2081 Terzian Solar Project

4735 South Englehart Ave, Reedley, CA 93654

Plant Summary Information

2081 Terzian Solar Project is ranked #733 out of 885 solar farms in California in terms of total annual net electricity generation.

2081 Terzian Solar Project generated 318.0 MWh during the 3-month period between September 2024 to December 2024.

Plant Name2081 Terzian Solar Project
Utility NameSolarenewal LLC
LocationFresno County, CA
Initial Operation DateFebruary 2014
Last Update Dec 2024
Annual Generation 1.8 GWh
Annual Consumption 6.6 k MMBtu
Ranked #11,126 out of 13,081 Power Plants Nationwide
Ranked #5,965 out of 7,015 Solar Power Plants Nationwide
Ranked #1,416 out of 1,606 California Power Plants
Ranked #733 out of 885 California Solar Power Plants
Fuel Types Solar
Previous Operator Pristine Sun LLC (2013 to 2016)
Solarenewal LLC (2017 to 2025)

Map of 2081 Terzian Solar Project

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for 2081 Terzian Solar Project.

Create Your Account Today

Monthly Net Generation for 2081 Terzian Solar Project

Monthly Plant Fuel Consumption for 2081 Terzian Solar Project

2081 Terzian Solar Project Details

Summary Information
Plant Name2081 Terzian Solar Project (58918)
Plant Address4735 South Englehart Ave, Reedley, CA 93654
UtilitySolarenewal LLC (61315)
Latitude, Longitude36.67, -119.41583
Generation Dates on FileFeb 2014 to Dec 2024
Initial Operation DateFebruary 2014
Annual Generation 1.8 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co (14328) CA
Grid Voltage 12.00 kV
Energy StorageNo

Generator 2081 Details Operating February 2014

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.2 MW
Summer Capacity1.2 MW
Winter Capacity1.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateFebruary 2014
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Solar Details
Single Axis TrackingNo
Dual Axis TrackingYes
DC Net Capacity1.6 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

2081 Terzian Solar Project Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#5955Shakopee Met Council WTPShakopee, MN1.8 GWh
#5956CorcoranCorcoran, CA1.8 GWh
#5957Novel Denzer Solar LLC CSGMinnesota City, MN1.8 GWh
#5958Lincoln SolarMerrillville, IN1.8 GWh
#5959Brockelman Road Solar 2Lancaster, MA1.8 GWh
#5960Auriga Community SolarSlayton, MN1.8 GWh
#5961Midwest Energy Community Solar ArrayColby, KS1.8 GWh
#5962FastSun 9 CSGZumbrota, MN1.8 GWh
#5963Syncarpha Dodge 1 CSGDodge Center, MN1.8 GWh
#5964Hampden Landfill Solar LLCHampden, MA1.8 GWh
#5966Innovative Solar 59Nashville, NC1.8 GWh
#5967Panasonic Carport Solar HybridDenver, CO1.8 GWh
#5968Altair Community Solar GardenNew Richmond, MN1.8 GWh
#5969Linden 03 CSGBelle Plaine, MN1.8 GWh
#5970Brenda Luhman - CSGZumbrota, MN1.8 GWh
#5971FELPS 5- Floresville SouthFloresville, TX1.8 GWh
#5972MSC-GreyCloud01 Community SolarSt. Paul Park, MN1.8 GWh
#5973Deptford Solar FarmDeptford, NJ1.8 GWh
#5974Kaus Community SolarClaremont, MN1.8 GWh
#5975Canandaigua Westbrook Solar ArrayCanandaigua, NY1.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding 2081 Terzian Solar Project.

Plant NamePlant LocationAnnual GenerationDistance
Agriculture Capital - Legacy PackingDinuba, CA4.0 GWh12.4 mi
Algonquin Power Sanger LLCSanger, CA3.6 GWh7.6 mi
Bob Wiley Detention CenterVisalia, CA2.8 GWh16 mi
CA - Fresno County - Juvenile HallFresno, CA552.0 MWh17.2 mi
Clovis East High SchoolClovis, CA1.3 GWh15.3 mi
Dinuba Wastewater Treatment PlantDinuba, CA1.3 GWh9.1 mi
Elkhorn DairyVisalia, CA1.3 GWh14.2 mi
Fresno Sunnyside High School HybridFresno, CA2.5 GWh17.3 mi
FTF-PackingShedReedley, CA747.6 MWh8.5 mi
Gap Pacific Distribution CenterFresno, CA5.4 GWh17.9 mi
Kingsburg CogenKingsburg, CA8.4 GWh12.8 mi
Kingsburg SolarKingsburg, CA6.3 GWh13.3 mi
Moonlight Packing - Phase 2Reedley, CA2.7 GWh6.5 mi
National RaisinFowler, CA4.6 GWh14.6 mi
North Juvenile Detention Center SolarVisalia, CA2.3 GWh15.4 mi
Pine FlatPiedra, CA353.0 GWh12.3 mi
POM Plant 1Del Rey, CA5.1 GWh9.5 mi
POM Plant 2Del Rey, CA3.4 GWh9.8 mi
Reedley Community College SolarReedley, CA3.8 GWh5 mi
Visalia - (CA)Visalia, CA3.2 GWh16 mi