Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Niland Gas Turbine Plant | Imperial Irrigation District | Niland, CA | Imperial Irrigation District (IID) | 55.7 GWh | May 2008 | Dec 2024 | Natural Gas |
| Midway Peaking LLC | CalPeak Power, LLC | Firebaugh, CA | California Independent System Operator (CISO) | 15.7 GWh | Apr 2009 | Dec 2024 | Natural Gas |
| Hatchet Ridge Wind Project | Pattern Operators LP | Burney, CA | California Independent System Operator (CISO) | 268.2 GWh | Nov 2010 | Dec 2024 | Wind |
| CalRenew-1 | CalRenew-1 LLC | Mendota, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2010 | Dec 2024 | Solar |
| Dillon Wind LLC | Avangrid Power LLC | North Palm Springs, CA | California Independent System Operator (CISO) | 142.4 GWh | Mar 2008 | Dec 2024 | Wind |
| CSU Fresno Solar Project | MMA Fresno Power LP | Fresno, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2007 | Dec 2024 | Solar |
| North Brawley Geothermal Plant | Ormat Nevada Inc | Brawley, CA | Imperial Irrigation District (IID) | 16.9 GWh | Sep 2009 | Dec 2024 | Geothermal |
| Shiloh Wind Project 2 LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 393.1 GWh | Dec 2008 | Dec 2024 | Wind |
| Ameresco Keller Canyon | AMERESCO Keller Canyon LLC | Bay Point, CA | California Independent System Operator (CISO) | 19.1 GWh | Jun 2009 | Dec 2024 | Landfill Gas |
| Ameresco Chiquita Canyon | AMERESCO Chiquita Canyon LLC | Castaic, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2010 | Dec 2024 | Landfill Gas |
| Gap Pacific Distribution Center | MN8 Energy LLC | Fresno, CA | California Independent System Operator (CISO) | 5.4 GWh | Sep 2008 | Dec 2024 | Solar |
| Orange Grove Peaking Facility | Orange Grove Energy LP | Pala, CA | California Independent System Operator (CISO) | 23.6 GWh | May 2010 | Dec 2024 | Natural Gas |
| Imperial Valley Solar, LLC | Imperial Valley Solar, LLC | Calexico, CA | California Independent System Operator (CISO) | 443.5 GWh | Oct 2013 | Dec 2024 | Solar |
| Solar Blythe LLC | NRG Solar Blythe | Blythe, CA | California Independent System Operator (CISO) | 41.8 GWh | Nov 2009 | Dec 2024 | Solar |
| El Cajon Energy Center | Wellhead Services, Inc | El Cajon, CA | California Independent System Operator (CISO) | 9.0 GWh | May 2010 | Dec 2024 | Natural Gas |
| SunEdison Walgreens Moreno Valley | SunE WG113 Moreno Valley LLC | Moreno Valley, CA | California Independent System Operator (CISO) | 900.0 MWh | Aug 2007 | Dec 2024 | Solar |
| Mariani Packing Vacaville Solar | SunE U6 Holdings LLC | Vacaville, CA | California Independent System Operator (CISO) | 1.3 GWh | Oct 2008 | Dec 2024 | Solar |
| Walgreens Woodland Distribution Center | SunE WG45 Woodland LLC | Woodland, CA | California Independent System Operator (CISO) | 908.0 MWh | Jul 2007 | Dec 2024 | Solar |
| SunEdison Ironwood State Prison | SunE CPA CDC2 LLC | Blythe, CA | California Independent System Operator (CISO) | 996.0 MWh | Apr 2008 | Dec 2024 | Solar |
| SunEdison Procter & Gamble Oxnard | SunE U6 Holdings LLC | Oxnard, CA | California Independent System Operator (CISO) | 1.6 GWh | Sep 2009 | Dec 2024 | Solar |
| Kohls San Bernardino Solar Facility | SunE WF3 KHL A Holdings, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 944.0 MWh | Oct 2007 | Dec 2024 | Solar |
| SunEdison Anheuser Busch Fairfield | SunE M5 Holdings LLC | Fairfield, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2008 | Dec 2024 | Solar |
| Chuckawalla Valley State Prison | SunE CPA CDC1 LLC | Blythe, CA | California Independent System Operator (CISO) | 1.4 GWh | May 2006 | Dec 2024 | Solar |
| SunEdison Walmart Apple Valley DC | SunE M5 Holdings LLC | Apple Valley, CA | California Independent System Operator (CISO) | 716.0 MWh | Feb 2009 | Dec 2024 | Solar |
| Vaca Dixon Solar Station | Pacific Gas & Electric Co. | Vacaville, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2009 | Dec 2024 | Solar |
| G2 Energy Ostrom Road LLC | G2 Energy LLC | Wheatland, CA | California Independent System Operator (CISO) | 29.0 GWh | Jan 2009 | Dec 2024 | Landfill Gas |
| Calabasas Gas to Energy Facility | Los Angeles County Sanitation | Agoura, CA | California Independent System Operator (CISO) | 36.3 GWh | Jun 2010 | Dec 2024 | Landfill Gas |
| FPL Energy Montezuma Winds LLC | FPL Energy Montezuma Wind | Birds Landing, CA | California Independent System Operator (CISO) | 85.4 GWh | Oct 2010 | Dec 2024 | Wind |
| Alta Wind Energy Center I | Alta Wind I, LLC | Mojave, CA | California Independent System Operator (CISO) | 434.7 GWh | Dec 2010 | Dec 2024 | Wind |
| Alta Wind Energy Center II | Alta Wind II, LLC | Mojave, CA | California Independent System Operator (CISO) | 364.6 GWh | Dec 2010 | Dec 2024 | Wind |
| Alta Wind Energy Center III | Alta Wind III, LLC | Mojave, CA | California Independent System Operator (CISO) | 363.2 GWh | Jan 2011 | Dec 2024 | Wind |
| Alta Wind Energy Center IV | Alta Wind IV, LLC | Mojave, CA | California Independent System Operator (CISO) | 193.4 GWh | Mar 2011 | Dec 2024 | Wind |
| Alta Wind Energy Center V | Alta Wind V, LLC | Mojave, CA | California Independent System Operator (CISO) | 288.4 GWh | Mar 2011 | Dec 2024 | Wind |
| Alpine Solar | Alpine BESS LLC | Lancaster, CA | California Independent System Operator (CISO) | 118.8 GWh | Jan 2013 | Dec 2024 | Solar |
| Garnet Wind Energy Center | Terra-Gen Operating Co-Wind | North Palm Springs, CA | California Independent System Operator (CISO) | 11.9 GWh | May 2009 | Dec 2024 | Wind |
| Pine Tree Solar Project | Los Angeles Department of Water & Power | Owenyo, CA | Los Angeles Department of Water and Power (LDWP) | 7.2 GWh | Feb 2013 | Dec 2024 | Solar |
| Maclay Solar Project | Los Angeles Department of Water & Power | Sylmar, CA | Los Angeles Department of Water and Power (LDWP) | 1.1 GWh | Mar 2017 | Dec 2024 | Solar |
| Occidental College Solar Project | Occidental College | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 1.3 GWh | Jan 2013 | Dec 2024 | Solar |
| Los Angeles Harbor College | Los Angeles Community College District | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 2.5 GWh | Sep 2010 | Dec 2024 | Solar |
| Avenal Park | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 9.5 GWh | Jul 2011 | Dec 2024 | Solar |
| Sun City Project LLC | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 33.9 GWh | Jul 2011 | Dec 2024 | Solar |
| Sand Drag LLC | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 28.2 GWh | Jul 2011 | Dec 2024 | Solar |
| Siphon Drop Power Plant | Yuma County Water User's Association | Winterhaven, CA | Western Area Power Administration - Desert Southwest Region (WALC) | 11.6 GWh | Aug 1987 | Dec 2024 | Water |
| California Valley Solar Ranch | Clearway Energy Operating LLC | California Valley, CA | California Independent System Operator (CISO) | 597.7 GWh | Aug 2012 | Dec 2024 | Solar |
| Solar Photovoltaic Project #42 | Southern California Edison Co | Tulare, CA | California Independent System Operator (CISO) | 7.6 GWh | Oct 2012 | Dec 2024 | Solar |
| Solar Borrego I | NRG Solar Borrego I | Borrego Springs, CA | California Independent System Operator (CISO) | 62.2 GWh | Jan 2013 | Dec 2024 | Solar |
| Mountain View IV | AES Distributed Energy | North Palm Springs, CA | California Independent System Operator (CISO) | 186.8 GWh | Jan 2012 | Dec 2024 | Wind |
| Caltech Central | Bloom Energy 2009 PPA | Pasadena, CA | California Independent System Operator (CISO) | 8.7 GWh | Oct 2010 | Dec 2024 | Natural Gas |
| Manzana Wind LLC | Avangrid Power LLC | Rosamond, CA | California Independent System Operator (CISO) | 543.7 GWh | Nov 2012 | Dec 2024 | Wind |
| Imperial Solar Energy Center South | CSOLAR IV South LLC | Calexico, CA | California Independent System Operator (CISO) | 264.3 GWh | Oct 2013 | Dec 2024 | Solar |
| Imperial Solar Energy Center West | CSOLAR IV West LLC | Seeley, CA | California Independent System Operator (CISO) | 373.6 GWh | Mar 2016 | Dec 2024 | Solar |
| Five Points Solar Station | Pacific Gas & Electric Co. | Five Points, CA | California Independent System Operator (CISO) | 15.4 GWh | Aug 2011 | Dec 2024 | Solar |
| Westside Solar Station | Pacific Gas & Electric Co. | Five Points, CA | California Independent System Operator (CISO) | 13.9 GWh | Jul 2011 | Dec 2024 | Solar |
| FRV SI Transport Solar LP | FRV SI Transport Solar, L.P. (Sacremento) | Sacramento, CA | California Independent System Operator (CISO) | 1.4 GWh | Jul 2010 | Dec 2024 | Solar |
| Giffen | Pacific Gas & Electric Co. | TBD, CA | California Independent System Operator (CISO) | 13.6 GWh | May 2012 | Dec 2024 | Solar |
| Cantua Solar Station | Pacific Gas & Electric Co. | TBD, CA | California Independent System Operator (CISO) | 31.2 GWh | May 2012 | Dec 2024 | Solar |
| Huron Solar Station | Pacific Gas & Electric Co. | Huron, CA | California Independent System Operator (CISO) | 28.8 GWh | May 2012 | Dec 2024 | Solar |
| Pio Pico Energy Center | Pio Pico Energy Center LLC | San Diego, CA | California Independent System Operator (CISO) | 65.9 GWh | Oct 2016 | Dec 2024 | Natural Gas |
| Sunnyvale City of WPCP | Sunnyvale City of WPCP | Sunnyvale, CA | California Independent System Operator (CISO) | 9.5 GWh | Oct 1997 | Dec 2024 | Natural Gas : 48.8% Other Biomass Gas : 28.3% Landfill Gas : 22.9% |
| Sunset Reservoir North Basin | Duke Energy Renewables Services | San Francisco, CA | California Independent System Operator (CISO) | 6.5 GWh | Aug 2010 | Dec 2024 | Solar |
| Robert O Schulz Solar Farm | South San Joaquin Irr District | Oakdale, CA | California Independent System Operator (CISO) | 2.1 GWh | Apr 2008 | Dec 2024 | Solar |
| Broadridge Cogen | Broadridge Customer Communications | El Dorado Hills, CA | California Independent System Operator (CISO) | 15.8 GWh | Apr 2008 | Dec 2024 | Natural Gas : 91.9% Solar : 8.1% |
| Shiloh III Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 265.2 GWh | Nov 2011 | Dec 2024 | Wind |
| Teichert Materials-Teichert Vernalis | Foundation HA Energy Generation, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 1.9 GWh | Sep 2010 | Dec 2024 | Wind |
| Rising Tree Wind Farm | Rising Tree Wind Farm LLC | Mojave, CA | California Independent System Operator (CISO) | 249.0 GWh | Dec 2014 | Dec 2024 | Wind |
| Foundation ST | Foundation HA Energy Generation, LLC | Tracy, CA | California Independent System Operator (CISO) | 2.2 GWh | May 2011 | Dec 2024 | Wind |
| Regulus Solar Project | Regulus Solar, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 153.6 GWh | Oct 2014 | Dec 2024 | Solar |
| Adobe Solar | Southern Power Co | Arvin, CA | California Independent System Operator (CISO) | 39.6 GWh | Apr 2014 | Dec 2024 | Solar |
| Temescal Canyon RV, LLC | Temescal Canyon RV, LLC | Corona, CA | California Independent System Operator (CISO) | 1.9 GWh | Apr 2011 | Dec 2024 | Solar |
| SMUD at Grundman | Sacramento PV Energy, LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 29.4 GWh | Nov 2011 | Dec 2024 | Solar |
| SMUD at Van Conett | Sacramento PV Energy, LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 5.0 GWh | Nov 2011 | Dec 2024 | Solar |
| SMUD at Fleshman | Sacramento PV Energy, LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 5.0 GWh | Nov 2011 | Dec 2024 | Solar |
| City of Madera WWTP | SunE GIL1, LLC | Madera, CA | California Independent System Operator (CISO) | 1.4 GWh | Aug 2009 | Dec 2024 | Solar |
| Staples La Mirada, CA | SunE WF3-ST Holdings, LLC | La Mirada, CA | California Independent System Operator (CISO) | 871.0 MWh | Feb 2009 | Dec 2024 | Solar |
| Power Generation Station (PGS) 2 | East Bay Municipal Util Dist | Oakland, CA | California Independent System Operator (CISO) | 16.5 GWh | Nov 2011 | Dec 2024 | Other Biomass Gas |
| Aerojet I | Altus Power America Management, LLC | Rancho Cordova, CA | Balancing Authority of Northern California (BANC) | 5.1 GWh | Nov 2009 | Dec 2024 | Solar |
| Aerojet II | Altus Power America Management, LLC | Rancho Cordova, CA | Balancing Authority of Northern California (BANC) | 3.8 GWh | May 2010 | Dec 2024 | Solar |
| Vasco Winds | Vasco Winds, LLC | Livermore, CA | California Independent System Operator (CISO) | 223.0 GWh | Nov 2011 | Dec 2024 | Wind |
| Montezuma Wind II | NextEra Energy Montezuma Wind II, LLC | Birds Landing, CA | California Independent System Operator (CISO) | 195.7 GWh | Dec 2011 | Dec 2024 | Wind |
| Catalina Solar LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 262.2 GWh | Nov 2012 | Dec 2024 | Solar |
| North Palm Springs 4A | Greenbacker Renewable Energy Corporation | Palm Springs, CA | California Independent System Operator (CISO) | 7.9 GWh | Sep 2012 | Dec 2024 | Solar |
| Shiloh IV Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 278.3 GWh | Nov 2012 | Dec 2024 | Wind |
| North Palm Springs 1A | Greenbacker Renewable Energy Corporation | Palm Springs, CA | California Independent System Operator (CISO) | 5.2 GWh | Mar 2012 | Dec 2024 | Solar |
| SMUD at Lawrence | Sacramento PV Energy, LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 1.6 GWh | Nov 2011 | Dec 2024 | Solar |
| Pacific Wind LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 311.2 GWh | Jul 2012 | Dec 2024 | Wind |
| Naval Air Weapons Station China Lake | MN8 Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 22.0 GWh | Aug 2012 | Dec 2024 | Solar |
| Ameresco Butte County | Ameresco Butte County LLC | Paradise, CA | California Independent System Operator (CISO) | 16.8 GWh | Jan 2013 | Dec 2024 | Landfill Gas |
| Palo Verde College | Scale Sustainable I, LLC | Blythe, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2009 | Dec 2024 | Solar |
| Windstar 1 | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 263.0 GWh | Jan 2012 | Dec 2024 | Wind |
| RE Dillard 1 LLC | MN8 Energy LLC | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 6.0 GWh | Dec 2011 | Dec 2024 | Solar |
| RE Dillard 2 LLC | MN8 Energy LLC | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 6.1 GWh | Dec 2011 | Dec 2024 | Solar |
| RE Dillard 3 LLC | MN8 Energy LLC | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 6.1 GWh | Dec 2011 | Dec 2024 | Solar |
| RE Bruceville 1 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 10.9 GWh | Dec 2011 | Dec 2024 | Solar |
| RE Bruceville 2 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.3 GWh | Jan 2012 | Dec 2024 | Solar |
| RE Bruceville 3 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.0 GWh | Jan 2012 | Dec 2024 | Solar |
| Foundation AB | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2011 | Dec 2024 | Wind |
| Foundation IE | Foundation HA Energy Generation, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 373.0 MWh | Nov 2011 | Dec 2024 | Wind |
| Golden Springs Building C-1 | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 1.3 GWh | Jan 2012 | Dec 2024 | Solar |
| Golden Springs Building D | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 651.0 MWh | Feb 2012 | Dec 2024 | Solar |
| Franklin Templeton San Mateo | Bloom Energy | San Mateo, CA | California Independent System Operator (CISO) | 9.3 GWh | Oct 2011 | Dec 2024 | Natural Gas |
Browse Power Plants By California Counties
Figures are based on September 2025 generation numbers.| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Kern County, CA | # 1 | 313 | 34.9 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| Los Angeles County, CA | # 3 | 308 | 18.9 TWh |
| Riverside County, CA | # 4 | 159 | 14.7 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.2 TWh |
| San Bernardino County, CA | # 6 | 204 | 12.8 TWh |
| Imperial County, CA | # 7 | 84 | 9.7 TWh |
| Shasta County, CA | # 8 | 46 | 7.7 TWh |
| Fresno County, CA | # 9 | 119 | 7.6 TWh |
| Sacramento County, CA | # 10 | 65 | 6.4 TWh |
| Sonoma County, CA | # 11 | 26 | 5.2 TWh |
| San Diego County, CA | # 12 | 151 | 5.1 TWh |
| Kings County, CA | # 13 | 57 | 4.3 TWh |
| Santa Clara County, CA | # 14 | 75 | 4.1 TWh |
| Butte County, CA | # 15 | 25 | 3.4 TWh |
| Solano County, CA | # 16 | 40 | 3.2 TWh |
| Monterey County, CA | # 17 | 29 | 3.2 TWh |
| Colusa County, CA | # 18 | 3 | 2.9 TWh |
| Orange County, CA | # 19 | 59 | 2.9 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.8 TWh |
| Tuolumne County, CA | # 21 | 23 | 2.7 TWh |
| Alameda County, CA | # 22 | 47 | 2.5 TWh |
| San Joaquin County, CA | # 23 | 47 | 2.2 TWh |
| Placer County, CA | # 24 | 24 | 2.0 TWh |
| Plumas County, CA | # 25 | 13 | 1.9 TWh |
| Sutter County, CA | # 26 | 8 | 1.8 TWh |
| Yuba County, CA | # 27 | 5 | 1.6 TWh |
| Tulare County, CA | # 28 | 69 | 1.5 TWh |
| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| El Dorado County, CA | # 29 | 15 | 1.4 TWh |
| Inyo County, CA | # 30 | 23 | 1.1 TWh |
| Madera County, CA | # 31 | 28 | 950.7 GWh |
| Lake County, CA | # 32 | 10 | 905.4 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Ventura County, CA | # 34 | 32 | 756.5 GWh |
| Amador County, CA | # 35 | 8 | 649.7 GWh |
| Trinity County, CA | # 36 | 5 | 569.3 GWh |
| Merced County, CA | # 37 | 31 | 522.8 GWh |
| Calaveras County, CA | # 38 | 6 | 513.9 GWh |
| Humboldt County, CA | # 39 | 10 | 467.8 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Santa Barbara County, CA | # 41 | 18 | 331.1 GWh |
| San Benito County, CA | # 42 | 6 | 302.7 GWh |
| Mariposa County, CA | # 43 | 2 | 299.7 GWh |
| Siskiyou County, CA | # 44 | 8 | 236.7 GWh |
| Nevada County, CA | # 45 | 12 | 219.1 GWh |
| Yolo County, CA | # 46 | 15 | 216.2 GWh |
| San Mateo County, CA | # 47 | 11 | 133.1 GWh |
| San Francisco County, CA | # 48 | 10 | 84.0 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| Tehama County, CA | # 50 | 7 | 59.7 GWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Sierra County, CA | # 52 | 3 | 33.2 GWh |
| Marin County, CA | # 53 | 3 | 19.0 GWh |
| Glenn County, CA | # 54 | 2 | 18.7 GWh |
| Mendocino County, CA | # 55 | 5 | 12.3 GWh |