2081 Terzian Solar Project
4735 South Englehart Ave, Reedley, CA 93654Plant Summary Information
2081 Terzian Solar Project is ranked #733 out of 885 solar farms in California in terms of total annual net electricity generation.
2081 Terzian Solar Project generated 318.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | 2081 Terzian Solar Project |
|---|---|
| Utility Name | Solarenewal LLC |
| Location | Fresno County, CA |
| Initial Operation Date | February 2014 |
| Last Update | Dec 2024 |
| Annual Generation | 1.8 GWh |
| Annual Consumption | 6.6 k MMBtu |
| Ranked #11,126 out of 13,081 Power Plants Nationwide | |
| Ranked #5,965 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #1,416 out of 1,606 California Power Plants | |
| Ranked #733 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Pristine Sun LLC (2013 to 2016) Solarenewal LLC (2017 to 2025) |
Map of 2081 Terzian Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for 2081 Terzian Solar Project.
Monthly Net Generation for 2081 Terzian Solar Project
Monthly Plant Fuel Consumption for 2081 Terzian Solar Project
2081 Terzian Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | 2081 Terzian Solar Project (58918) |
| Plant Address | 4735 South Englehart Ave, Reedley, CA 93654 |
| Utility | Solarenewal LLC (61315) |
| Latitude, Longitude | 36.67, -119.41583 |
| Generation Dates on File | Feb 2014 to Dec 2024 |
| Initial Operation Date | February 2014 |
| Annual Generation | 1.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator 2081 Details Operating February 2014
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.2 MW |
| Summer Capacity | 1.2 MW |
| Winter Capacity | 1.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 2014 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Solar Details | |
| Single Axis Tracking | No |
|---|---|
| Dual Axis Tracking | Yes |
| DC Net Capacity | 1.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
2081 Terzian Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5955 | Shakopee Met Council WTP | Shakopee, MN | 1.8 GWh |
| #5956 | Corcoran | Corcoran, CA | 1.8 GWh |
| #5957 | Novel Denzer Solar LLC CSG | Minnesota City, MN | 1.8 GWh |
| #5958 | Lincoln Solar | Merrillville, IN | 1.8 GWh |
| #5959 | Brockelman Road Solar 2 | Lancaster, MA | 1.8 GWh |
| #5960 | Auriga Community Solar | Slayton, MN | 1.8 GWh |
| #5961 | Midwest Energy Community Solar Array | Colby, KS | 1.8 GWh |
| #5962 | FastSun 9 CSG | Zumbrota, MN | 1.8 GWh |
| #5963 | Syncarpha Dodge 1 CSG | Dodge Center, MN | 1.8 GWh |
| #5964 | Hampden Landfill Solar LLC | Hampden, MA | 1.8 GWh |
| #5966 | Innovative Solar 59 | Nashville, NC | 1.8 GWh |
| #5967 | Panasonic Carport Solar Hybrid | Denver, CO | 1.8 GWh |
| #5968 | Altair Community Solar Garden | New Richmond, MN | 1.8 GWh |
| #5969 | Linden 03 CSG | Belle Plaine, MN | 1.8 GWh |
| #5970 | Brenda Luhman - CSG | Zumbrota, MN | 1.8 GWh |
| #5971 | FELPS 5- Floresville South | Floresville, TX | 1.8 GWh |
| #5972 | MSC-GreyCloud01 Community Solar | St. Paul Park, MN | 1.8 GWh |
| #5973 | Deptford Solar Farm | Deptford, NJ | 1.8 GWh |
| #5974 | Kaus Community Solar | Claremont, MN | 1.8 GWh |
| #5975 | Canandaigua Westbrook Solar Array | Canandaigua, NY | 1.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding 2081 Terzian Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Agriculture Capital - Legacy Packing | Dinuba, CA | 4.0 GWh | 12.4 mi |
| Algonquin Power Sanger LLC | Sanger, CA | 3.6 GWh | 7.6 mi |
| Bob Wiley Detention Center | Visalia, CA | 2.8 GWh | 16 mi |
| CA - Fresno County - Juvenile Hall | Fresno, CA | 552.0 MWh | 17.2 mi |
| Clovis East High School | Clovis, CA | 1.3 GWh | 15.3 mi |
| Dinuba Wastewater Treatment Plant | Dinuba, CA | 1.3 GWh | 9.1 mi |
| Elkhorn Dairy | Visalia, CA | 1.3 GWh | 14.2 mi |
| Fresno Sunnyside High School Hybrid | Fresno, CA | 2.5 GWh | 17.3 mi |
| FTF-PackingShed | Reedley, CA | 747.6 MWh | 8.5 mi |
| Gap Pacific Distribution Center | Fresno, CA | 5.4 GWh | 17.9 mi |
| Kingsburg Cogen | Kingsburg, CA | 8.4 GWh | 12.8 mi |
| Kingsburg Solar | Kingsburg, CA | 6.3 GWh | 13.3 mi |
| Moonlight Packing - Phase 2 | Reedley, CA | 2.7 GWh | 6.5 mi |
| National Raisin | Fowler, CA | 4.6 GWh | 14.6 mi |
| North Juvenile Detention Center Solar | Visalia, CA | 2.3 GWh | 15.4 mi |
| Pine Flat | Piedra, CA | 353.0 GWh | 12.3 mi |
| POM Plant 1 | Del Rey, CA | 5.1 GWh | 9.5 mi |
| POM Plant 2 | Del Rey, CA | 3.4 GWh | 9.8 mi |
| Reedley Community College Solar | Reedley, CA | 3.8 GWh | 5 mi |
| Visalia - (CA) | Visalia, CA | 3.2 GWh | 16 mi |