2081 Terzian Solar Project

4735 South Englehart Ave, Reedley, CA 93654

Plant Summary Information

2081 Terzian Solar Project is ranked #625 out of 761 solar farms in California in terms of total annual net electricity generation.

2081 Terzian Solar Project generated 379.0 MWh during the 3-month period between September 2023 to December 2023.

Plant Name2081 Terzian Solar Project
Utility NameSolarenewal LLC
LocationFresno County, CA
Initial Operation DateFebruary 2014
Last Update Dec 2023
Annual Generation 2.0 GWh
Annual Consumption 7.3 k MMBtu
Ranked #9,790 out of 11,623 Power Plants Nationwide
Ranked #4,685 out of 5,666 Solar Power Plants Nationwide
Ranked #1,322 out of 1,487 California Power Plants
Ranked #625 out of 761 California Solar Power Plants
Fuel Types Solar
Previous Operator Pristine Sun LLC (2013 to 2016)
Solarenewal LLC (2017 to 2023)

Map of 2081 Terzian Solar Project

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for 2081 Terzian Solar Project.

Create Your Account Today

Monthly Net Generation for 2081 Terzian Solar Project

2081 Terzian Solar Project Details

Summary Information
Plant Name2081 Terzian Solar Project (58918)
Plant Address4735 South Englehart Ave, Reedley, CA 93654
UtilitySolarenewal LLC (61315)
Latitude, Longitude36.67, -119.41583
Generation Dates on FileFeb 2014 to Dec 2023
Initial Operation DateFebruary 2014
Annual Generation 2.0 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co (14328) CA
Grid Voltage 12.00 kV
Energy StorageNo

Generator 2081 Details Operating February 2014

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.2 MW
Summer Capacity1.2 MW
Winter Capacity1.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateFebruary 2014
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Solar Details
Single Axis TrackingNo
Dual Axis TrackingYes
DC Net Capacity1.6 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

2081 Terzian Solar Project Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#4675Novel Debra Solar LLC CSGMantorville, MN2.0 GWh
#4676Concord Solar FarmConcord, MA2.0 GWh
#4677SCCCD - Clovis Community CollegeFresno, CA2.0 GWh
#4678Amphitheater High School SolarTucson, AZ2.0 GWh
#4679Newton GroveNewton Grove, NC2.0 GWh
#4680Sullivan SolarNew Bedford, MA2.0 GWh
#4681USS Brockway Solar CSGSartell, MN2.0 GWh
#4682RIT Henrietta Solar 1, LLCRochester, NY2.0 GWh
#4683CarverNorth Carver, MA2.0 GWh
#4684Plymouth Solar LLCPlymouth, NC2.0 GWh
#4686Milhurst SolarManalapan, NJ2.0 GWh
#4687Bainbridge SolarBainbridge, GA2.0 GWh
#4688Franklin Solar SiteMalone, NY2.0 GWh
#4689Solar Mule, LLCOakland, ME2.0 GWh
#4690USS Nillie Corn Solar CSGNorth Branch, MN2.0 GWh
#4691DG Webster LLC CSGWebster, MA2.0 GWh
#4692Tannery Road LandfillRome, NY2.0 GWh
#4693Brookfield Solar 2013 LLCNorth Brookfield, MA2.0 GWh
#4694Pelzer Solar IPelzer, SC2.0 GWh
#4695Agawam SolarAgawam, MA2.0 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding 2081 Terzian Solar Project.

Plant NamePlant LocationAnnual GenerationDistance
Agriculture Capital - Legacy PackingDinuba, CA1.5 GWh12.4 mi
Algonquin Power Sanger LLCSanger, CA10.0 GWh7.6 mi
CA - Fresno County - Juvenile HallFresno, CA5.4 GWh17.2 mi
Clovis East High SchoolClovis, CA1.4 GWh15.3 mi
Clovis High SchoolClovis, CA1.3 GWh17.9 mi
Dinuba Wastewater Treatment PlantDinuba, CA1.6 GWh9.1 mi
Dover DairyHanford, CA2.7 GWh19.2 mi
Fresno Sunnyside High School HybridFresno, CA2.5 GWh17.3 mi
FTF-PackingShedReedley, CA1.1 GWh8.5 mi
Kingsburg CogenKingsburg, CA4.6 GWh12.8 mi
Kingsburg SolarKingsburg, CA2.8 GWh13.3 mi
Malaga Power LLCFresno, CA14.1 GWh18 mi
Moonlight Packing - Phase 2Reedley, CA2.7 GWh6.5 mi
National RaisinFowler, CA4.8 GWh14.6 mi
Pine FlatPiedra, CA448.7 GWh12.3 mi
POM Juice SolarFresno, CA352.0 MWh19.5 mi
POM Plant 1Del Rey, CA2.1 GWh9.5 mi
POM Plant 2Del Rey, CA292.0 MWh9.8 mi
Reedley Community College SolarReedley, CA4.0 GWh5 mi
Rio Bravo FresnoFresno, CA145.1 GWh17.1 mi