2081 Terzian Solar Project
4735 South Englehart Ave, Reedley, CA 93654Plant Summary Information
2081 Terzian Solar Project is ranked #842 out of 917 solar farms in California in terms of total annual net electricity generation.
2081 Terzian Solar Project generated 173.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | 2081 Terzian Solar Project |
|---|---|
| Utility Name | Solarenewal LLC |
| Location | Fresno County, CA |
| Initial Operation Date | February 2014 |
| Last Update | Dec 2025 |
| Annual Generation | 1.2 GWh |
| Annual Consumption | 4.5 k MMBtu |
| Ranked #12,004 out of 13,301 Power Plants Nationwide | |
| Ranked #6,737 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #1,538 out of 1,641 California Power Plants | |
| Ranked #842 out of 917 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Pristine Sun LLC (2013 to 2016) Solarenewal LLC (2017 to 2025) |
Map of 2081 Terzian Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for 2081 Terzian Solar Project.
Monthly Net Generation for 2081 Terzian Solar Project
Monthly Plant Fuel Consumption for 2081 Terzian Solar Project
2081 Terzian Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | 2081 Terzian Solar Project (58918) |
| Plant Address | 4735 South Englehart Ave, Reedley, CA 93654 |
| Utility | Solarenewal LLC (61315) |
| Latitude, Longitude | 36.67, -119.41583 |
| Generation Dates on File | Feb 2014 to Dec 2025 |
| Initial Operation Date | February 2014 |
| Annual Generation | 1.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator 2081 Details Operating February 2014
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.2 MW |
| Summer Capacity | 1.2 MW |
| Winter Capacity | 1.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 2014 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Solar Details | |
| Single Axis Tracking | No |
|---|---|
| Dual Axis Tracking | Yes |
| DC Net Capacity | 1.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
2081 Terzian Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6727 | SV CSG Kirkland 1 LLC | Kirkland, IL | 1.3 GWh |
| #6728 | SCH County - (1E) 398 Anthony St Schenec | Schenectady, NY | 1.3 GWh |
| #6729 | CS Murphy Point, LLC | Murphy, NC | 1.3 GWh |
| #6730 | Intel Folsom | Folsom, CA | 1.3 GWh |
| #6731 | Ellis Creek Solar | Petaluma, CA | 1.3 GWh |
| #6732 | Kent County - Worton Complex | Worton, MD | 1.3 GWh |
| #6733 | Dinuba Wastewater Treatment Plant | Dinuba, CA | 1.3 GWh |
| #6734 | Afton Solar | Afton, NY | 1.3 GWh |
| #6735 | Barneveld Solar | Barneveld, NY | 1.3 GWh |
| #6736 | Summit Water Nexus Mt. Holly, LLC Solar | Lumberton, NJ | 1.2 GWh |
| #6738 | Webster Solar | Webster, MA | 1.2 GWh |
| #6739 | Union Vale | Lagrangeville, NY | 1.2 GWh |
| #6740 | NY - Mines Press | Cortlandt, NY | 33.0 MWh |
| #6741 | Nordhoff Place | Chatsworth, CA | 1.2 GWh |
| #6742 | Conn Mun Electric Energy Coop | Norwich, CT | 1.2 GWh |
| #6743 | Chaberton Solar Greyrock | Pittsville, MD | 1.2 GWh |
| #6744 | MN CSG 2019-105 | Wabash, MN | 1.2 GWh |
| #6745 | Martins Creek Solar NC, LLC | Murphy, NC | 1.2 GWh |
| #6746 | Caesar's Atlantic City - POI 1 (Colosseu | Atlantic City, NJ | 1.2 GWh |
| #6747 | Federalsburg Energy Storage 1 LLC | Federaslburg, MD | 1.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding 2081 Terzian Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Agriculture Capital - Legacy Packing | Dinuba, CA | 4.0 GWh | 12.4 mi |
| Algonquin Power Sanger LLC | Sanger, CA | 3.0 GWh | 7.6 mi |
| Bob Wiley Detention Center | Visalia, CA | 2.8 GWh | 16 mi |
| CA - Fresno County - Juvenile Hall | Fresno, CA | 6.8 GWh | 17.2 mi |
| CA - Fresno, City of - SE Surface WTP | Fresno, CA | 7.1 GWh | 14.1 mi |
| Clovis East High School | Clovis, CA | 1.3 GWh | 15.3 mi |
| Dinuba Wastewater Treatment Plant | Dinuba, CA | 1.3 GWh | 9.1 mi |
| Elkhorn Dairy | Visalia, CA | 1.3 GWh | 14.2 mi |
| Fresno Sunnyside High School Hybrid | Fresno, CA | 2.3 GWh | 17.3 mi |
| FTF-PackingShed | Reedley, CA | 747.6 MWh | 8.5 mi |
| Kingsburg Cogen | Kingsburg, CA | 8.4 GWh | 12.8 mi |
| Kingsburg Solar | Kingsburg, CA | 6.3 GWh | 13.3 mi |
| Moonlight Packing - Phase 2 | Reedley, CA | 2.7 GWh | 6.5 mi |
| National Raisin | Fowler, CA | 4.6 GWh | 14.6 mi |
| North Juvenile Detention Center Solar | Visalia, CA | 2.3 GWh | 15.4 mi |
| Pine Flat | Piedra, CA | 323.2 GWh | 12.3 mi |
| POM Plant 1 | Del Rey, CA | 5.1 GWh | 9.5 mi |
| POM Plant 2 | Del Rey, CA | 3.4 GWh | 9.8 mi |
| Reedley Community College Solar | Reedley, CA | 4.0 GWh | 5 mi |
| Visalia - (CA) | Visalia, CA | 3.2 GWh | 16 mi |