA | # 32 | 10 | 921.2 GWh |
Ventura County, CA | # 33 | 32 | 828.4 GWh |
Mono County, CA | # 34 | 9 | 785.9 GWh |
Amador County, CA | # 35 | 8 | 666.5 GWh |
Calaveras County, CA | # 36 | 6 | 613.6 GWh |
Trinity County, CA | # 37 | 5 | 573.8 GWh |
Humboldt County, CA | # 38 | 10 | 480.9 GWh |
Merced County, CA | # 39 | 30 | 418.2 GWh |
Lassen County, CA | # 40 | 9 | 341.0 GWh |
San Benito County, CA | # 41 | 6 | 332.7 GWh |
Santa Barbara County, CA | # 42 | 18 | 327.1 GWh |
Mariposa County, CA | # 43 | 2 | 299.7 GWh |
Siskiyou County, CA | # 44 | 8 | 242.5 GWh |
Yolo County, CA | # 45 | 15 | 222.2 GWh |
Nevada County, CA | # 46 | 12 | 207.0 GWh |
San Mateo County, CA | # 47 | 10 | 133.4 GWh |
San Francisco County, CA | # 48 | 10 | 85.0 GWh |
Tehama County, CA | # 49 | 7 | 59.7 GWh |
Santa Cruz County, CA | # 50 | 6 | 56.2 GWh |
Napa County, CA | # 51 | 9 | 49.2 GWh |
Sierra County, CA | # 52 | 3 | 31.1 GWh |
Marin County, CA | # 53 | 3 | 19.0 GWh |
Glenn County, CA | # 54 | 2 | 18.7 GWh |
Mendocino County, CA | # 55 | 5 | 12.3 GWh |