Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Foundation California Training Facility | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 5.4 GWh | Jul 2018 | Dec 2024 | Wind |
| Foundation Mann Packing | Foundation CA Fund IX Manager, LLC | Gonzales, CA | California Independent System Operator (CISO) | 5.6 GWh | Mar 2019 | Dec 2024 | Wind |
| Golden Springs Building C-1 | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 1.3 GWh | Jan 2012 | Dec 2024 | Solar |
| Genentech Vacaville Meter #1 | Tesla Inc. | Vacaville, CA | California Independent System Operator (CISO) | 11.0 GWh | Apr 2017 | Dec 2024 | Solar |
| Solar Star California, XLIV, LLC | MN8 Energy LLC | Pearblossom, CA | California Independent System Operator (CISO) | 17.7 GWh | Nov 2016 | Dec 2024 | Solar |
| Verwey-Hanford Dairy Digester #1 | AlsoEnergy | Hanford, CA | California Independent System Operator (CISO) | 901.6 MWh | Sep 2016 | Dec 2024 | Other Biomass Gas |
| Jacumba Solar Farm | Invenergy Services LLC | Jacumba, CA | California Independent System Operator (CISO) | 48.3 GWh | Jun 2017 | Dec 2024 | Solar |
| Whitney Point Solar | Whitney Point Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 44.4 GWh | Feb 2017 | Dec 2024 | Solar |
| CSUF State College | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2016 | Dec 2024 | Solar |
| CSUF Nutwood Solar | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 3.1 GWh | Nov 2016 | Dec 2024 | Solar |
| NextEra Westside PV | Westside Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 40.6 GWh | Feb 2017 | Dec 2024 | Solar |
| Foundation SaIinas Valley State Prison | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.8 GWh | Jul 2018 | Dec 2024 | Wind |
| Ramona Solar Energy | San Diego Gas & Electric Co | Ramona, CA | California Independent System Operator (CISO) | 5.0 GWh | Mar 2017 | Dec 2024 | Solar |
| SCDA Solar 1 | SCDA Solar 1, LLC | Sacramento, CA | California Independent System Operator (CISO) | 13.4 GWh | Sep 2017 | Dec 2024 | Solar |
| Marin Clean Energy Solar One | AES Distributed Energy | Richmond, CA | California Independent System Operator (CISO) | 21.3 GWh | Nov 2017 | Dec 2024 | Solar |
| Foundation CDCR LAC | Foundation CA Fund VIII Manager, LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.7 GWh | Nov 2017 | Dec 2024 | Wind |
| Foundation Scheid Vineyards | Foundation CA Fund VIII Manager, LLC | Greenfield, CA | California Independent System Operator (CISO) | 3.9 GWh | Aug 2017 | Dec 2024 | Wind |
| Manteca Land PV | AES Distributed Energy | Manteca, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2017 | Dec 2024 | Solar |
| Delano Land 1 | AES Distributed Energy | Delano, CA | California Independent System Operator (CISO) | 963.0 MWh | Nov 2017 | Dec 2024 | Solar |
| UC Merced Solar Hybrid | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 6.5 GWh | Nov 2018 | Dec 2024 | Solar |
| Wistaria Ranch Solar | Consolidated Edison Development Inc. | Calexico, CA | California Independent System Operator (CISO) | 288.9 GWh | Nov 2018 | Sep 2025 | Solar |
| Stage Gulch Solar | Stage Gulch Solar, LLC | Petaluma, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Dec 2024 | Solar |
| Lavio Solar | Lavio Solar, LLC | Petaluma, CA | California Independent System Operator (CISO) | 1.7 GWh | Mar 2018 | Dec 2024 | Solar |
| Soboba Community Solar Project | Soboba Band of Luiseno Indians | San Jacinto, CA | California Independent System Operator (CISO) | 3.4 GWh | Jul 2016 | Dec 2024 | Solar |
| SeaWorld Aquatica | Onyx Asset Services Group | Chula Vista, CA | California Independent System Operator (CISO) | 1.9 GWh | Apr 2018 | Dec 2024 | Solar |
| Tulare BioMAT Fuel Cell | Central CA Fuel Cell 2, LLC | Tulare, CA | California Independent System Operator (CISO) | 13.7 GWh | Nov 2019 | Jul 2024 | Natural Gas : 63.4% Other Biomass Gas : 36.6% |
| National Raisin | National Raisin | Fowler, CA | California Independent System Operator (CISO) | 4.8 GWh | May 2015 | Dec 2024 | Solar |
| Pacific Ethanol Madera Solar Array | Seaboard Energy California, LLC | Madera, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2018 | Dec 2024 | Solar |
| Kilroy Solar | Nautilus Solar Solutions | San Diego, CA | California Independent System Operator (CISO) | 6.2 GWh | Dec 2017 | Dec 2024 | Solar |
| San Pablo Raceway | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 231.0 GWh | Jul 2019 | Sep 2025 | Solar |
| Mustang Two | RE Mustang Two LLC | Lemoore, CA | California Independent System Operator (CISO) | 406.5 GWh | Oct 2020 | Sep 2025 | Solar |
| UC Riverside Lots 30 & 32 | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 7.0 GWh | Nov 2017 | Dec 2024 | Solar |
| Stanford Campus Solar | MN8 Energy LLC | Stanford, CA | California Independent System Operator (CISO) | 5.9 GWh | Feb 2017 | Dec 2024 | Solar |
| CSU Long Beach Lots 7 & 14 | MN8 Energy LLC | Long Beach, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 2017 | Dec 2024 | Solar |
| Santa Rosa Junior College Petaluma Solar | Sonoma County Junior College District | Petaluma, CA | California Independent System Operator (CISO) | 1.8 GWh | Jun 2018 | Dec 2023 | Solar |
| Lancaster | Clean Focus Yield, LLC | Lancaster, CA | California Independent System Operator (CISO) | 8.1 GWh | Oct 2018 | Dec 2024 | Solar |
| Strauss Wind Farm | Strauss Wind LLC | Lompoc, CA | California Independent System Operator (CISO) | 230.0 GWh | Nov 2023 | Sep 2025 | Wind |
| ABEC #4 dba CE&S Dairy | ABEC #4 LLC | Bakersfield, CA | California Independent System Operator (CISO) | 7.9 GWh | Jan 2018 | Dec 2024 | Other Biomass Gas |
| Gaskell West 1 Solar Facility | Southern Power Co | Lancaster, CA | California Independent System Operator (CISO) | 52.6 GWh | Feb 2018 | Dec 2024 | Solar |
| RE Gaskell West 2 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 124.7 GWh | Apr 2023 | Sep 2025 | Solar |
| RE Gaskell West 3 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 49.3 GWh | Apr 2023 | Dec 2024 | Solar |
| RE Gaskell West 4 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 50.0 GWh | Apr 2023 | Dec 2024 | Solar |
| RE Gaskell West 5 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 49.3 GWh | Apr 2023 | Dec 2024 | Solar |
| Vandenberg Solar Project | MN8 Energy LLC | Vandenberg Airforce B, CA | California Independent System Operator (CISO) | 39.7 GWh | Nov 2017 | Dec 2024 | Solar |
| ABEC #2 dba West-Star Dairy | ABEC #2 LLC | Buttonwillow, CA | California Independent System Operator (CISO) | 8.5 GWh | Jan 2018 | Dec 2024 | Other Biomass Gas |
| ABEC #3 dba Lakeview Dairy | ABEC #3 LLC | Bakersfield, CA | California Independent System Operator (CISO) | 6.0 GWh | Jan 2018 | Dec 2024 | Other Biomass Gas |
| Cloverdale Solar Center | Adapture Renewables, Inc. | Cloverdale, CA | California Independent System Operator (CISO) | 2.1 GWh | Apr 2019 | Dec 2024 | Solar |
| Voyager Wind II | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 505.9 GWh | Nov 2018 | Sep 2025 | Wind |
| Voyager Wind III | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 141.2 GWh | Nov 2018 | Sep 2025 | Wind |
| Voyager Wind IV | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 80.9 GWh | Nov 2018 | Dec 2024 | Wind |
| Stenner Creek Solar | Stenner Creek Solar LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 9.5 GWh | Apr 2018 | Dec 2024 | Solar |
| CDCR (CA) - Solano State Prison | SunE Solano SP Owner, LLC | Vacaville, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2013 | Dec 2024 | Solar |
| CDCR (CA) - Corcoran State Prison | SunE Corcoran SP Owner, LLC | Corcoran, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 2013 | Dec 2024 | Solar |
| CDCR (CA) - Wasco State Prison | SunE Wasco SP Owner, LLC | Wasco, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2013 | Dec 2024 | Solar |
| Ameresco Johnson Canyon | Ameresco Johnson Canyon LLC | Gonzales, CA | California Independent System Operator (CISO) | 8.7 GWh | Apr 2013 | Dec 2024 | Landfill Gas |
| Gridley Main Two | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 3.4 GWh | Mar 2013 | Dec 2024 | Solar |
| White River Solar | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 44.3 GWh | Jun 2013 | Dec 2024 | Solar |
| Corcoran Solar | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 34.6 GWh | Jul 2013 | Dec 2024 | Solar |
| Oakley Solar Project | Oakley Solar Project LLC | Oakley, CA | California Independent System Operator (CISO) | 1.9 GWh | May 2013 | Dec 2024 | Solar |
| Cold Canyon 1 | Toro Energy of California SLO | San Luis Obispo, CA | California Independent System Operator (CISO) | 3.8 GWh | Jun 2013 | Dec 2024 | Landfill Gas |
| Solar Star 1 | Solar Star California XIX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 897.7 GWh | Feb 2014 | Sep 2025 | Solar |
| Solar Star 2 | Solar Star California XX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 714.2 GWh | Feb 2014 | Sep 2025 | Solar |
| Alta Wind X | Alta Wind X, LLC | Mojave, CA | California Independent System Operator (CISO) | 379.0 GWh | Dec 2013 | Dec 2024 | Wind |
| Alta Wind XI | Alta Wind XI, LLC | Mojave, CA | California Independent System Operator (CISO) | 269.5 GWh | Dec 2013 | Dec 2024 | Wind |
| Gridley Main | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2013 | Dec 2024 | Solar |
| Lone Valley Solar Park I LLC | Lone Valley Solar Park I LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 23.6 GWh | Nov 2014 | Dec 2024 | Solar |
| Victor Dry Farm Ranch A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.7 GWh | May 2015 | Dec 2024 | Solar |
| Victor Dry Farm Ranch B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.5 GWh | May 2015 | Dec 2024 | Solar |
| Sunshine Gas Producers | Sunshine Gas Producers LLC | Sylmar, CA | California Independent System Operator (CISO) | 121.2 GWh | Jul 2014 | Sep 2025 | Landfill Gas |
| Centinela Solar Energy | Arevon Energy, Inc. | Calexico, CA | California Independent System Operator (CISO) | 352.7 GWh | Jun 2013 | Dec 2024 | Solar |
| Glass House Camarillo Cultivation | Glass House Camarillo Cultivation | Camarillo, CA | California Independent System Operator (CISO) | 77.9 GWh | Jul 2012 | Dec 2024 | Natural Gas |
| Ameresco Vasco Road | Ameresco Vasco Road, LLC | Livermore, CA | California Independent System Operator (CISO) | 32.3 GWh | Feb 2013 | Dec 2024 | Landfill Gas |
| Ameresco San Joaquin | Ameresco San Joaquin, LLC | Linden, CA | California Independent System Operator (CISO) | 30.7 GWh | Mar 2014 | Dec 2024 | Landfill Gas |
| Kingsburg Solar | Altus Power America Management, LLC | Kingsburg, CA | California Independent System Operator (CISO) | 6.0 GWh | Nov 2013 | Dec 2024 | Solar |
| Roll Delano 2 | Bloom Energy | Delano, CA | California Independent System Operator (CISO) | 7.4 GWh | Aug 2012 | Dec 2023 | Natural Gas |
| Roll Delano | Bloom Energy | Delano, CA | California Independent System Operator (CISO) | 8.9 GWh | Aug 2012 | Dec 2023 | Natural Gas |
| Roll Lost Hills | Bloom Energy | Lost Hills, CA | California Independent System Operator (CISO) | 5.5 GWh | Nov 2012 | Dec 2023 | Natural Gas |
| Xilinx San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.3 GWh | Jan 2012 | Dec 2024 | Natural Gas |
| Honda Torrance | Bloom Energy | Torrance, CA | California Independent System Operator (CISO) | 762.0 MWh | Nov 2012 | Dec 2023 | Natural Gas |
| Juniper Networks Sunnyvale | Bloom Energy | Sunnyvale, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2012 | Dec 2024 | Natural Gas |
| Life Technologies Carlsbad | Bloom Energy | Carlsbad, CA | California Independent System Operator (CISO) | 8.6 GWh | Jul 2012 | Dec 2024 | Natural Gas |
| Taylor Farms Salinas | Bloom Energy | Salinas, CA | California Independent System Operator (CISO) | 7.6 GWh | Aug 2012 | Dec 2023 | Natural Gas |
| Ameresco Forward | Ameresco Forward, LLC | Manteca, CA | California Independent System Operator (CISO) | 31.8 GWh | Jan 2014 | Dec 2024 | Landfill Gas |
| Exeter Solar | Altus Power America Management, LLC | Exeter, CA | California Independent System Operator (CISO) | 4.6 GWh | Jan 2014 | Dec 2024 | Solar |
| Ivanhoe Solar | Altus Power America Management, LLC | Visalia, CA | California Independent System Operator (CISO) | 5.6 GWh | Dec 2013 | Dec 2024 | Solar |
| Lindsay Solar | Altus Power America Management, LLC | Lindsay, CA | California Independent System Operator (CISO) | 6.2 GWh | Dec 2013 | Dec 2024 | Solar |
| Porterville Solar | Altus Power America Management, LLC | Porterville, CA | California Independent System Operator (CISO) | 5.7 GWh | Dec 2013 | Dec 2024 | Solar |
| G2 Energy Hay Rd | G2 Energy LLC | Vacaville, CA | California Independent System Operator (CISO) | 12.2 GWh | May 2013 | Dec 2024 | Landfill Gas |
| Radiance Solar 4 | Greenbacker Renewable Energy Corporation | Lancaster, CA | California Independent System Operator (CISO) | 3.3 GWh | Jun 2013 | Dec 2024 | Solar |
| Radiance Solar 5 | Greenbacker Renewable Energy Corporation | Lancaster, CA | California Independent System Operator (CISO) | 2.8 GWh | Jun 2013 | Dec 2024 | Solar |
| Atwell Island | SPS Atwell Island LLC | Alpaugh, CA | California Independent System Operator (CISO) | 33.3 GWh | Feb 2013 | Dec 2024 | Solar |
| Oltmans SCE at Jurupa | California PV Energy LLC | Ontario, CA | California Independent System Operator (CISO) | 2.4 GWh | Nov 2013 | Dec 2024 | Solar |
| Kettleman Solar Project | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 2.6 GWh | Mar 2014 | Dec 2024 | Solar |
| Ironwood Solar LLC | Altus Power America Management, LLC | Blythe, CA | California Independent System Operator (CISO) | 7.5 GWh | Mar 2012 | Dec 2024 | Solar |
| Desert Hot Springs Solar | Consolidated Edison Solutions Inc. | Desert Hot Springs, CA | California Independent System Operator (CISO) | 4.8 GWh | Nov 2013 | Nov 2024 | Solar |
| Madera Community Hospital | CleanCapital Holdings | Madera, CA | California Independent System Operator (CISO) | 72.0 MWh | Sep 2011 | Dec 2024 | Solar |
| City of Hayward WWTP | City of Hayward | Hayward, CA | California Independent System Operator (CISO) | 11.3 GWh | Oct 2010 | Dec 2024 | Other Biomass Gas : 60.4% Solar : 27.7% Natural Gas : 12.0% |
| Garnet Solar Generation Station I LLC | Garnet Solar Generation Station I LLC | Palm Springs, CA | California Independent System Operator (CISO) | 9.0 GWh | Nov 2014 | Dec 2024 | Solar |
| Desert Sunlight 250, LLC | NextEra Energy Desert Sunlight 250, LLC | Desert Center, CA | California Independent System Operator (CISO) | 555.7 GWh | Oct 2013 | Dec 2024 | Solar |
| Sonora 1 | Greenbacker Renewable Energy Corporation | Jamestown, CA | California Independent System Operator (CISO) | 621.0 MWh | Nov 2013 | Dec 2024 | Solar |
Browse Power Plants By California Counties
Figures are based on September 2025 generation numbers.| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Kern County, CA | # 1 | 313 | 34.9 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| Los Angeles County, CA | # 3 | 308 | 18.9 TWh |
| Riverside County, CA | # 4 | 159 | 14.7 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.2 TWh |
| San Bernardino County, CA | # 6 | 204 | 12.8 TWh |
| Imperial County, CA | # 7 | 84 | 9.7 TWh |
| Shasta County, CA | # 8 | 46 | 7.7 TWh |
| Fresno County, CA | # 9 | 119 | 7.6 TWh |
| Sacramento County, CA | # 10 | 65 | 6.4 TWh |
| Sonoma County, CA | # 11 | 26 | 5.2 TWh |
| San Diego County, CA | # 12 | 151 | 5.1 TWh |
| Kings County, CA | # 13 | 57 | 4.3 TWh |
| Santa Clara County, CA | # 14 | 75 | 4.1 TWh |
| Butte County, CA | # 15 | 25 | 3.4 TWh |
| Solano County, CA | # 16 | 40 | 3.2 TWh |
| Monterey County, CA | # 17 | 29 | 3.2 TWh |
| Colusa County, CA | # 18 | 3 | 2.9 TWh |
| Orange County, CA | # 19 | 59 | 2.9 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.8 TWh |
| Tuolumne County, CA | # 21 | 23 | 2.7 TWh |
| Alameda County, CA | # 22 | 47 | 2.5 TWh |
| San Joaquin County, CA | # 23 | 47 | 2.2 TWh |
| Placer County, CA | # 24 | 24 | 2.0 TWh |
| Plumas County, CA | # 25 | 13 | 1.9 TWh |
| Sutter County, CA | # 26 | 8 | 1.8 TWh |
| Yuba County, CA | # 27 | 5 | 1.6 TWh |
| Tulare County, CA | # 28 | 69 | 1.5 TWh |
| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| El Dorado County, CA | # 29 | 15 | 1.4 TWh |
| Inyo County, CA | # 30 | 23 | 1.1 TWh |
| Madera County, CA | # 31 | 28 | 950.7 GWh |
| Lake County, CA | # 32 | 10 | 905.4 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Ventura County, CA | # 34 | 32 | 756.5 GWh |
| Amador County, CA | # 35 | 8 | 649.7 GWh |
| Trinity County, CA | # 36 | 5 | 569.3 GWh |
| Merced County, CA | # 37 | 31 | 522.8 GWh |
| Calaveras County, CA | # 38 | 6 | 513.9 GWh |
| Humboldt County, CA | # 39 | 10 | 467.8 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Santa Barbara County, CA | # 41 | 18 | 331.1 GWh |
| San Benito County, CA | # 42 | 6 | 302.7 GWh |
| Mariposa County, CA | # 43 | 2 | 299.7 GWh |
| Siskiyou County, CA | # 44 | 8 | 236.7 GWh |
| Nevada County, CA | # 45 | 12 | 219.1 GWh |
| Yolo County, CA | # 46 | 15 | 216.2 GWh |
| San Mateo County, CA | # 47 | 11 | 133.1 GWh |
| San Francisco County, CA | # 48 | 10 | 84.0 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| Tehama County, CA | # 50 | 7 | 59.7 GWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Sierra County, CA | # 52 | 3 | 33.2 GWh |
| Marin County, CA | # 53 | 3 | 19.0 GWh |
| Glenn County, CA | # 54 | 2 | 18.7 GWh |
| Mendocino County, CA | # 55 | 5 | 12.3 GWh |