L-8 Solar Project
8871 E Avenue L-8, Palmdale, CA 93550Plant Summary Information
L-8 Solar Project is ranked #640 out of 849 solar farms in California in terms of total annual net electricity generation.
L-8 Solar Project generated 686.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | L-8 Solar Project |
|---|---|
| Utility Name | L-8 Solar Project LLC |
| Location | Los Angeles County, CA |
| Initial Operation Date | May 2012 |
| Last Update | Dec 2024 |
| Annual Generation | 2.4 GWh |
| Annual Consumption | 8.5 k MMBtu |
| Ranked #10,040 out of 12,539 Power Plants Nationwide | |
| Ranked #4,868 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #1,355 out of 1,600 California Power Plants | |
| Ranked #640 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of L-8 Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for L-8 Solar Project.
Monthly Net Generation for L-8 Solar Project
L-8 Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | L-8 Solar Project (57836) |
| Plant Address | 8871 E Avenue L-8, Palmdale, CA 93550 |
| Utility | L-8 Solar Project LLC (57159) |
| Latitude, Longitude | 34.65435, -117.9731 |
| Generation Dates on File | May 2012 to Dec 2024 |
| Initial Operation Date | May 2012 |
| Annual Generation | 2.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 12-72-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator TSM Details Operating May 2012
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Summer Capacity | 1.3 MW |
| Winter Capacity | 1.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2012 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 30 |
| DC Net Capacity | 1.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
L-8 Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #4858 | NY- CSG- Johnstown 2 | New York, NY | 2.4 GWh |
| #4859 | Maize | Colwich, KS | 2.4 GWh |
| #4860 | MA-Dighton-A | Dighton, MA | 2.4 GWh |
| #4861 | Bryant Road Solar | Spartanburg, SC | 2.4 GWh |
| #4862 | EAFB - South Base | Edwards Air Force Bas, CA | 2.4 GWh |
| #4863 | Pierce College | Wilmington, CA | 2.4 GWh |
| #4864 | 301 Chestnut Solar NG | East Longmeadow, MA | 2.4 GWh |
| #4865 | Rutgers Busch Livingston Lot B & C | Piscataway, NJ | 2.4 GWh |
| #4866 | Chesapeake College | Wye Mills, MD | 2.4 GWh |
| #4867 | Smith & Wesson at Springfield MA PV | Springfield, MA | 2.4 GWh |
| #4869 | Lakeland Electric Co. (FL)-Airport 1 | Lakeland, FL | 2.4 GWh |
| #4870 | Gilead Oceanside Solar Project | Oceanside, CA | 2.4 GWh |
| #4871 | St. Paul-Howard Greeley | St. Paul, NE | 2.4 GWh |
| #4872 | DeGraff Butler Electric | Burns, KS | 2.4 GWh |
| #4873 | Mound | Mound Valley, KS | 2.4 GWh |
| #4874 | Oskaloosa | Oskaloosa, KS | 2.4 GWh |
| #4875 | Munich Re Plaza | Princeton, NJ | 2.4 GWh |
| #4876 | Kearsarge Johnstown 1 CSG | Johnstown, NY | 2.4 GWh |
| #4877 | TJX Las Vegas | North Las Vegas, NV | 2.4 GWh |
| #4878 | Schull CSG | Mapleton, MN | 2.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding L-8 Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arrache 4006 | Palmdale, CA | 2.3 GWh | 4.4 mi |
| Arrache 4013 | Palmdale, CA | 3.3 GWh | 4.5 mi |
| Arrache 8083 | Palmdale, CA | 2.8 GWh | 5 mi |
| Green Beanworks B PV | Lancaster, CA | 7.1 GWh | 2.5 mi |
| Green Beanworks C PV | Palmdale, CA | 5.1 GWh | 4.6 mi |
| Green Beanworks D PV | Palmdale, CA | 4.1 GWh | 6.2 mi |
| Heliocentric | Palmdale, CA | 2.0 GWh | 0.1 mi |
| Lancaster | Lancaster, CA | 8.1 GWh | 6.2 mi |
| Lancaster Baptist Church | Lancaster, CA | 1.4 GWh | 5.7 mi |
| Lancaster Little Rock | Landers, CA | 3.0 GWh | 4.4 mi |
| Little Rock Pham Solar | Palmdale, CA | 7.6 GWh | 4 mi |
| Ma | Lancaster, CA | 2.5 GWh | 5.8 mi |
| Morgan Lancaster 1 | Lancaster, CA | 796.0 MWh | 6.3 mi |
| One Ten Partners PV | Palmdale, CA | 6.1 GWh | 3.4 mi |
| SEPV 1 | Palmdale, CA | 2.7 GWh | 3.1 mi |
| SEPV 18 | Palmdale, CA | 5.0 GWh | 3.6 mi |
| SEPV Palmdale East | Palmdale, CA | 25.0 GWh | 3.5 mi |
| Solar Oasis LLC | Palmdale, CA | 51.3 GWh | 5.9 mi |
| US-TOPCO (Soccer Center) | Lancaster, CA | 7.0 GWh | 6.2 mi |
| Vinam | Lancaster, CA | 3.3 GWh | 5.1 mi |