Aerojet II
Aerojet Rd & White Rock Rd, Rancho Cordova, CA 95670Plant Summary Information
Aerojet II is ranked #452 out of 763 solar farms in California in terms of total annual net electricity generation.
Aerojet II generated 1.0 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Aerojet II |
---|---|
Utility Name | Altus Power America Management, LLC |
Location | Sacramento County, CA |
Initial Operation Date | June 2010 |
Last Update | Dec 2022 |
Annual Generation | 4.0 GWh |
Annual Consumption | 14.5 k MMBtu |
Ranked #8,097 out of 11,455 Power Plants Nationwide | |
Ranked #3,021 out of 5,173 Solar Power Plants Nationwide | |
Ranked #1,139 out of 1,543 California Power Plants | |
Ranked #452 out of 763 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Solar Power Inc. (2013 to 2016) Altus Power America Management, LLC (2017 to 2022) |
Map of Aerojet II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Aerojet II.
Monthly Net Generation for Aerojet II
Aerojet II Details
Summary Information | |
---|---|
Plant Name | Aerojet II (57698) |
Plant Address | Aerojet Rd & White Rock Rd Rancho Cordova, CA 95670 |
Utility | Altus Power America Management, LLC (60281) |
Latitude, Longitude | 38.6086, -121.1703 |
Generation Dates on File | Jan 2011 to Dec 2022 |
Initial Operation Date | June 2010 |
Annual Generation | 4.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Balancing Authority of Northern California (BANC) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Sacramento Municipal Util Dist (16534) CA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 1 Details Operating June 2010
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2.2 MW |
Summer Capacity | 2.2 MW |
Winter Capacity | 2.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2010 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 225 |
Tilt Angle | 45 |
DC Net Capacity | 2.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Aerojet II Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3011 | Captain Solar, LLC | Mt. Morris, MI | 4.0 GWh |
#3012 | Grand Ronde Solar | Grand Ronde, OR | 4.0 GWh |
#3013 | Interchange Solar, LLC | Mt. Morris, MI | 4.0 GWh |
#3014 | GSPP Raynham TMLP, LLC CSG | Raynham, MA | 4.0 GWh |
#3015 | Unity Solar | Unity, ME | 4.0 GWh |
#3016 | O'Neill Creek Solar | Gaston, OR | 4.0 GWh |
#3017 | Cortland | Cortland, IL | 4.0 GWh |
#3018 | May Shannon Solar, LLC | Clio, MI | 4.0 GWh |
#3019 | Victor Mesa Linda B2 | Victorville, CA | 4.0 GWh |
#3020 | Vallecitos Water District | San Marcos, CA | 4.0 GWh |
#3022 | Victor Mesa Linda C2 | Victorville, CA | 4.0 GWh |
#3023 | Atkinson Solar II | Beulaville, NC | 4.0 GWh |
#3024 | Berkley East Solar LLC | Berkley, MA | 4.0 GWh |
#3025 | Rockford CSG | Rockford, IL | 4.0 GWh |
#3026 | City of Bowie | Mitchellville, MD | 4.0 GWh |
#3027 | Charlemont A | Charlemont, MA | 4.0 GWh |
#3028 | Duke Building 98 | Indianapolis, IN | 4.0 GWh |
#3029 | Victor Mesa Linda D2 | Victorville, CA | 4.0 GWh |
#3030 | Waterford Holdco CSG | Waterford, MN | 4.0 GWh |
#3031 | Cedarville Road | Lena, IL | 4.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Aerojet II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aerojet I | Rancho Cordova, CA | 6.2 GWh | 0.5 mi |
Blue Shld Of Cal- El Dorado Hlls Mtr B | El Dorado Hills, CA | 3.3 GWh | 5.9 mi |
Broadridge Cogen | El Dorado Hills, CA | 15.3 GWh | 6.2 mi |
Deer Creek 2 | Shingle Springs, CA | 3.2 GWh | 10.1 mi |
Dept of General Services -FTB | Sacramento, CA | 5.6 GWh | 9.8 mi |
El Dorado Solar, LLC | El Dorado Hills, CA | 4.6 GWh | 6.3 mi |
FAA NorCal TRACON | Mather AFB, CA | 1.7 GWh | 5.8 mi |
Folsom | Folsom, CA | 884.1 GWh | 6.8 mi |
Folsom SP and CSP Sacramento | Represa, CA | 2.7 GWh | 5.4 mi |
Intel Folsom | Folsom, CA | 1.6 GWh | 2.5 mi |
Intel Folsom Phase 2 | Folsom, CA | 1.6 GWh | 2.4 mi |
Intel Folsom Phase 3 | Folsom, CA | 9.4 GWh | 2.6 mi |
Kiefer Landfill | Sloughhouse, CA | 69.7 GWh | 6.7 mi |
McClellan (CA) | Sacramento, CA | 4.0 GWh | 12.4 mi |
Nimbus | Folsom, CA | 47.4 GWh | 3.3 mi |
Rancho Cordova Medical Offices | Rancho Cordova, CA | 2.4 GWh | 6.9 mi |
RE Dillard 1 LLC | Sloughhouse, CA | 6.8 GWh | 9.7 mi |
RE Dillard 2 LLC | Sloughhouse, CA | 7.0 GWh | 9.9 mi |
RE Dillard 3 LLC | Sloughhouse, CA | 7.0 GWh | 10.1 mi |
US GSA - Sacramento | Sacramento, CA | 2.4 GWh | 12.3 mi |