Pinyon Pine II
5008 Camelot Blvd, Mojave, CA 93501Plant Summary Information
Pinyon Pine II is ranked #33 out of 108 wind farms in California in terms of total annual net electricity generation.
Pinyon Pine II generated 26.6 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Pinyon Pine II |
|---|---|
| Utility Name | Pinyon Pines Wind II, LLC |
| Location | Kern County, CA |
| Initial Operation Date | November 2012 |
| Last Update | Dec 2025 |
| Annual Generation | 204.3 GWh |
| Annual Consumption | 730.5 k MMBtu |
| Ranked #2,510 out of 13,081 Power Plants Nationwide | |
| Ranked #744 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #257 out of 1,606 California Power Plants | |
| Ranked #33 out of 108 California Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
MidAmerican Renewables LLC (2013 to 2014) Pinyon Pines Wind II, LLC (2015 to 2025) |
Map of Pinyon Pine II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pinyon Pine II.
Monthly Net Generation for Pinyon Pine II
Monthly Plant Fuel Consumption for Pinyon Pine II
Pinyon Pine II Details
| Summary Information | |
|---|---|
| Plant Name | Pinyon Pine II (57837) |
| Plant Address | 5008 Camelot Blvd, Mojave, CA 93501 |
| Utility | Pinyon Pines Wind II, LLC (59869) |
| Latitude, Longitude | 35.02676, -118.22333 |
| Generation Dates on File | Dec 2012 to Dec 2025 |
| Initial Operation Date | November 2012 |
| Annual Generation | 204.3 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 12-52.000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator AW09 Details Operating November 2012
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 132 MW |
| Summer Capacity | 132 MW |
| Winter Capacity | 132 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2012 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 44 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 44 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V90-3.0 |
| Design Wind Speed | 18.6 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262.5 |
Pinyon Pine II Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #734 | Blue Canyon Windpower VI LLC | Carnegie, OK | 212.3 GWh |
| #735 | Laredo Ridge Wind LLC | Petersburg, NE | 211.6 GWh |
| #736 | Sky River Wind Energy Center | Tehachapi, CA | 211.5 GWh |
| #737 | Hog Creek Wind Project | Ada, OH | 211.1 GWh |
| #738 | Bliss (NY) | Bliss, NY | 206.6 GWh |
| #739 | NaturEner Glacier Wind Energy 2 | Ethridge, MT | 205.6 GWh |
| #740 | NaturEner Glacier Wind Energy 1 | Ethridge, MT | 205.5 GWh |
| #741 | Cohocton Wind Project | Cohocton, NY | 205.5 GWh |
| #742 | Silver Star I Wind Power Project | Dublin, TX | 204.9 GWh |
| #743 | Independence Wind Farm | Manchester, IA | 204.7 GWh |
| #745 | Flat Water Wind Farm LLC | Du Bois, NE | 203.9 GWh |
| #746 | Star Point Wind Project LLC | Wasco, OR | 201.3 GWh |
| #747 | North Allegheny Windpower Project | Lilly, PA | 201.3 GWh |
| #748 | Coachella Hills Wind | Palm Springs, CA | 201.2 GWh |
| #749 | Wilton Wind II LLC | Wilton, ND | 201.1 GWh |
| #750 | Chateaugay | Chateaugay, NY | 200.8 GWh |
| #751 | Bluegrass Ridge | King City, MO | 199.7 GWh |
| #752 | Arlington Wind Power Project | Arlington, OR | 199.4 GWh |
| #753 | Crescent Ridge | Tiskilwa, IL | 199.2 GWh |
| #754 | Harvest 2 | Elkton, MI | 199.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pinyon Pine II.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alta Wind Energy Center IV | Mojave, CA | 167.5 GWh | 1.6 mi |
| Alta Wind Energy Center V | Mojave, CA | 253.7 GWh | 1.6 mi |
| Alta Wind VIII | Mojave, CA | 219.2 GWh | 0.6 mi |
| Alta Wind X | Mojave, CA | 361.1 GWh | 2.6 mi |
| Brookfield Tehachapi 1 | Mojave, CA | 164.5 GWh | 1.6 mi |
| Difwind Farms Ltd VI | Mojave, CA | 12.6 GWh | 3.4 mi |
| Mojave 16/17/18 | Mojave, CA | 66.3 GWh | 2.6 mi |
| Mojave 3/4/5 | Mojave, CA | 125.0 GWh | 2.5 mi |
| Oak Creek Energy Systems I | Mojave, CA | 57.3 GWh | 3.2 mi |
| Pinyon Pine I | Mojave, CA | 283.1 GWh | 1.3 mi |
| RE Camelot LLC | Mojave, CA | 121.0 GWh | 2.1 mi |
| RE Columbia 3 LLC | Mojave, CA | 23.1 GWh | 3.4 mi |
| RE Columbia Two, LLC | Mojave, CA | 41.5 GWh | 2.1 mi |
| RE Rio Grande Solar LLC | Mojave, CA | 10.3 GWh | 3.6 mi |
| Rising Tree Wind Farm | Mojave, CA | 250.4 GWh | 3.5 mi |
| Rising Tree Wind Farm III | Mojave, CA | 260.1 GWh | 2.6 mi |
| SEPV Mojave West | Mojave, CA | 52.7 GWh | 3.4 mi |
| TPC Windfarms LLC | Mojave, CA | 42.1 GWh | 2.5 mi |
| Voyager Wind I | Mojave, CA | 343.4 GWh | 3.6 mi |
| Voyager Wind III | Mojave, CA | 118.5 GWh | 3.3 mi |