2097 Helton Solar Project
1219 West Tahoe Street, Merced, CA 95348Plant Summary Information
2097 Helton Solar Project is ranked #757 out of 885 solar farms in California in terms of total annual net electricity generation.
2097 Helton Solar Project generated 126.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | 2097 Helton Solar Project |
|---|---|
| Utility Name | Solarenewal LLC |
| Location | Merced County, CA |
| Initial Operation Date | April 2014 |
| Last Update | Dec 2024 |
| Annual Generation | 1.6 GWh |
| Annual Consumption | 5.9 k MMBtu |
| Ranked #11,455 out of 13,081 Power Plants Nationwide | |
| Ranked #6,257 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #1,444 out of 1,606 California Power Plants | |
| Ranked #757 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Pristine Sun LLC (2013 to 2016) Solarenewal LLC (2017 to 2025) |
Map of 2097 Helton Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for 2097 Helton Solar Project.
Monthly Net Generation for 2097 Helton Solar Project
Monthly Plant Fuel Consumption for 2097 Helton Solar Project
2097 Helton Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | 2097 Helton Solar Project (58920) |
| Plant Address | 1219 West Tahoe Street, Merced, CA 95348 |
| Utility | Solarenewal LLC (61315) |
| Latitude, Longitude | 37.35222, -120.50694 |
| Generation Dates on File | Apr 2014 to Dec 2024 |
| Initial Operation Date | April 2014 |
| Annual Generation | 1.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator 2097 Details Operating April 2014
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2014 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| DC Net Capacity | 2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
2097 Helton Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6247 | Sunnyside Ranch Community Solar Array | Carbondale, CO | 1.6 GWh |
| #6248 | NSF Edmeston Site 2 | South Edmeston, NY | 1.6 GWh |
| #6249 | Whitfield Cooper | Cohutta, GA | 1.6 GWh |
| #6250 | GSPP NESV, LLC | Attleboro, MA | 1.6 GWh |
| #6251 | ESIL-PFCHICAGO 2, LLC | Chicago, IL | 1.6 GWh |
| #6252 | Novel Historical Society Solar CSG | Sacred Heart, MN | 1.6 GWh |
| #6253 | (3K) 59 Hetcheltown Rd | Glenville, NY | 1.6 GWh |
| #6254 | NCS Paradise LLC | Washington, DC | 1.6 GWh |
| #6255 | Rockdale | Williamsport, MD | 1.6 GWh |
| #6256 | Dorchester Solar Site | Dorchester, MA | 1.6 GWh |
| #6258 | Carrier Clinic | Belle Mead, NJ | 1.6 GWh |
| #6259 | Farley Road Community Solar | Dudley, MA | 1.6 GWh |
| #6260 | Blair Wire Village Solar, LLC CSG | Spencer, MA | 1.6 GWh |
| #6261 | Golden Springs Building D | Santa Fe Springs, CA | 1.6 GWh |
| #6262 | Strandness Garden | Starbuck, MN | 1.6 GWh |
| #6263 | Dudley River 2 Solar, LLC CSG | Southbridge, MA | 1.6 GWh |
| #6264 | BWC Wading River One, Two, Three CSG | Mendon, MA | 1.6 GWh |
| #6265 | Gohman Community Solar (CSG) | Clear Lake, MN | 1.6 GWh |
| #6266 | Decatur Co. Solar RES (IN) | Greensburg, IN | 1.6 GWh |
| #6267 | Kapaa Photovoltaic Project | Kapaa, HI | 1.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding 2097 Helton Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Adera Solar | Chowchilla, CA | 32.7 GWh | 18.9 mi |
| Broadway 3 - UC Merced 1 | Merced, CA | 929.0 MWh | 4.3 mi |
| Chowchilla II | Chowchilla, CA | 16.5 GWh | 22.1 mi |
| City of Atwater NEM | Atwater, CA | 1.6 GWh | 8.6 mi |
| East Cleveland Road Solar | El Nido, CA | 5.9 GWh | 15.9 mi |
| Exchequer | Snelling, CA | 245.8 GWh | 20.7 mi |
| Henry Miller RD | Dos Palos, CA | 3.0 GWh | 21.8 mi |
| Hickman | Hickman, CA | 3.6 GWh | 22.8 mi |
| La Grange | La Grange, CA | 6.6 GWh | 22.2 mi |
| McSwain | Snelling, CA | 26.9 GWh | 15.9 mi |
| Merced Falls | Snelling, CA | 9.1 GWh | 15.3 mi |
| Merced Solar LLC | Merced, CA | 3.9 GWh | 6 mi |
| Mission Solar LLC | Merced, CA | 3.6 GWh | 6 mi |
| Parker | Snelling, CA | 6.0 GWh | 9.3 mi |
| Sun Harvest Solar NDP1 | Dos Palos, CA | 2.8 GWh | 21.9 mi |
| Turlock Lake | Hickman, CA | 3.2 GWh | 18.5 mi |
| UC Merced Solar Hybrid | Merced, CA | 8.0 GWh | 4.2 mi |
| Upper Dawson | La Grange, CA | 8.9 GWh | 20.7 mi |
| Walnut Energy Center | Turlock, CA | 1.5 TWh | 23.3 mi |
| West Tambo Clean Power II | Livingston, CA | 4.3 GWh | 11.7 mi |