Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Kingsburg Solar | Altus Power America Management, LLC | Kingsburg, CA | California Independent System Operator (CISO) | 6.3 GWh | Nov 2013 | Dec 2025 | Solar |
| Exeter Solar | Altus Power America Management, LLC | Exeter, CA | California Independent System Operator (CISO) | 6.0 GWh | Jan 2014 | Dec 2025 | Solar |
| Ivanhoe Solar | Altus Power America Management, LLC | Visalia, CA | California Independent System Operator (CISO) | 5.3 GWh | Dec 2013 | Dec 2025 | Solar |
| Lindsay Solar | Altus Power America Management, LLC | Lindsay, CA | California Independent System Operator (CISO) | 6.8 GWh | Dec 2013 | Dec 2025 | Solar |
| Porterville Solar | Altus Power America Management, LLC | Porterville, CA | California Independent System Operator (CISO) | 6.0 GWh | Dec 2013 | Dec 2025 | Solar |
| G2 Energy Hay Rd | G2 Energy LLC | Vacaville, CA | California Independent System Operator (CISO) | 12.8 GWh | May 2013 | Dec 2025 | Landfill Gas |
| Radiance Solar 4 | Altus Power America Management, LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2013 | Dec 2025 | Solar |
| Radiance Solar 5 | Altus Power America Management, LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.9 GWh | Jun 2013 | Dec 2025 | Solar |
| Atwell Island | SPS Atwell Island LLC | Alpaugh, CA | California Independent System Operator (CISO) | 33.9 GWh | Feb 2013 | Dec 2025 | Solar |
| Gridley Main | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 1.4 GWh | Feb 2013 | Dec 2025 | Solar |
| Gridley Main Two | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 3.6 GWh | Mar 2013 | Dec 2025 | Solar |
| White River Solar | RWE Clean Energy | Alpaugh, CA | California Independent System Operator (CISO) | 36.1 GWh | Jun 2013 | Dec 2025 | Solar |
| Corcoran Solar | RWE Clean Energy | Corcoran, CA | California Independent System Operator (CISO) | 22.1 GWh | Jul 2013 | Dec 2025 | Solar |
| Oakley Solar Project | Oakley Solar Project LLC | Oakley, CA | California Independent System Operator (CISO) | 2.1 GWh | May 2013 | Dec 2025 | Solar |
| Cold Canyon 1 | Toro Energy of California SLO | San Luis Obispo, CA | California Independent System Operator (CISO) | 10.6 GWh | Jun 2013 | Dec 2025 | Landfill Gas |
| Alta Wind X | Alta Wind X, LLC | Mojave, CA | California Independent System Operator (CISO) | 361.1 GWh | Dec 2013 | Dec 2025 | Wind |
| Alta Wind XI | Alta Wind XI, LLC | Mojave, CA | California Independent System Operator (CISO) | 250.6 GWh | Dec 2013 | Dec 2025 | Wind |
| Ameresco Johnson Canyon | Ameresco Johnson Canyon LLC | Gonzales, CA | California Independent System Operator (CISO) | 10.0 GWh | Apr 2013 | Dec 2025 | Landfill Gas |
| Heber Solar | Axium US Solar Holdings LLC | Heber, CA | Imperial Irrigation District (IID) | 24.1 GWh | Apr 2014 | Dec 2025 | Solar |
| Lone Valley Solar Park I LLC | Lone Valley Solar Park I LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 24.2 GWh | Nov 2014 | Dec 2025 | Solar |
| Victor Dry Farm Ranch A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.7 GWh | May 2015 | Dec 2025 | Solar |
| Victor Dry Farm Ranch B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.9 GWh | May 2015 | Dec 2025 | Solar |
| CSU Northridge Plant | California State University, Northridge | Northridge, CA | Los Angeles Department of Water and Power (LDWP) | 1.6 GWh | Nov 2001 | Dec 2025 | Solar |
| Centinela Solar Energy | Arevon Energy, Inc. | Calexico, CA | California Independent System Operator (CISO) | 448.6 GWh | Jun 2013 | Dec 2025 | Solar |
| Glass House Camarillo Cultivation | Glass House Camarillo Cultivation | Camarillo, CA | California Independent System Operator (CISO) | 64.0 GWh | Jul 2012 | Dec 2025 | Natural Gas |
| Ameresco Vasco Road | Ameresco Vasco Road, LLC | Livermore, CA | California Independent System Operator (CISO) | 32.7 GWh | Feb 2013 | Dec 2025 | Landfill Gas |
| Ameresco San Joaquin | Ameresco San Joaquin, LLC | Linden, CA | California Independent System Operator (CISO) | 24.8 GWh | Mar 2014 | Dec 2025 | Landfill Gas |
| Ameresco Forward | Ameresco Forward, LLC | Manteca, CA | California Independent System Operator (CISO) | 31.6 GWh | Jan 2014 | Dec 2025 | Landfill Gas |
| Arrache 4006 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.3 GWh | Jul 2013 | Dec 2025 | Solar |
| Arrache 4013 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 4.2 GWh | Jul 2013 | Dec 2025 | Solar |
| Arrache 8083 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 3.0 GWh | Aug 2013 | Dec 2025 | Solar |
| Nunn | CD US Solar MT 2 LLC | Apple Valley, CA | California Independent System Operator (CISO) | 1.4 GWh | Jun 2013 | Dec 2025 | Solar |
| Rutan | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 3.0 GWh | Dec 2013 | Dec 2025 | Solar |
| Vinam | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.0 GWh | Jun 2013 | Dec 2025 | Solar |
| Ma | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 1.8 GWh | Sep 2013 | Dec 2025 | Solar |
| Horn | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.7 GWh | Sep 2013 | Dec 2025 | Solar |
| Watts 3115 | CD US Solar MT 2 LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.8 GWh | Jul 2013 | Dec 2025 | Solar |
| McCoy Solar Energy Project Hybrid | McCoy Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 638.7 GWh | Jul 2015 | Dec 2025 | Solar |
| Campo Verde Solar | Southern Power Co | El Centro, CA | California Independent System Operator (CISO) | 292.7 GWh | Sep 2013 | Dec 2025 | Solar |
| RE Rosamond One LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 51.2 GWh | Dec 2013 | Dec 2025 | Solar |
| RE Rosamond Two LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 48.6 GWh | Dec 2013 | Dec 2025 | Solar |
| RE Rio Grande Solar LLC | MN8 Energy LLC | Mojave, CA | California Independent System Operator (CISO) | 10.3 GWh | Nov 2013 | Dec 2025 | Solar |
| RE Columbia 3 LLC | MN8 Energy LLC | Mojave, CA | California Independent System Operator (CISO) | 23.1 GWh | Dec 2013 | Dec 2025 | Solar |
| Chuckawalla Solar | Altus Power America Management, LLC | Blythe, CA | California Independent System Operator (CISO) | 7.3 GWh | May 2012 | Dec 2025 | Solar |
| Vintner Solar | Ecos Energy LLC | Templeton, CA | California Independent System Operator (CISO) | 4.0 GWh | Mar 2014 | Dec 2025 | Solar |
| Kettleman Solar Project | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 2.5 GWh | Mar 2014 | Dec 2025 | Solar |
| Ironwood Solar LLC | Altus Power America Management, LLC | Blythe, CA | California Independent System Operator (CISO) | 7.3 GWh | Mar 2012 | Dec 2025 | Solar |
| Desert Hot Springs Solar | RWE Clean Energy | Desert Hot Springs, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2013 | Dec 2025 | Solar |
| Madera Community Hospital | CleanCapital Holdings | Madera, CA | California Independent System Operator (CISO) | 1.7 GWh | Sep 2011 | Dec 2025 | Solar |
| Central San | REC CSD, LLC | Martinez, CA | California Independent System Operator (CISO) | 3.0 GWh | Dec 2024 | Dec 2025 | Solar |
| Google Bayhill Solar PV and Microgrid | Google, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 651.0 MWh | Mar 2024 | Dec 2025 | Solar |
| Tracy 18 - SLCVA418 | Prologis Logistics Services Incorporated | Tracy, CA | California Independent System Operator (CISO) | 182.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Chatsworth Industrial Center 1-SLLAX601 | Prologis Logistics Services Incorporated | Chatsworth, CA | California Independent System Operator (CISO) | 132.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Superior Almond Hulling | Renewable Solar, Inc | Cantua Creek, CA | California Independent System Operator (CISO) | 472.0 MWh | Aug 2024 | Dec 2025 | Solar |
| Oaks HOA | Onyx Asset Services Group | Ione, CA | California Independent System Operator (CISO) | 1.7 GWh | Mar 2025 | Dec 2025 | Solar |
| Avalon Dairy | Renewable Solar, Inc | Wasco, CA | California Independent System Operator (CISO) | 792.0 MWh | Aug 2024 | Dec 2025 | Solar |
| Sutter Home Winery TCC | REC SHW, LLC | Paso Robles, CA | California Independent System Operator (CISO) | 1.7 GWh | Apr 2024 | Dec 2025 | Solar |
| Sutter Home Winery GIR | Westbound Solar 3, LLC | American Canyon, CA | California Independent System Operator (CISO) | 1.9 GWh | Jul 2023 | Dec 2025 | Solar |
| Kern Del Oro | REC KDO, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2024 | Dec 2025 | Solar |
| Visalia - (CA) | CleanCapital Holdings | Visalia, CA | California Independent System Operator (CISO) | 3.2 GWh | May 2025 | Dec 2025 | Solar |
| North Kern 3 | Madison Energy Investments LLC | Bakersfield, CA | California Independent System Operator (CISO) | 13.6 GWh | Nov 2023 | Dec 2025 | Solar |
| Community Solar Utica 1, LLC | AETS OpCo Holdings LLC | Kettleman, CA | California Independent System Operator (CISO) | 2.3 GWh | Feb 2025 | Dec 2025 | Solar |
| Tipton 2 - (CA) | CleanCapital Holdings | Tipton, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2024 | Dec 2025 | Solar |
| Blue Moon Farms | Bravo REC Management LLC | Tipton, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2024 | Dec 2025 | Solar |
| Pivot Energy PPA 22 | Pivot Energy | Visalia, CA | California Independent System Operator (CISO) | 2.2 GWh | Sep 2024 | Dec 2025 | Solar |
| JD Foods - JD Foods | Barrier Solar Inc | Fresno, CA | California Independent System Operator (CISO) | 2.5 GWh | Sep 2020 | Dec 2025 | Solar |
| Open Sky Dairy | Renewable Solar, Inc | Riverdale, CA | California Independent System Operator (CISO) | 418.8 MWh | Jun 2024 | Dec 2025 | Solar |
| RB Inyokern Solar WDAT 1203 (CSG) | Dimension Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 58.3 GWh | Nov 2024 | Dec 2025 | Solar |
| GreenStruxure BBU004, LLC | ClearGen LLC | Montebello, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2023 | Dec 2025 | Solar |
| Kiefer Landfill Generating Phase II | NextEra Renewable Fuels, LLC | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 30.2 GWh | Mar 2012 | Dec 2025 | Landfill Gas |
| Lakeside Pipeline | Maas Energy Works | Hanford, CA | California Independent System Operator (CISO) | 8.3 GWh | Jun 2023 | Dec 2025 | Solar |
| Pacific Aviation | Onyx Asset Services Group | Van Nuys, CA | Los Angeles Department of Water and Power (LDWP) | 2.9 GWh | Mar 2025 | Dec 2025 | Solar |
| Legoland CA Phase I | Onyx Asset Services Group | Carlsbad, CA | California Independent System Operator (CISO) | 1.4 GWh | May 2025 | Dec 2025 | Solar |
| Amazon - SAN5 | Onyx Asset Services Group | San Diego, CA | California Independent System Operator (CISO) | 530.0 MWh | Oct 2025 | Dec 2025 | Solar |
| Las Positas College | Chabot Las Positas Community College District | Livermore, CA | California Independent System Operator (CISO) | 1.7 GWh | Jul 2018 | Dec 2025 | Solar |
| Palm Springs DAC PV | Palm Springs USD | Palm Springs, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2021 | Dec 2025 | Solar |
| CFF Rice Mill Solar Plant | California Family Foods | Arbuckle, CA | Western Area Power Administration - Desert Southwest Region (WALC) | 145.0 MWh | Nov 2025 | Dec 2025 | Solar |
| CA- US Foods- Sacramento (McClellan) | USF McClellan, LLC | McClellan, CA | Balancing Authority of Northern California (BANC) | 1.4 GWh | Mar 2025 | Dec 2025 | Solar |
| PAC Aviation Solar | PAC Aviation | Van Nuys, CA | Los Angeles Department of Water and Power (LDWP) | 3.0 GWh | Nov 2024 | Dec 2025 | Solar |
| KP Ontario Vineyard Solar | KP Ontario Vineyard O.P. Surgicenter B Solar LLC | Ontario, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2024 | Dec 2025 | Solar |
| Amazon Visalia (FAT2) | Madison Energy Investments LLC | Visalia, CA | California Independent System Operator (CISO) | 3.7 GWh | Feb 2023 | Dec 2025 | Solar |
| Sutter Home Winery Westside | REC SHW, LLC | Lodi, CA | California Independent System Operator (CISO) | 295.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Thermo Fisher Pleasanton | TotalEnergies Renewables USA LLC | Pleasanton, CA | California Independent System Operator (CISO) | 1.5 GWh | Jun 2025 | Dec 2025 | Solar |
| KP South Sacramento Hospital Solar | KP South Sacramento Hospital Solar, LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.6 GWh | Jul 2023 | Dec 2025 | Solar |
| Sun Pacific - Lerdo | JKB Energy | Shafter, CA | California Independent System Operator (CISO) | 6.0 GWh | Sep 2020 | Dec 2025 | Solar |
| AVI Bakersfield | Anthony Vineyards, Inc. | Bakersfield, CA | California Independent System Operator (CISO) | 2.8 GWh | May 2022 | Dec 2025 | Solar |
| Sutter Santa Rosa Solar | Sutter Santa Rosa Solar LLC | Santa Rosa, CA | California Independent System Operator (CISO) | 2.1 GWh | Aug 2019 | Dec 2025 | Solar |
| Open Sky Ranch Inc | Bravo REC Management LLC | Riverdale, CA | California Independent System Operator (CISO) | 4.0 GWh | Jun 2024 | Dec 2025 | Solar |
| Wonderful Orchards - West Valley | Wonderful Renewable Energy, LLC. | Blackwells Corner, CA | California Independent System Operator (CISO) | 8.0 GWh | Sep 2020 | Dec 2025 | Solar |
| Harris Farms Solar Facility | Harris Farms Inc | Coalinga, CA | California Independent System Operator (CISO) | 3.2 GWh | Feb 2024 | Dec 2025 | Solar |
| Paso Robles - Municipal Airport | Onyx Asset Services Group | Paso Robles, CA | California Independent System Operator (CISO) | 7.6 GWh | Dec 2023 | Dec 2025 | Solar |
| TWC | Bravo REC Management LLC | Tulare, CA | California Independent System Operator (CISO) | 2.2 GWh | Jul 2024 | Dec 2025 | Solar |
| Foster Clean Power B | Foster Clean Power B LLC | Arcata, CA | California Independent System Operator (CISO) | 901.0 MWh | Aug 2025 | Dec 2025 | Solar |
| Delta Electronics Fremont | Delta Electronics (Americas) Ltd | Fremont, CA | California Independent System Operator (CISO) | 701.0 MWh | Mar 2016 | Dec 2025 | Solar |
| Dixie Creek Dairy Solar | Bravo REC Management LLC | Hanford, CA | California Independent System Operator (CISO) | 5.8 GWh | Jun 2024 | Dec 2025 | Solar |
| City of Atwater NEM | SoCore Energy LLC | Atwater, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2024 | Dec 2025 | Solar |
| CA OXNARD 2600 Sakioka Dr | Catalyze Oxnard 2600 Sakioka Drive Microgrid, LLC | Oxnard, CA | California Independent System Operator (CISO) | 2.7 GWh | Jun 2025 | Dec 2025 | Solar |
| Kern Sunset 1886-WD | Standard Solar | Bakersfield, CA | California Independent System Operator (CISO) | 4.5 GWh | Oct 2024 | Dec 2025 | Solar |
| Terry 1818-WD | Standard Solar | Wasco, CA | California Independent System Operator (CISO) | 10.3 GWh | Nov 2024 | Dec 2025 | Solar |
| Nachtigall 1836-WD | Standard Solar | Wasco, CA | California Independent System Operator (CISO) | 11.0 GWh | Nov 2024 | Dec 2025 | Solar |
Browse Power Plants By California Counties
Figures are based on May 2026 generation numbers.| County | State Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Kern County, CA | # 1 | 317 | 34.2 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.5 TWh |
| Los Angeles County, CA | # 3 | 319 | 16.8 TWh |
| Riverside County, CA | # 4 | 162 | 14.1 TWh |
| Contra Costa County, CA | # 5 | 59 | 12.7 TWh |
| San Bernardino County, CA | # 6 | 208 | 12.0 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| Fresno County, CA | # 8 | 127 | 7.3 TWh |
| Shasta County, CA | # 9 | 46 | 7.2 TWh |
| Sacramento County, CA | # 10 | 67 | 5.6 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.3 TWh |
| Kings County, CA | # 13 | 58 | 4.0 TWh |
| Santa Clara County, CA | # 14 | 76 | 3.5 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Solano County, CA | # 16 | 41 | 3.1 TWh |
| Tuolumne County, CA | # 17 | 23 | 2.9 TWh |
| Stanislaus County, CA | # 18 | 25 | 2.7 TWh |
| Alameda County, CA | # 19 | 51 | 2.6 TWh |
| Orange County, CA | # 20 | 59 | 2.5 TWh |
| Monterey County, CA | # 21 | 29 | 2.3 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| Tulare County, CA | # 26 | 71 | 1.6 TWh |
| El Dorado County, CA | # 27 | 15 | 1.6 TWh |
| Yuba County, CA | # 28 | 5 | 1.5 TWh |
| County | State Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| San Joaquin County, CA | # 29 | 53 | 1.5 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Lake County, CA | # 32 | 10 | 896.8 GWh |
| Ventura County, CA | # 33 | 33 | 672.3 GWh |
| Amador County, CA | # 34 | 8 | 610.5 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Calaveras County, CA | # 36 | 6 | 502.3 GWh |
| Trinity County, CA | # 37 | 5 | 488.3 GWh |
| Merced County, CA | # 38 | 33 | 484.8 GWh |
| Humboldt County, CA | # 39 | 10 | 442.1 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Santa Barbara County, CA | # 41 | 18 | 300.1 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| San Benito County, CA | # 43 | 6 | 257.6 GWh |
| Nevada County, CA | # 44 | 12 | 225.0 GWh |
| Yolo County, CA | # 45 | 15 | 196.2 GWh |
| San Mateo County, CA | # 46 | 11 | 131.4 GWh |
| San Francisco County, CA | # 47 | 10 | 79.8 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.8 GWh |
| Tehama County, CA | # 50 | 7 | 52.9 GWh |
| Napa County, CA | # 51 | 11 | 51.2 GWh |
| Sierra County, CA | # 52 | 3 | 29.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Glenn County, CA | # 55 | 2 | 12.1 GWh |