Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Santa Fe Springs Rooftop Solar BLDG M | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.6 GWh | Feb 2015 | Dec 2025 | Solar |
| Ramona 2 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 9.0 GWh | Nov 2013 | Dec 2025 | Solar |
| Ramona 1 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 3.0 GWh | Nov 2013 | Dec 2025 | Solar |
| Cottonwood Solar, LLC (Goose Lake) | Onward Energy | Lost Hills, CA | California Independent System Operator (CISO) | 29.9 GWh | Apr 2015 | Dec 2025 | Solar |
| Hesperia | SunEdison LLC | Hesperia, CA | California Independent System Operator (CISO) | 3.0 GWh | Jul 2014 | Dec 2025 | Solar |
| CID Solar, LLC | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 40.7 GWh | Nov 2014 | Dec 2025 | Solar |
| Industry Solar Power Generation Station | AES Distributed Energy | Adelanto, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2013 | Dec 2025 | Solar |
| MCAGCC Cogen Plant | DOD USMC Marine Air Ground Combat | Twentynine Palms, CA | California Independent System Operator (CISO) | 68.5 GWh | Jan 2003 | Dec 2025 | Natural Gas |
| Westlands Solar PV Farm | Boralex US Operations LLC | Huron, CA | California Independent System Operator (CISO) | 39.1 GWh | Jan 2014 | Dec 2025 | Solar |
| Valley Center 2 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 8.5 GWh | Nov 2013 | Dec 2025 | Solar |
| Otoe Solar Power Generation Station 1 LL | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2013 | Dec 2025 | Solar |
| Valley Center 1 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2013 | Dec 2025 | Solar |
| Powhatan Solar Power Generation Station | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2013 | Dec 2025 | Solar |
| SC 1 Data Center, Phase 2 | Xeres Ventures LLC | Santa Clara, CA | California Independent System Operator (CISO) | 129.0 MWh | Aug 2011 | Aug 2026 | Distillate Fuel Oil |
| Mira Loma | Costco Wholesale | Mira Loma, CA | California Independent System Operator (CISO) | 2.2 GWh | Oct 2011 | Dec 2025 | Solar |
| 2081 Terzian Solar Project | Solarenewal LLC | Reedley, CA | California Independent System Operator (CISO) | 1.2 GWh | Jan 2014 | Dec 2025 | Solar |
| 2127 Harris Solar Project | Solarenewal LLC | Live Oak, CA | California Independent System Operator (CISO) | 885.0 MWh | Mar 2014 | Dec 2025 | Solar |
| 2097 Helton Solar Project | Solarenewal LLC | Merced, CA | California Independent System Operator (CISO) | 1.1 GWh | Mar 2014 | Dec 2025 | Solar |
| Cottonwood Solar, LLC (City of Corcoran) | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 20.6 GWh | Apr 2015 | Dec 2025 | Solar |
| Lancaster Solar 2 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2014 | Dec 2025 | Solar |
| Lancaster Solar 1 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2014 | Dec 2025 | Solar |
| Sonora 1 | CleanCapital Holdings | Jamestown, CA | California Independent System Operator (CISO) | 858.0 MWh | Nov 2013 | Dec 2025 | Solar |
| One Market Plaza | Paramount Group Inc | San Francisco, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2003 | Dec 2025 | Natural Gas |
| Division 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 2.5 GWh | May 2014 | Dec 2025 | Solar |
| Cloverdale Solar I | Altus Power America Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 1.5 GWh | May 2014 | Dec 2025 | Solar |
| Division 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.9 GWh | May 2014 | Dec 2025 | Solar |
| Division 3 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.1 GWh | May 2014 | Dec 2025 | Solar |
| Kettering Solar 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.6 GWh | May 2014 | Nov 2025 | Solar |
| Kettering Solar 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.5 GWh | May 2014 | Nov 2025 | Solar |
| Oltmans SCE at Champagne | California PV Energy LLC | Ontario, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2013 | Dec 2025 | Solar |
| Hellyer Solar Farm | County of Santa Clara - (CA) | San Jose, CA | California Independent System Operator (CISO) | 241.0 MWh | Jul 2017 | Dec 2025 | Solar |
| DGS Central California Womens Facility | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 3.1 GWh | Nov 2020 | Dec 2025 | Solar |
| Guadalupe Solar Farm | County of Santa Clara - (CA) | San Jose, CA | California Independent System Operator (CISO) | 1.4 GWh | Aug 2018 | Dec 2025 | Solar |
| Mission College Blvd. Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 36.3 GWh | Nov 2017 | Dec 2025 | Natural Gas |
| Kaiser East La Palma Ave. Fuel Cell | 2016 ESA Project Company, LLC | Anaheim, CA | California Independent System Operator (CISO) | 17.8 GWh | Aug 2017 | Dec 2025 | Natural Gas |
| Kaiser Deer Valley Rd. Fuel Cell | 2016 ESA Project Company, LLC | Antioch, CA | California Independent System Operator (CISO) | 10.9 GWh | Mar 2017 | Dec 2025 | Natural Gas |
| Fresno Sunnyside High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2020 | Dec 2025 | Solar |
| Fresno Hoover High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.0 GWh | Feb 2020 | Dec 2025 | Solar |
| Fresno Bullard High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.1 GWh | Feb 2020 | Dec 2025 | Solar |
| CalCity Solar 1 | CalCity Solar 1, LLC | California City, CA | California Independent System Operator (CISO) | 8.0 GWh | Oct 2019 | Dec 2025 | Solar |
| Malech Solar Farm | County of Santa Clara - (CA) | San Jose, CA | California Independent System Operator (CISO) | 4.6 GWh | Sep 2017 | Dec 2025 | Solar |
| American Canyon Solar | RP Napa Solar 1, LLC | American Canyon, CA | California Independent System Operator (CISO) | 6.0 GWh | Aug 2019 | Dec 2025 | Solar |
| Alticor Inc - Solar Project | MN8 Energy LLC | Buena Park, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2017 | Dec 2025 | Solar |
| Antelope Expansion 3B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 12.6 GWh | May 2021 | Dec 2025 | Solar |
| Antelope Expansion 3A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 40.2 GWh | May 2021 | Dec 2025 | Solar |
| Equinix Caspian Dr. Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 38.7 GWh | Nov 2017 | Dec 2025 | Natural Gas |
| Bio-Rad | Vista Solar, Inc. | Hercules, CA | California Independent System Operator (CISO) | 3.2 GWh | Sep 2021 | Dec 2025 | Solar |
| Central CA Fuel Cell 1, LLC | Cordia | Tulare, CA | California Independent System Operator (CISO) | 13.2 GWh | Apr 2018 | Dec 2025 | Natural Gas |
| Sun Streams 2 | Sun Streams 2, LLC | Hassayampa, AZ | California Independent System Operator (CISO) | 305.4 GWh | May 2021 | Aug 2026 | Solar |
| Corcoran Irrigation District | Madison Energy Investments LLC | Corcoran, CA | California Independent System Operator (CISO) | 4.0 GWh | Aug 2019 | Sep 2025 | Solar |
| Kaiser Owens Dr. Fuel Cell | 2016 ESA Project Company, LLC | Pleasanton, CA | California Independent System Operator (CISO) | 7.9 GWh | Aug 2017 | Dec 2025 | Natural Gas |
| SCCCD - Clovis Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2018 | Nov 2025 | Solar |
| SCV Water - Gladbach Water Treatment Plant Phases I and II | SCV Water | Santa Clara, CA | California Independent System Operator (CISO) | 858.0 MWh | Nov 2014 | Oct 2025 | Solar |
| SCCCD - Fresno Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 3.8 GWh | Sep 2018 | Nov 2025 | Solar |
| Niagara Bottling Stockton | ClearGen LLC | Stockton, CA | California Independent System Operator (CISO) | 1.7 GWh | Dec 2017 | Dec 2025 | Solar |
| Medline Ind. Phase 2 Tracy | Powerflex | Tracy, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Aug 2025 | Solar |
| Reedley Community College Solar | Forefront Power, LLC | Reedley, CA | California Independent System Operator (CISO) | 4.0 GWh | Nov 2018 | Nov 2025 | Solar |
| Grossmont HS Solar Project | MN8 Energy LLC | El Cajon, CA | California Independent System Operator (CISO) | 1.9 GWh | Nov 2018 | Dec 2025 | Solar |
| Windsor Floating Solar | CA ODEVI LLC | Windsor, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2020 | Dec 2025 | Solar |
| Eagle Creek | ZGlobal Inc | Taft, CA | California Independent System Operator (CISO) | 7.6 GWh | Nov 2019 | Dec 2025 | Solar |
| Santa Barbara ReSource Center | County of Santa Barbara - (CA) | Goleta, CA | California Independent System Operator (CISO) | 8.7 GWh | May 2021 | Dec 2025 | Other Biomass Gas |
| Drew Solar LLC | Drew Solar LLC | Calexico, CA | California Independent System Operator (CISO) | 304.4 GWh | Oct 2022 | Aug 2026 | Solar |
| Athos Solar Project | SE Athos I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 670.5 GWh | May 2022 | Aug 2026 | Solar |
| DGS Wasco State Prison | Forefront Power, LLC | Wasco, CA | California Independent System Operator (CISO) | 4.8 GWh | Jun 2020 | Dec 2025 | Solar |
| Sierra Pacific Industries (2042-RD) | Sierra Pacific Industries | Red Bluff, CA | California Independent System Operator (CISO) | 16.7 GWh | Apr 2020 | Dec 2025 | Solar |
| Kaiser Napa Valley Corporate Dr Fuel Cel | 2016 ESA Project Company, LLC | Napa, CA | California Independent System Operator (CISO) | 39.0 GWh | May 2017 | Dec 2025 | Natural Gas |
| IOS II-LAX9 | Madison Energy Holdings LLC | Fontana, CA | California Independent System Operator (CISO) | 3.5 GWh | Jan 2020 | Dec 2025 | Solar |
| Equinix Great Oaks Blvd. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 26.8 GWh | Nov 2017 | Dec 2025 | Natural Gas |
| Shelter Creek Condominiums Solar | Vista Solar, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 3.4 GWh | Jan 2020 | Dec 2025 | Solar |
| Equinix Lundy Ave. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 30.7 GWh | Aug 2017 | Dec 2025 | Natural Gas |
| Equinix Douglas St. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 15.5 GWh | Aug 2017 | Dec 2025 | Natural Gas |
| Equinix Maple Ave. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 8.0 GWh | Aug 2017 | Dec 2025 | Natural Gas |
| Solar Star Palo Alto I, LLC | DG 1 Acquisition Co., LLC | Palo Alto, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2019 | Dec 2025 | Solar |
| AGT000 Stevens Creek Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 17.4 GWh | Aug 2018 | Dec 2025 | Natural Gas |
| Illumina Way SD | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 27.5 GWh | Aug 2019 | Dec 2025 | Natural Gas |
| KSR028 Merced Fuel Cell | 2016 ESA Project Company, LLC | San Leandro, CA | California Independent System Operator (CISO) | 16.4 GWh | Mar 2018 | Dec 2025 | Natural Gas |
| JSR000 N Mathilda Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 8.8 GWh | May 2019 | Dec 2025 | Natural Gas |
| ESCA-LL-COLTON, LLC | Madison Energy Holdings LLC | Colton, CA | California Independent System Operator (CISO) | 4.0 GWh | Aug 2021 | Dec 2025 | Solar |
| ATT North Watney | Bloom Energy | Fairfield, CA | California Independent System Operator (CISO) | 8.4 GWh | Nov 2019 | Dec 2025 | Natural Gas |
| RE-VFO LLC | RE-VFO LLC | Visalia, CA | California Independent System Operator (CISO) | 1.8 GWh | Apr 2009 | Dec 2025 | Solar |
| Bellefield Solar and Energy Storage Farm | 50LW 8me LLC | Mojave, CA | California Independent System Operator (CISO) | 840.2 GWh | Nov 2025 | Aug 2026 | Solar |
| Wonderful Orchards - Westside | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 13.2 GWh | Jul 2021 | Dec 2025 | Solar |
| OES Biogas Power | Organic Energy Solutions, Inc. | San Bernardino, CA | California Independent System Operator (CISO) | 904.0 MWh | - | Dec 2025 | Other Biomass Gas |
| CST001 McCarthy Fuel Cell | 2016 ESA Project Company, LLC | Milpitas, CA | California Independent System Operator (CISO) | 9.0 GWh | Dec 2018 | Dec 2025 | Natural Gas |
| EQX010 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 19.4 GWh | Aug 2019 | Dec 2025 | Natural Gas |
| EQX011 Duane Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 31.2 GWh | Aug 2018 | Dec 2025 | Natural Gas |
| PSREC/SIAD Solar | Plumas Sierra Rural Electric Coop | Herlong, CA | California Independent System Operator (CISO) | 5.6 GWh | Aug 2018 | Dec 2025 | Solar |
| EQX015 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 31.1 GWh | Dec 2017 | Dec 2025 | Natural Gas |
| Wonderful Orchards - Belridge | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 12.4 GWh | Nov 2020 | Dec 2025 | Solar |
| Walnut Unified School District Walnut HS | Tesla Inc. | Walnut, CA | California Independent System Operator (CISO) | 327.0 MWh | Jan 2020 | Jun 2025 | Solar |
| Central 40 | Central 40, LLC | Newman, CA | California Independent System Operator (CISO) | 71.7 GWh | Jan 2021 | Aug 2026 | Solar |
| Maverick Solar 6, LLC | Maverick Solar 6, LLC | Desert Center, CA | California Independent System Operator (CISO) | 227.9 GWh | Oct 2021 | Aug 2026 | Solar |
| Maverick Solar 4, LLC | Maverick Solar 4, LLC | Desert Center, CA | California Independent System Operator (CISO) | 292.4 GWh | Nov 2020 | Aug 2026 | Solar |
| Desert Harvest II LLC | Desert Harvest II LLC | Desert Center, CA | California Independent System Operator (CISO) | 192.7 GWh | Nov 2020 | Aug 2026 | Solar |
| Soscol Ferry Solar | Soscol Ferry Solar | Napa, CA | California Independent System Operator (CISO) | 4.5 GWh | Nov 2020 | Dec 2025 | Solar |
| Silveira Ranch Road Solar | Silveira Ranch Road Solar | Novato, CA | California Independent System Operator (CISO) | 5.2 GWh | Feb 2021 | Dec 2025 | Solar |
| SB Water Reclamation Fuel Cell | San Bernardino Fuel Cell, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 8.1 GWh | May 2021 | Dec 2025 | Other Biomass Gas : 79.3% Natural Gas : 20.7% |
| Camino Solar Hybrid | Avangrid Power LLC | Rosamond, CA | California Independent System Operator (CISO) | 134.2 GWh | Mar 2025 | Aug 2026 | Solar |
| Titan Solar 1 (CA) | Titan Solar 1, LLC | Borrego Springs, CA | California Independent System Operator (CISO) | 164.1 GWh | Nov 2020 | Aug 2026 | Solar |
| Solar Blue | Westlands Solar Blue | Lemoore, CA | California Independent System Operator (CISO) | 645.2 GWh | Nov 2023 | Aug 2026 | Solar |
Summary of Power Plants By State
Figures are based on August 2026 generation numbers.| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 80 | 13,897.78 GWh |
| Alaska | # 48 | 146 | 672.99 GWh |
| Arizona | # 10 | 203 | 13,589.64 GWh |
| Arkansas | # 23 | 122 | 7,027.75 GWh |
| California | # 3 | 1,840 | 24,164.86 GWh |
| Colorado | # 30 | 321 | 5,322.30 GWh |
| Connecticut | # 34 | 180 | 4,400.98 GWh |
| Delaware | # 49 | 35 | 555.40 GWh |
| District of Columbia | # 51 | 19 | 21.71 GWh |
| Florida | # 2 | 345 | 28,185.93 GWh |
| Georgia | # 6 | 261 | 15,282.60 GWh |
| Hawaii | # 47 | 73 | 863.62 GWh |
| Idaho | # 43 | 152 | 1,754.56 GWh |
| Illinois | # 5 | 556 | 18,683.36 GWh |
| Indiana | # 17 | 226 | 9,970.06 GWh |
| Iowa | # 27 | 301 | 5,759.64 GWh |
| Kansas | # 26 | 191 | 6,368.18 GWh |
| Kentucky | # 21 | 63 | 7,221.26 GWh |
| Louisiana | # 14 | 93 | 10,670.45 GWh |
| Maine | # 45 | 250 | 1,285.31 GWh |
| Maryland | # 37 | 236 | 3,745.22 GWh |
| Massachusetts | # 41 | 679 | 1,958.59 GWh |
| Michigan | # 12 | 288 | 12,064.19 GWh |
| Minnesota | # 32 | 794 | 5,047.38 GWh |
| Mississippi | # 19 | 62 | 8,358.70 GWh |
| Missouri | # 22 | 134 | 7,125.71 GWh |
| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 2,266.60 GWh |
| Nebraska | # 39 | 132 | 3,448.00 GWh |
| Nevada | # 29 | 117 | 5,523.31 GWh |
| New Hampshire | # 42 | 60 | 1,901.10 GWh |
| New Jersey | # 25 | 409 | 6,440.88 GWh |
| New Mexico | # 33 | 166 | 4,571.47 GWh |
| New York | # 11 | 1,087 | 13,130.21 GWh |
| North Carolina | # 8 | 921 | 14,263.55 GWh |
| North Dakota | # 38 | 62 | 3,579.89 GWh |
| Ohio | # 7 | 216 | 14,448.49 GWh |
| Oklahoma | # 13 | 153 | 10,965.38 GWh |
| Oregon | # 31 | 292 | 5,257.14 GWh |
| Pennsylvania | # 4 | 270 | 23,772.83 GWh |
| Rhode Island | # 46 | 108 | 924.31 GWh |
| South Carolina | # 16 | 214 | 9,989.71 GWh |
| South Dakota | # 44 | 53 | 1,486.65 GWh |
| Tennessee | # 18 | 101 | 8,430.26 GWh |
| Texas | # 1 | 1,069 | 65,726.98 GWh |
| Utah | # 36 | 131 | 4,074.82 GWh |
| Vermont | # 50 | 118 | 175.56 GWh |
| Virginia | # 15 | 255 | 10,241.54 GWh |
| Washington | # 20 | 137 | 8,189.60 GWh |
| West Virginia | # 28 | 41 | 5,593.74 GWh |
| Wisconsin | # 24 | 272 | 6,683.19 GWh |
| Wyoming | # 35 | 71 | 4,322.19 GWh |