Solar Gen 2 Solar Facility
110 West Main Street, Calipatria, CA 92243Plant Summary Information
Solar Gen 2 Solar Facility is ranked #50 out of 849 solar farms in California in terms of total annual net electricity generation.
Solar Gen 2 Solar Facility generated 62.2 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Solar Gen 2 Solar Facility |
|---|---|
| Utility Name | Southern Power Co |
| Location | Imperial County, CA |
| Initial Operation Date | November 2014 |
| Last Update | Dec 2024 |
| Annual Generation | 364.2 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,707 out of 12,539 Power Plants Nationwide | |
| Ranked #192 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #135 out of 1,600 California Power Plants | |
| Ranked #50 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
First Solar Energy LLC (2013 to 2013) Southern Power Co (2014 to 2024) |
Map of Solar Gen 2 Solar Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Solar Gen 2 Solar Facility.
Monthly Net Generation for Solar Gen 2 Solar Facility
Solar Gen 2 Solar Facility Details
| Summary Information | |
|---|---|
| Plant Name | Solar Gen 2 Solar Facility (58592) |
| Plant Address | 110 West Main Street, Calipatria, CA 92243 |
| Utility | Southern Power Co (17650) |
| Latitude, Longitude | 33.08, -115.47 |
| Generation Dates on File | Nov 2014 to Dec 2024 |
| Initial Operation Date | November 2014 |
| Annual Generation | 364.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG14-21-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Imperial Irrigation District (9216) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator ALHM Details Operating November 2014
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 54.4 MW |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2014 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| Azimuth Angle | 90 |
| DC Net Capacity | 64.7 MW |
| Crystalline Silicon | Yes |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator ARK Details Operating November 2014
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 54.4 MW |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2014 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| Azimuth Angle | 90 |
| DC Net Capacity | 64.7 MW |
| Crystalline Silicon | Yes |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator SONR Details Operating November 2014
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 54.4 MW |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2014 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| Azimuth Angle | 90 |
| DC Net Capacity | 64.7 MW |
| Crystalline Silicon | Yes |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Solar Gen 2 Solar Facility Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| SG2 Imperial Valley, LLC | 30 Ivan Allen Jr. Blvd, NW, Atlanta, GA 30308 | Generator ALHM | 100.00% |
| SG2 Imperial Valley, LLC | 30 Ivan Allen Jr. Blvd, NW, Atlanta, GA 30308 | Generator ARK | 100.00% |
| SG2 Imperial Valley, LLC | 30 Ivan Allen Jr. Blvd, NW, Atlanta, GA 30308 | Generator SONR | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #182 | Hillcrest Solar | Mt. Orab, OH | 374.6 GWh |
| #183 | Dry Lake Solar Energy Center | Moapa, NV | 356.8 GWh |
| #184 | Imperial Solar Energy Center West | Seeley, CA | 373.6 GWh |
| #185 | Shakes Solar | Carrizo Springs, TX | 373.3 GWh |
| #186 | Edwards Sanborn E1B | Mojave, CA | 355.4 GWh |
| #187 | Maverick Solar, LLC | Desert Center, CA | 371.6 GWh |
| #188 | Greasewood Solar | Fort Stockton, TX | 371.1 GWh |
| #189 | Blythe Solar III, LLC Hybrid | Blythe, CA | 353.7 GWh |
| #190 | Samson Solar Energy | Cunningham, TX | 367.7 GWh |
| #191 | Lund Hill Solar | Bickleton, WA | 367.4 GWh |
| #193 | BigBeau Solar, LLC | Rosamond, CA | 359.6 GWh |
| #194 | Hardy Hills Solar Energy LLC | Frankfort, IN | 362.2 GWh |
| #195 | Camilla Solar Energy Project | Camilla, GA | 359.2 GWh |
| #196 | Scarlet II Hybrid | Cantua Creek, CA | 342.2 GWh |
| #197 | Huck Finn Renewable Energy Center | Vandalia, MO | 357.9 GWh |
| #198 | Copper Mountain Solar 2 | Boulder City, NV | 356.1 GWh |
| #199 | Buckthorn Westex | Ft. Stockton, TX | 355.9 GWh |
| #200 | Aragorn Solar Project | Van Horn, TX | 353.9 GWh |
| #201 | Centinela Solar Energy | Calexico, CA | 352.7 GWh |
| #202 | Newport Solar Project | Newport, AR | 352.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Solar Gen 2 Solar Facility.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Calipatria Solar Farm | Calipatria, CA | 38.3 GWh | 6.9 mi |
| Calipatria State Prison | Calipatria, CA | 16.5 GWh | 5.8 mi |
| CE Leathers | Calipatria, CA | 70.6 GWh | 8.7 mi |
| Citizens Imperial Solar | Calipatria, CA | 40.3 GWh | 8 mi |
| Community Solar 1 | Brawley, CA | 13.9 GWh | 6.8 mi |
| Crown Cooling Facility | Brawley, CA | 982.0 MWh | 8.6 mi |
| Del Ranch Company | Calipatria, CA | 326.3 GWh | 10.3 mi |
| Elmore Company | Calipatria, CA | 104.3 GWh | 10.2 mi |
| John L. Featherstone Plant | Calipatria, CA | 434.6 GWh | 10.5 mi |
| Midway Solar Farm 1 | Calipatria, CA | 107.9 GWh | 8.9 mi |
| Midway Solar Farm II | Calipatria, CA | 34.2 GWh | 6.7 mi |
| Midway Solar Farm III | Calipatria, CA | 50.9 GWh | 6.7 mi |
| North Brawley Geothermal Plant | Brawley, CA | 16.9 GWh | 6.3 mi |
| Rockwood | Brawley, CA | 6.8 GWh | 9.4 mi |
| Salton Sea Power Gen Co - Unit 3 | Calipatria, CA | 314.9 GWh | 11.2 mi |
| Salton Sea Power Gen Co - Unit 4 | Calipatria, CA | 179.8 GWh | 11.1 mi |
| Salton Sea Power LLC - Unit 5 | Calipatria, CA | 290.3 GWh | 11 mi |
| Valencia 1 Solar CA | Westmorland, CA | 6.7 GWh | 9.5 mi |
| Valencia 2 | Imperial, CA | 3.9 GWh | 5.2 mi |
| Vulcan-BN Geothermal Power Company | Calipatria, CA | 227.2 GWh | 10.3 mi |