2127 Harris Solar Project
11160 Hampton Road, Live Oak, CA 95953Plant Summary Information
2127 Harris Solar Project is ranked #749 out of 849 solar farms in California in terms of total annual net electricity generation.
2127 Harris Solar Project generated 222.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | 2127 Harris Solar Project |
|---|---|
| Utility Name | Solarenewal LLC |
| Location | Butte County, CA |
| Initial Operation Date | April 2014 |
| Last Update | Dec 2024 |
| Annual Generation | 1.5 GWh |
| Annual Consumption | 5.3 k MMBtu |
| Ranked #11,123 out of 12,539 Power Plants Nationwide | |
| Ranked #5,836 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #1,477 out of 1,600 California Power Plants | |
| Ranked #749 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Pristine Sun LLC (2013 to 2016) Solarenewal LLC (2017 to 2024) |
Map of 2127 Harris Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for 2127 Harris Solar Project.
Monthly Net Generation for 2127 Harris Solar Project
2127 Harris Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | 2127 Harris Solar Project (58919) |
| Plant Address | 11160 Hampton Road, Live Oak, CA 95953 |
| Utility | Solarenewal LLC (61315) |
| Latitude, Longitude | 39.29167, -121.66972 |
| Generation Dates on File | Apr 2014 to Dec 2024 |
| Initial Operation Date | April 2014 |
| Annual Generation | 1.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator 2127 Details Operating April 2014
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.3 MW |
| Summer Capacity | 1.3 MW |
| Winter Capacity | 1.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2014 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| DC Net Capacity | 1.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
2127 Harris Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5826 | Malone Solar Site | Malone, NY | 1.5 GWh |
| #5827 | Johnson 1 Community Solar | Lindstrom, MN | 1.5 GWh |
| #5828 | Middlesex Vo Tech Solar 1 LLC | Piscataway, NJ | 1.5 GWh |
| #5829 | Putnam Solar 1B | Granville, IL | 1.5 GWh |
| #5830 | Western Michigan Solar Gardens | Kalamazoo, MI | 1.5 GWh |
| #5831 | Neuse River Solar Farm | Raleigh, NC | 1.5 GWh |
| #5832 | Tisbury Landfill Solar | Tisbury, MA | 1.5 GWh |
| #5833 | Hot Springs 2020 | Hot Springs, AR | 1.5 GWh |
| #5834 | Hy-Vee Customer Hosted 2.25MW Solar | Chariton, IA | 1.5 GWh |
| #5835 | Adams Solar | Lebanon, CT | 1.5 GWh |
| #5837 | Kapaa Photovoltaic Project | Kapaa, HI | 1.5 GWh |
| #5838 | Norton | Norton, MA | 1.5 GWh |
| #5839 | Fort Bragg - Camp Mackall PV BESS System | Hoffman, NC | 1.5 GWh |
| #5840 | Innovative Solar 59, LLC | Nashville, NC | 1.5 GWh |
| #5841 | State Street Solar LLC | Palmer, MA | 1.5 GWh |
| #5842 | Sauk DPC Solar | Wonewoc, WI | 1.5 GWh |
| #5843 | Spring Prairie Solar LLC CSG | Glyndon, MN | 1.5 GWh |
| #5844 | Oxon Run CREF | Washington, DC | 1.5 GWh |
| #5845 | Cummins, Inc | Lakewood, NY | 1.5 GWh |
| #5846 | Plainfield Solar 2 | Plainfield, CT | 1.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding 2127 Harris Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Abel Road Bioenergy | Williams, CA | 22.3 GWh | 26.1 mi |
| Butte College Main Campus Solar | Oroville, CA | 6.3 GWh | 24.7 mi |
| Colgate | Dobbins, CA | 1.4 TWh | 25.7 mi |
| Edward C Hyatt | Oroville, CA | 1.9 TWh | 19.8 mi |
| Feather River Energy Center | Yuba City, CA | 45.7 GWh | 13 mi |
| G2 Energy Ostrom Road LLC | Wheatland, CA | 29.0 GWh | 20.9 mi |
| Greenleaf 1 | Yuba City, CA | 4.1 GWh | 16.6 mi |
| Greenleaf 2 Power Plant | Yuba City, CA | 13.0 GWh | 10.8 mi |
| Gridley Main | Gridley, CA | 1.6 GWh | 5.7 mi |
| Gridley Main Two | Gridley, CA | 3.4 GWh | 5.7 mi |
| Kelly Ridge | Oroville, CA | 66.5 GWh | 19.1 mi |
| Narrows 2 | Browns Valley, CA | 156.8 GWh | 21.7 mi |
| Narrows PH | Grass Valley, CA | 80.8 GWh | 21.6 mi |
| Oroville Cogeneration LP | Oroville, CA | 672.3 MWh | 15 mi |
| Sacramento Municipal Util Dist | Sacramento, CA | 15.9 GWh | 25.3 mi |
| Sutter Energy Center | Yuba City, CA | 1.7 TWh | 16.5 mi |
| Thermalito | Oroville, CA | 308.5 GWh | 15.6 mi |
| Thermalito Diverson Dam | Oroville, CA | 19.2 GWh | 17.7 mi |
| Yuba City Cogen Partners | Yuba City, CA | 22.9 GWh | 10.8 mi |
| Yuba City Energy Center | Yuba City, CA | 39.1 GWh | 10.7 mi |