Imperial Valley Solar Company 1 LLC
440 East Beal Road, Niland, CA 92257Plant Summary Information
Imperial Valley Solar Company 1 LLC is ranked #224 out of 816 solar farms in California in terms of total annual net electricity generation.
Imperial Valley Solar Company 1 LLC generated 8.1 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Imperial Valley Solar Company 1 LLC |
---|---|
Utility Name | Imperial Irrigation District |
Location | Imperial County, CA |
Initial Operation Date | June 2012 |
Last Update | Dec 2024 |
Annual Generation | 35.1 GWh |
Annual Consumption | 126.9 k MMBtu |
Ranked #4,445 out of 12,288 Power Plants Nationwide | |
Ranked #1,078 out of 6,174 Solar Power Plants Nationwide | |
Ranked #573 out of 1,564 California Power Plants | |
Ranked #224 out of 816 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Imperial Valley Solar Company 1 LLC (2013 to 2017) Imperial Irrigation District (2018 to 2024) |
Map of Imperial Valley Solar Company 1 LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Imperial Valley Solar Company 1 LLC.
Monthly Net Generation for Imperial Valley Solar Company 1 LLC
Imperial Valley Solar Company 1 LLC Details
Summary Information | |
---|---|
Plant Name | Imperial Valley Solar Company 1 LLC (58062) |
Plant Address | 440 East Beal Road, Niland, CA 92257 |
Utility | Imperial Irrigation District (9216) |
Latitude, Longitude | 33.24583, -115.49667 |
Generation Dates on File | Jun 2012 to Dec 2024 |
Initial Operation Date | June 2012 |
Annual Generation | 35.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 12-226-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Imperial Irrigation District (IID) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Imperial Irrigation District (9216) CA |
Grid Voltage | 13.20 kV |
Energy Storage | No |
Generator 0001 Details Operating June 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 23 MW |
Summer Capacity | 23 MW |
Winter Capacity | 23 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 28.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Imperial Valley Solar Company 1 LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1068 | Sauk Solar Park | Union City, MI | 35.9 GWh |
#1069 | Sunlight Road Solar | Franklinton, LA | 35.8 GWh |
#1070 | RE Kansas Solar, LLC | Lemoore, CA | 35.7 GWh |
#1071 | RE Old River One, LLC | Bakersfield, CA | 35.6 GWh |
#1072 | Pinson Solar Farm | Woodruff, SC | 35.5 GWh |
#1073 | Holstein Plant | Maxton, NC | 35.4 GWh |
#1074 | Blue Bird Solar, LLC | Warrenton, MO | 35.3 GWh |
#1075 | Fort Stewart Solar Facility | Fort Stewart, GA | 35.2 GWh |
#1076 | Altona Solar, LLC | Centralia, MO | 35.2 GWh |
#1077 | Alamosa Solar | Mosca, CO | 35.1 GWh |
#1079 | Demille Solar Farm | Lapeer, MI | 35.0 GWh |
#1080 | Hyder II Hybrid | Hyder, AZ | 32.5 GWh |
#1081 | Paloma Solar Hybrid | Gila Bend, AZ | 31.9 GWh |
#1082 | Corcoran Solar | Corcoran, CA | 34.6 GWh |
#1083 | Cottontail Solar 8 | West Manchester Towns, PA | 34.5 GWh |
#1084 | SR Platte Solar Farm | Platteville, CO | 34.5 GWh |
#1085 | Saddle Mountain Solar I | Tonopah, AZ | 34.5 GWh |
#1086 | Apple Data Center - PV2 | Conover, NC | 34.5 GWh |
#1087 | Nutmeg Solar | Enfield, CT | 34.4 GWh |
#1088 | Montgomery Solar LLC | Biscoe, NC | 34.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Imperial Valley Solar Company 1 LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Calipatria Solar Farm | Calipatria, CA | 38.3 GWh | 5.9 mi |
Calipatria State Prison | Calipatria, CA | 16.5 GWh | 5.8 mi |
CE Leathers | Calipatria, CA | 70.6 GWh | 6.1 mi |
Citizens Imperial Solar | Calipatria, CA | 47.9 GWh | 5.2 mi |
Del Ranch Company | Calipatria, CA | 326.3 GWh | 8.9 mi |
Elmore Company | Calipatria, CA | 104.3 GWh | 7.8 mi |
Imperial Valley Solar Co (IVSC) 2, LLC | Niland, CA | 46.2 GWh | 0.4 mi |
John L. Featherstone Plant | Calipatria, CA | 437.4 GWh | 5.3 mi |
Midway Solar Farm 1 | Calipatria, CA | 111.2 GWh | 6.5 mi |
Midway Solar Farm II | Calipatria, CA | 51.4 GWh | 6.1 mi |
Midway Solar Farm III | Calipatria, CA | 50.9 GWh | 6.9 mi |
Niland Gas Turbine Plant | Niland, CA | 55.7 GWh | 0.7 mi |
Salton Sea Power Gen Co - Unit 1 | Calipatria, CA | 78.4 GWh | 10.6 mi |
Salton Sea Power Gen Co - Unit 2 | Calipatria, CA | 107.0 GWh | 10.5 mi |
Salton Sea Power Gen Co - Unit 3 | Calipatria, CA | 314.9 GWh | 10.2 mi |
Salton Sea Power Gen Co - Unit 4 | Calipatria, CA | 179.8 GWh | 10.2 mi |
Salton Sea Power LLC - Unit 5 | Calipatria, CA | 290.3 GWh | 10.4 mi |
Solar Gen 2 Solar Facility | Calipatria, CA | 364.2 GWh | 11.6 mi |
Vulcan-BN Geothermal Power Company | Calipatria, CA | 227.2 GWh | 9 mi |
Wister Solar | Niland, CA | 28.2 GWh | 1.7 mi |