Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| University of the Pacific | The Greater Light USA LLC | Stockton, CA | California Independent System Operator (CISO) | 6.5 GWh | Apr 2022 | Dec 2024 | Solar |
| Fremont - Kato Rd | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2016 | Dec 2024 | Solar |
| AT&T - Redwood City | Bloom Energy | Redwood City, CA | California Independent System Operator (CISO) | 5.6 GWh | Feb 2013 | Dec 2024 | Natural Gas |
| AT&T - Gardena | Bloom Energy | Gardena, CA | California Independent System Operator (CISO) | 7.8 GWh | May 2013 | Dec 2024 | Natural Gas |
| AT&T - Hawthorne | Bloom Energy | Hawthorne, CA | California Independent System Operator (CISO) | 6.5 GWh | Sep 2016 | Dec 2024 | Natural Gas |
| AT&T - Hayward | Bloom Energy | Hayward, CA | California Independent System Operator (CISO) | 8.2 GWh | Oct 2016 | Dec 2024 | Natural Gas |
| Niagara Bottling - Rialto | SkyHigh 2 Solar | Rialto, CA | California Independent System Operator (CISO) | 7.6 GWh | Nov 2021 | Dec 2024 | Solar |
| Graniterock Quarry | CalCom Energy | Aromas, CA | California Independent System Operator (CISO) | 8.9 GWh | Aug 2022 | Dec 2024 | Solar |
| Enloe Medical - Chico | Bloom Energy | Chico, CA | California Independent System Operator (CISO) | 13.3 GWh | May 2021 | Dec 2024 | Natural Gas |
| Google Moffett Park Solar Project | Google, Inc. | Sunnyvale, CA | California Independent System Operator (CISO) | 2.6 GWh | Feb 2021 | Dec 2024 | Solar |
| CA-DGS RFP-Pleasant Valley State Prison | Forefront Power, LLC | Coalinga, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2023 | Dec 2024 | Solar |
| CA-DGS RFP-Salinas Valley State Prison | Forefront Power, LLC | Soledad, CA | California Independent System Operator (CISO) | 6.8 GWh | Oct 2023 | Dec 2024 | Solar |
| CA-DGS- RFP-Correctional Training Fac | Forefront Power, LLC | Soledad, CA | California Independent System Operator (CISO) | 3.4 GWh | Feb 2024 | Dec 2024 | Solar |
| CA-DGS-California Men's Colony | Forefront Power, LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 4.6 GWh | Apr 2023 | Dec 2024 | Solar |
| West Village Solar - Array 2 Community S | CHF-Davis I, LLC | Davis, CA | California Independent System Operator (CISO) | 1.7 GWh | Apr 2022 | Dec 2023 | Solar |
| West Village Solar - Array 1Community So | CHF-Davis I, LLC | Davis, CA | California Independent System Operator (CISO) | 1.8 GWh | Apr 2022 | Dec 2023 | Solar |
| Amazon Bakersfield 1 Solar Project | Solar Star Prime 3, LLC | Bakersfiled, CA | California Independent System Operator (CISO) | 7.9 GWh | Dec 2023 | Dec 2024 | Solar |
| Broadway 4 - Target Shafter | MN8 Energy LLC | Shafter, CA | California Independent System Operator (CISO) | 3.0 GWh | Aug 2018 | Dec 2024 | Solar |
| Calibrant Bakersfield LLC | Bay4 Energy Services, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2022 | Dec 2024 | Solar |
| Sandrini Solar 200 | EDPR CA Solar Park LLC | Mettler, CA | California Independent System Operator (CISO) | 411.1 GWh | Nov 2024 | Feb 2026 | Solar |
| Gilead Sciences La Verne Rooftop Solar | Gilead Sciences, Inc. - La Verne | La Verne, CA | California Independent System Operator (CISO) | 2.5 GWh | Jun 2021 | Dec 2024 | Solar |
| Broadway 3 - UCSB Lot 38 | MN8 Energy LLC | Santa Barbara, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 2016 | Dec 2024 | Solar |
| Broadway 3 - UC Merced 1 | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 901.0 MWh | Sep 2009 | Dec 2024 | Solar |
| University of San Diego | Bloom Energy 2009 PPA | San Diego, CA | California Independent System Operator (CISO) | 8.2 GWh | Nov 2016 | Dec 2024 | Natural Gas |
| AT&T San Diego | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 3.5 GWh | Feb 2015 | Dec 2023 | Natural Gas |
| Abel Road Bioenergy | ACC Renewable Resources | Williams, CA | California Independent System Operator (CISO) | 22.3 GWh | Jun 2022 | Dec 2024 | Agricultural By-Products |
| CalTech - Pasadena (PPA) | Bloom Energy 2009 PPA | Pasadena, CA | California Independent System Operator (CISO) | 8.7 GWh | Feb 2016 | Dec 2024 | Natural Gas |
| CSP Los Angeles | Ecoplexus, Inc | Lancaster, CA | California Independent System Operator (CISO) | 5.6 GWh | Sep 2022 | Dec 2024 | Solar |
| Donaghy-Stockton | Donaghy Sales Inc. | Stockton, CA | California Independent System Operator (CISO) | 2.2 GWh | Sep 2021 | Dec 2024 | Solar |
| Canal Energy S23, LLC | Canal Energy S23, LLC | Hanford, CA | California Independent System Operator (CISO) | 7.9 GWh | Nov 2021 | Dec 2024 | Solar |
| Chambers 4 - Rialto LGB8 | MN8 Energy LLC | Rialto, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2018 | Dec 2024 | Solar |
| Chambers 4 - Eastvale DCA2 | MN8 Energy LLC | Eastvale, CA | California Independent System Operator (CISO) | 424.0 MWh | Nov 2018 | Dec 2024 | Solar |
| Chambers 4 - San Bernardino SNA7 | MN8 Energy LLC | San Bernardino, CA | California Independent System Operator (CISO) | 595.0 MWh | Nov 2018 | Dec 2024 | Solar |
| Fremont CA AutoFactory | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 480.0 MWh | Feb 2022 | Dec 2024 | Solar |
| CA-Ventura Co CCD-Oxnard College Canopy | Forefront Power, LLC | Ventura, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2022 | Dec 2024 | Solar |
| Oberon Solar Project | IP Oberon LLC | Desert Center, CA | California Independent System Operator (CISO) | 586.3 GWh | Aug 2023 | Feb 2026 | Solar |
| Oberon II Solar Project | IP Oberon II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 588.8 GWh | Aug 2023 | Feb 2026 | Solar |
| Blythe Mesa Solar II | Blythe Mesa Solar II, LLC | Blythe, CA | California Independent System Operator (CISO) | 585.9 GWh | Nov 2022 | Feb 2026 | Solar |
| Sandrini Solar 100 | EDPR CA Solar Park II LLC | Mettler, CA | California Independent System Operator (CISO) | 230.2 GWh | Nov 2024 | Feb 2026 | Solar |
| Victory Pass | Victory Pass I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 565.2 GWh | Feb 2024 | Feb 2026 | Solar |
| Arica Solar | Arica Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 779.1 GWh | Feb 2024 | Feb 2026 | Solar |
| Kings River Syphon | Orange Cove Irrigation District | Sanger, CA | California Independent System Operator (CISO) | 325.0 MWh | Aug 1990 | May 2024 | Water |
| Wonderful Huller & Shelling | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 3.5 GWh | Jul 2021 | Dec 2024 | Solar |
| Dover Dairy | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 2.7 GWh | Apr 2022 | Dec 2023 | Solar |
| Ventura Solar | Ventura Solar LLC | Fillmore, CA | California Independent System Operator (CISO) | 6.2 GWh | Aug 2021 | Dec 2024 | Solar |
| Wonderful Nursery | Wonderful Renewable Energy, LLC. | Wasco, CA | California Independent System Operator (CISO) | 4.6 GWh | Jun 2021 | Dec 2024 | Solar |
| IGS KSBD | Greenbacker Renewable Energy Corporation | Highland, CA | California Independent System Operator (CISO) | 9.0 GWh | Feb 2022 | Dec 2024 | Solar |
| Wonderful Lost Hills | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 48.2 GWh | Aug 2021 | Dec 2024 | Solar |
| Comcast - Universal City | Bloom Energy | Universal City, CA | California Independent System Operator (CISO) | 7.8 GWh | Aug 2021 | Dec 2024 | Natural Gas |
| OK Produce Fresno Carport | OK Produce | Fresno, CA | California Independent System Operator (CISO) | 3.6 GWh | Dec 2018 | Dec 2024 | Solar |
| Edwards Sanborn E1B | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 351.5 GWh | Oct 2022 | Feb 2026 | Solar |
| Edwards Sanborn E4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 321.4 GWh | Nov 2022 | Feb 2026 | Solar |
| Edwards Sanborn E5 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 154.5 GWh | Nov 2022 | Feb 2026 | Solar |
| Edwards Sanborn S4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 89.8 GWh | Oct 2022 | Feb 2026 | Solar |
| CA-DGS-California Correctional Inst | Forefront Power, LLC | Tehachapi, CA | California Independent System Operator (CISO) | 7.3 GWh | Mar 2024 | Dec 2024 | Solar |
| CA - DGS RFP - RJ Donovan State Prison | Forefront Power, LLC | San Diego, CA | California Independent System Operator (CISO) | 5.1 GWh | Dec 2023 | Dec 2024 | Solar |
| Laredo Detention Facility - Solar 2, 3 | County of Kern | Bakersfield, CA | California Independent System Operator (CISO) | 5.1 GWh | Oct 2021 | Dec 2024 | Solar |
| Sealed Air Madera Solar Project | Sealed Air Corporation | Madera, CA | California Independent System Operator (CISO) | 6.1 GWh | Apr 2022 | Dec 2024 | Solar |
| Chambers 4 - Eastvale LGB3 | MN8 Energy LLC | Eastvale, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2019 | Dec 2024 | Solar |
| POM Juice Solar | Wonderful Renewable Energy, LLC. | Fresno, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2021 | Dec 2024 | Solar |
| POM Beverage Solar | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 4.5 GWh | Jun 2021 | Dec 2024 | Solar |
| Chambers 4 - Redland LGB4 | MN8 Energy LLC | Redlands, CA | California Independent System Operator (CISO) | 1.4 GWh | Feb 2019 | Dec 2024 | Solar |
| Berrenda Mesa Water District | The Greater Light USA LLC | Lost Hills, CA | California Independent System Operator (CISO) | 16.5 GWh | Jun 2023 | Dec 2024 | Solar |
| Arlington Microgrid | PUD No 1 of Snohomish County | Arlington, WA | Bonneville Power Administration (BPAT) | 532.0 MWh | May 2019 | Dec 2024 | Solar |
| Flathead Landfill to Gas Energy Facility | Flathead Electric Coop Inc | Kalispell, MT | Bonneville Power Administration (BPAT) | 17.8 GWh | May 2009 | Dec 2024 | Landfill Gas |
| Horn Rapids Solar, Storage and Training | Energy Northwest | Richland, WA | Bonneville Power Administration (BPAT) | 5.2 GWh | Sep 2020 | Dec 2024 | Solar |
| Wheatridge East Wind | Wheatridge East Wind LLC | Lexington, OR | Bonneville Power Administration (BPAT) | 335.3 GWh | - | Feb 2026 | Wind |
| Green Solar LLC (CSG) | SolRiver Capital LLC | Culver, OR | Bonneville Power Administration (BPAT) | 3.1 GWh | Jun 2024 | Dec 2024 | Solar |
| Goose Prairie Solar | Goose Prairie Solar LLC | Moxee, WA | Bonneville Power Administration (BPAT) | 175.3 GWh | Nov 2024 | Feb 2026 | Solar |
| Fort Rock IV | Fort Rock Solar IV LLC | Fort Rock, OR | Bonneville Power Administration (BPAT) | 24.0 GWh | May 2020 | Dec 2024 | Solar |
| Riley | Riley Solar I LLC | Riley, OR | Bonneville Power Administration (BPAT) | 23.0 GWh | Jun 2020 | Dec 2024 | Solar |
| Suntex Solar, LLC | SC Oregon 2 Lessor Parent, LLC | Riley, OR | Bonneville Power Administration (BPAT) | 24.7 GWh | Jun 2020 | Dec 2024 | Solar |
| Orchard Windfarm 3, LLC | Orchard Windfarm, LLC | Lexington, OR | Bonneville Power Administration (BPAT) | 27.9 GWh | Nov 2020 | Dec 2024 | Wind |
| Rock Garden Solar, LLC | SC Oregon 2 Lessor Parent, LLC | Fort Rock, OR | Bonneville Power Administration (BPAT) | 24.6 GWh | May 2020 | Dec 2024 | Solar |
| Alkali Solar, LLC | SC Oregon 2 Lessor Parent, LLC | Silver Lake, OR | Bonneville Power Administration (BPAT) | 25.4 GWh | May 2020 | Dec 2024 | Solar |
| West Hines Solar I, LLC | SC Oregon 2 Lessor Parent, LLC | Hines, OR | Bonneville Power Administration (BPAT) | 22.4 GWh | May 2020 | Dec 2024 | Solar |
| Starvation | Starvation Solar I, LLC | Hines, OR | Bonneville Power Administration (BPAT) | 23.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Fort Rock I | Fort Rock Solar I, LLC | Silver Lake, OR | Bonneville Power Administration (BPAT) | 24.7 GWh | Feb 2020 | Dec 2024 | Solar |
| Orchard Windfarm 2, LLC | Orchard Windfarm, LLC | Lexington, OR | Bonneville Power Administration (BPAT) | 29.8 GWh | Nov 2020 | Dec 2024 | Wind |
| Wheatridge 1 | Portland General Electric Co | Lexington, OR | Bonneville Power Administration (BPAT) | 248.1 GWh | Nov 2020 | Feb 2026 | Wind |
| Smith Falls Hydro Project | Smith Creek Hydro, LLC | Bonners Ferry, ID | Bonneville Power Administration (BPAT) | 83.0 GWh | Nov 1989 | Nov 2024 | Water |
| Univ of Oregon Central Power Station | University of Oregon | Eugene, OR | Bonneville Power Administration (BPAT) | 936.8 MWh | Aug 2009 | Dec 2024 | Natural Gas : 80.2% Distillate Fuel Oil : 19.8% |
| Vansycle | ESI Vansycle Partners LP | Touchet, OR | Bonneville Power Administration (BPAT) | 60.0 GWh | Jul 1998 | Dec 2024 | Wind |
| Lilliwaup Falls Generating | William G. Reed Jr | Lilliwaup, WA | Bonneville Power Administration (BPAT) | 5.4 GWh | Apr 1986 | Dec 2024 | Water |
| Falls River Hydro | Marysville Hydro Partners | Ashton, ID | Bonneville Power Administration (BPAT) | 47.4 GWh | Jul 1993 | Dec 2024 | Water |
| Longview Fibre | Longview Fibre Co | Longview, WA | Bonneville Power Administration (BPAT) | 235.4 GWh | Dec 1948 | Dec 2024 | Black Liquor : 83.1% Natural Gas : 15.4% Wood/Wood Waste Solids : 1.5% |
| Middle Fork Irrigation District | Middle Fork Irrigation Dist | Parkdale, OR | Bonneville Power Administration (BPAT) | 20.1 GWh | Feb 1986 | Dec 2024 | Water |
| Albeni Falls | USACE Northwestern Division | Oldtown, ID | Bonneville Power Administration (BPAT) | 179.3 GWh | Apr 1955 | Dec 2024 | Water |
| Palisades Dam | U S Bureau of Reclamation | Palisades, ID | Bonneville Power Administration (BPAT) | 744.4 GWh | Jan 1957 | Dec 2024 | Water |
| Columbia Generating Station | Energy Northwest | Richland, WA | Bonneville Power Administration (BPAT) | 7.6 TWh | Nov 1984 | Feb 2026 | Nuclear |
| Dworshak | USACE Northwestern Division | Ahsahka, ID | Bonneville Power Administration (BPAT) | 1.4 TWh | Aug 1974 | Dec 2024 | Water |
| Packwood | Energy Northwest | Packwood, WA | Bonneville Power Administration (BPAT) | 63.0 GWh | Mar 1964 | Dec 2024 | Water |
| The Dalles | USACE Northwestern Division | The Dalles, OR | Bonneville Power Administration (BPAT) | 6.4 TWh | May 1957 | Feb 2026 | Water |
| Foster | USACE Northwestern Division | Foster, OR | Bonneville Power Administration (BPAT) | 56.9 GWh | Aug 1968 | Dec 2024 | Water |
| Lower Monumental | USACE Northwestern Division | Kahlotus, WA | Bonneville Power Administration (BPAT) | 1.5 TWh | May 1969 | Feb 2026 | Water |
| Roza | U S Bureau of Reclamation | Yakima, WA | Bonneville Power Administration (BPAT) | 47.7 GWh | Jul 1958 | Dec 2024 | Water |
| Coffin Butte | Pacific Northwest Generating Coop | Corvallis, OR | Bonneville Power Administration (BPAT) | 38.4 GWh | Sep 1995 | Dec 2024 | Landfill Gas |
| Green Springs | U S Bureau of Reclamation | Columbia Falls, OR | Bonneville Power Administration (BPAT) | 37.7 GWh | Apr 1960 | Dec 2024 | Water |
| Moyie Springs | City of Bonners Ferry | Moyie Springs, ID | Bonneville Power Administration (BPAT) | 20.9 GWh | Nov 1921 | Dec 2024 | Water |
| Chandler | U S Bureau of Reclamation | Benton City, WA | Bonneville Power Administration (BPAT) | 31.4 GWh | Jan 1956 | Dec 2024 | Water |
Summary of Power Plants By State
Figures are based on February 2026 generation numbers.| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 77 | 10,522.92 GWh |
| Alaska | # 48 | 139 | 547.09 GWh |
| Arizona | # 16 | 184 | 7,875.02 GWh |
| Arkansas | # 25 | 114 | 5,134.19 GWh |
| California | # 5 | 1,677 | 13,090.02 GWh |
| Colorado | # 31 | 294 | 4,129.24 GWh |
| Connecticut | # 32 | 162 | 3,713.11 GWh |
| Delaware | # 49 | 33 | 489.00 GWh |
| District of Columbia | # 51 | 16 | 15.28 GWh |
| Florida | # 3 | 334 | 18,619.02 GWh |
| Georgia | # 8 | 248 | 10,834.93 GWh |
| Hawaii | # 47 | 70 | 669.33 GWh |
| Idaho | # 41 | 145 | 1,901.37 GWh |
| Illinois | # 4 | 380 | 14,875.53 GWh |
| Indiana | # 12 | 216 | 9,790.54 GWh |
| Iowa | # 19 | 290 | 6,378.25 GWh |
| Kansas | # 29 | 183 | 4,702.54 GWh |
| Kentucky | # 22 | 60 | 6,056.73 GWh |
| Louisiana | # 17 | 86 | 7,844.56 GWh |
| Maine | # 45 | 215 | 1,304.77 GWh |
| Maryland | # 38 | 203 | 3,022.33 GWh |
| Massachusetts | # 43 | 638 | 1,703.92 GWh |
| Michigan | # 11 | 268 | 9,944.77 GWh |
| Minnesota | # 28 | 763 | 4,707.75 GWh |
| Mississippi | # 23 | 56 | 5,592.62 GWh |
| Missouri | # 24 | 127 | 5,447.62 GWh |
| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,424.51 GWh |
| Nebraska | # 35 | 124 | 3,248.85 GWh |
| Nevada | # 39 | 114 | 3,017.15 GWh |
| New Hampshire | # 44 | 56 | 1,533.32 GWh |
| New Jersey | # 27 | 386 | 5,076.17 GWh |
| New Mexico | # 37 | 143 | 3,060.89 GWh |
| New York | # 9 | 949 | 10,653.43 GWh |
| North Carolina | # 7 | 903 | 11,173.71 GWh |
| North Dakota | # 33 | 59 | 3,698.46 GWh |
| Ohio | # 6 | 200 | 13,061.62 GWh |
| Oklahoma | # 18 | 141 | 6,415.64 GWh |
| Oregon | # 21 | 270 | 6,135.97 GWh |
| Pennsylvania | # 2 | 251 | 20,963.61 GWh |
| Rhode Island | # 46 | 100 | 708.28 GWh |
| South Carolina | # 15 | 207 | 8,044.42 GWh |
| South Dakota | # 42 | 52 | 1,872.08 GWh |
| Tennessee | # 20 | 88 | 6,323.51 GWh |
| Texas | # 1 | 959 | 41,824.62 GWh |
| Utah | # 36 | 125 | 3,187.35 GWh |
| Vermont | # 50 | 116 | 163.02 GWh |
| Virginia | # 14 | 236 | 9,222.47 GWh |
| Washington | # 13 | 135 | 9,340.69 GWh |
| West Virginia | # 30 | 40 | 4,249.38 GWh |
| Wisconsin | # 26 | 239 | 5,119.83 GWh |
| Wyoming | # 34 | 70 | 3,369.17 GWh |