2081 Terzian Solar Project

4735 South Englehart Ave, Reedley, CA 93654

Plant Summary Information

2081 Terzian Solar Project is ranked #842 out of 917 solar farms in California in terms of total annual net electricity generation.

2081 Terzian Solar Project generated 173.0 MWh during the 3-month period between September 2025 to December 2025.

Plant Name2081 Terzian Solar Project
Utility NameSolarenewal LLC
LocationFresno County, CA
Initial Operation DateFebruary 2014
Last Update Dec 2025
Annual Generation 1.2 GWh
Annual Consumption 4.5 k MMBtu
Ranked #12,004 out of 13,301 Power Plants Nationwide
Ranked #6,737 out of 7,209 Solar Power Plants Nationwide
Ranked #1,538 out of 1,641 California Power Plants
Ranked #842 out of 917 California Solar Power Plants
Fuel Types Solar
Previous Operator Pristine Sun LLC (2013 to 2016)
Solarenewal LLC (2017 to 2025)

Map of 2081 Terzian Solar Project

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for 2081 Terzian Solar Project.

Create Your Account Today

Monthly Net Generation for 2081 Terzian Solar Project

Monthly Plant Fuel Consumption for 2081 Terzian Solar Project

2081 Terzian Solar Project Details

Summary Information
Plant Name2081 Terzian Solar Project (58918)
Plant Address4735 South Englehart Ave, Reedley, CA 93654
UtilitySolarenewal LLC (61315)
Latitude, Longitude36.67, -119.41583
Generation Dates on FileFeb 2014 to Dec 2025
Initial Operation DateFebruary 2014
Annual Generation 1.2 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co (14328) CA
Grid Voltage 12.00 kV
Energy StorageNo

Generator 2081 Details Operating February 2014

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.2 MW
Summer Capacity1.2 MW
Winter Capacity1.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateFebruary 2014
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Solar Details
Single Axis TrackingNo
Dual Axis TrackingYes
DC Net Capacity1.6 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

2081 Terzian Solar Project Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#6727SV CSG Kirkland 1 LLCKirkland, IL1.3 GWh
#6728SCH County - (1E) 398 Anthony St SchenecSchenectady, NY1.3 GWh
#6729CS Murphy Point, LLCMurphy, NC1.3 GWh
#6730Intel FolsomFolsom, CA1.3 GWh
#6731Ellis Creek SolarPetaluma, CA1.3 GWh
#6732Kent County - Worton ComplexWorton, MD1.3 GWh
#6733Dinuba Wastewater Treatment PlantDinuba, CA1.3 GWh
#6734Afton SolarAfton, NY1.3 GWh
#6735Barneveld SolarBarneveld, NY1.3 GWh
#6736Summit Water Nexus Mt. Holly, LLC SolarLumberton, NJ1.2 GWh
#6738Webster SolarWebster, MA1.2 GWh
#6739Union ValeLagrangeville, NY1.2 GWh
#6740NY - Mines PressCortlandt, NY33.0 MWh
#6741Nordhoff PlaceChatsworth, CA1.2 GWh
#6742Conn Mun Electric Energy CoopNorwich, CT1.2 GWh
#6743Chaberton Solar GreyrockPittsville, MD1.2 GWh
#6744MN CSG 2019-105Wabash, MN1.2 GWh
#6745Martins Creek Solar NC, LLCMurphy, NC1.2 GWh
#6746Caesar's Atlantic City - POI 1 (ColosseuAtlantic City, NJ1.2 GWh
#6747Federalsburg Energy Storage 1 LLCFederaslburg, MD1.2 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding 2081 Terzian Solar Project.

Plant NamePlant LocationAnnual GenerationDistance
Agriculture Capital - Legacy PackingDinuba, CA4.0 GWh12.4 mi
Algonquin Power Sanger LLCSanger, CA3.0 GWh7.6 mi
Bob Wiley Detention CenterVisalia, CA2.8 GWh16 mi
CA - Fresno County - Juvenile HallFresno, CA6.8 GWh17.2 mi
CA - Fresno, City of - SE Surface WTPFresno, CA7.1 GWh14.1 mi
Clovis East High SchoolClovis, CA1.3 GWh15.3 mi
Dinuba Wastewater Treatment PlantDinuba, CA1.3 GWh9.1 mi
Elkhorn DairyVisalia, CA1.3 GWh14.2 mi
Fresno Sunnyside High School HybridFresno, CA2.3 GWh17.3 mi
FTF-PackingShedReedley, CA747.6 MWh8.5 mi
Kingsburg CogenKingsburg, CA8.4 GWh12.8 mi
Kingsburg SolarKingsburg, CA6.3 GWh13.3 mi
Moonlight Packing - Phase 2Reedley, CA2.7 GWh6.5 mi
National RaisinFowler, CA4.6 GWh14.6 mi
North Juvenile Detention Center SolarVisalia, CA2.3 GWh15.4 mi
Pine FlatPiedra, CA323.2 GWh12.3 mi
POM Plant 1Del Rey, CA5.1 GWh9.5 mi
POM Plant 2Del Rey, CA3.4 GWh9.8 mi
Reedley Community College SolarReedley, CA4.0 GWh5 mi
Visalia - (CA)Visalia, CA3.2 GWh16 mi