Directory of Power Plants in the United States
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Seven Mile Hill | PacifiCorp | Medicine Bow, WY | PacifiCorp East (PACE) | 463.2 GWh | Nov 2008 | Dec 2023 | Wind |
Plainfield Renewable Energy LLC | Plainfield Renewable Energy, LLC | Plainfield, CT | ISO New England (ISNE) | 233.8 GWh | Nov 2013 | Dec 2023 | Wood/Wood Waste Solids : 99.6% |
Haverhill North Cogeneration Facility | SunCoke Energy, Inc. | Franklin Furnace, OH | PJM Interconnection, LLC (PJM) | 353.4 GWh | Nov 2008 | Dec 2023 | Other Gas : 95.0% Natural Gas : 5.0% |
Lanchester Generating Station | EDL Inc | Narvon, PA | PJM Interconnection, LLC (PJM) | 17.7 GWh | Nov 2006 | Dec 2023 | Landfill Gas |
Bryon Center | EDL Inc | Byron Center, MI | Midcontinent Independent System Operator, Inc. (MISO) | 24.0 GWh | Feb 2009 | Dec 2023 | Landfill Gas |
Pinconning White Feather | EDL Inc | Pinconning, MI | Midcontinent Independent System Operator, Inc. (MISO) | 16.8 GWh | Feb 2009 | Dec 2023 | Landfill Gas |
Trans-Jordan Generating Station | EDL Inc | South Jordan, UT | PacifiCorp East (PACE) | 38.2 GWh | Feb 2009 | Dec 2023 | Landfill Gas |
Wheat Field Wind Power Project | Wheat Field Wind Power Project LLC | Arlington, OR | Bonneville Power Administration (BPAT) | 190.8 GWh | Jan 2009 | Dec 2023 | Wind |
Arlington Wind Power Project | Arlington Wind Power Project LLC | Arlington, OR | Bonneville Power Administration (BPAT) | 177.8 GWh | Nov 2008 | Dec 2023 | Wind |
Rail Splitter Wind Farm | Rail Splitter Wind Farm LLC | Hopedale, IL | Midcontinent Independent System Operator, Inc. (MISO) | 255.9 GWh | Jul 2009 | Dec 2023 | Wind |
Sagebrush Power Partners | Sagebrush Power Partners, LLC | Ellensburg, WA | Bonneville Power Administration (BPAT) | 255.0 GWh | Oct 2010 | Dec 2023 | Wind |
Crosswind Energy Project | Junction Hilltop Management LLC | Ruthven, IA | Southwest Power Pool (SWPP) | 57.8 GWh | May 2007 | Dec 2023 | Wind |
Hardin Hilltop Wind LLC | Junction Hilltop Management LLC | Jefferson, IA | Midcontinent Independent System Operator, Inc. (MISO) | 34.7 GWh | Apr 2007 | Dec 2023 | Wind |
Covel Gardens Gas Recovery | EDL Inc | San Antonio, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 20.6 GWh | Oct 2005 | Dec 2023 | Landfill Gas |
Taylor | EDL Inc | Mauk, GA | Southern Company Services, Inc. - Trans (SOCO) | 31.7 GWh | Aug 2003 | Dec 2023 | Landfill Gas |
Meldahl Hydroelectric Project | City of Hamilton - (OH) | Foster, KY | PJM Interconnection, LLC (PJM) | 539.3 GWh | Dec 2015 | Dec 2023 | Water |
SECCRA Community Landfill | Southeastern Chester County Refuse Auth | West Grove, PA | PJM Interconnection, LLC (PJM) | 3.4 GWh | Dec 2006 | Dec 2023 | Landfill Gas |
Shiloh Wind Project 2 LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 431.7 GWh | Dec 2008 | Dec 2023 | Wind |
Wapsipinicon Wind Project | EDF Renewable Asset Holdings, Inc. | Dexter, MN | Midcontinent Independent System Operator, Inc. (MISO) | 217.0 GWh | Jan 2009 | Dec 2023 | Wind |
Hall's Warehouse Solar Project | Sunlight General Solar Fund II, LLC | South Plainfield, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | Jan 2009 | Dec 2023 | Solar |
Hoosier Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Goodland, IN | Midcontinent Independent System Operator, Inc. (MISO) | 207.8 GWh | Oct 2009 | Dec 2023 | Wind |
Flat Ridge Wind Energy LLC | AE Power Services LLC | Isabel, KS | Southwest Power Pool (SWPP) | 175.5 GWh | Feb 2009 | Dec 2023 | Wind |
Pennsauken Solar | EPP Renewable Energy | Pennsauken, NJ | PJM Interconnection, LLC (PJM) | 1.9 GWh | May 2006 | Dec 2023 | Solar |
Cumberland County Solid Waste Complex | EPP Renewable Energy | Millville, NJ | PJM Interconnection, LLC (PJM) | 21.4 GWh | Oct 2008 | Dec 2023 | Landfill Gas |
Cumberland County PA LFG Recovery | EPP Renewable Energy | Shippensburg, PA | PJM Interconnection, LLC (PJM) | 45.8 GWh | Dec 2008 | Dec 2023 | Landfill Gas |
Warren County Solar | EPP Renewable Energy | Belvidere, NJ | PJM Interconnection, LLC (PJM) | 2.5 GWh | May 2012 | Dec 2023 | Solar |
PPL Renewable Energy Merck Solar | EPP Renewable Energy | Summit, NJ | PJM Interconnection, LLC (PJM) | 691.0 MWh | Apr 2009 | Dec 2023 | Solar |
Norther Tier Landfill | EPP Renewable Energy | Burlington, PA | PJM Interconnection, LLC (PJM) | 8.8 GWh | Dec 2008 | Dec 2023 | Landfill Gas |
Moretown | EPP Renewable Energy | Waterbury, VT | ISO New England (ISNE) | 4.8 GWh | Nov 2008 | Dec 2023 | Landfill Gas |
Ameresco Stafford | AMERESCO Stafford LLC | Stafford, VA | PJM Interconnection, LLC (PJM) | 1.2 GWh | Apr 2009 | Dec 2023 | Landfill Gas |
Ameresco Jefferson City | AMERESCO Jefferson City LLC | Jefferson City, MO | Midcontinent Independent System Operator, Inc. (MISO) | 22.4 GWh | Feb 2009 | Dec 2023 | Landfill Gas |
Ameresco Keller Canyon | AMERESCO Keller Canyon LLC | Bay Point, CA | California Independent System Operator (CISO) | 28.7 GWh | Jun 2009 | Dec 2023 | Landfill Gas |
Ameresco Chiquita Canyon | AMERESCO Chiquita Canyon LLC | Castaic, CA | California Independent System Operator (CISO) | 32.6 GWh | Oct 2010 | Dec 2023 | Landfill Gas |
Atlantic City Convention Center | Luminace Solar New Jersey, LLC | Atlantic City, NJ | PJM Interconnection, LLC (PJM) | 2.8 GWh | Nov 2008 | Dec 2023 | Solar |
Altona | Valcour Operating Services, LLC | Altona, NY | New York Independent System Operator (NYIS) | 120.2 GWh | Mar 2009 | Dec 2023 | Wind |
Wethersfield | Valcour Operating Services, LLC | Gainsville, NY | New York Independent System Operator (NYIS) | 176.0 GWh | Mar 2009 | Dec 2023 | Wind |
Chateaugay | Valcour Operating Services, LLC | Chateaugay, NY | New York Independent System Operator (NYIS) | 140.6 GWh | Mar 2009 | Dec 2023 | Wind |
Great Plains Windpark LLC | Great Plains Windpark Legacy LLC | Spearman, TX | Southwest Power Pool (SWPP) | 127.7 GWh | Dec 2008 | Dec 2023 | Wind |
Gap Pacific Distribution Center | MN8 Energy LLC | Fresno, CA | California Independent System Operator (CISO) | 5.7 GWh | Sep 2008 | Dec 2023 | Solar |
Langdon Wind II LLC | FPL Energy Langdon Wind LLC | Osnabrock, ND | Midcontinent Independent System Operator, Inc. (MISO) | 159.9 GWh | Aug 2008 | Dec 2023 | Wind |
Orange Grove Peaking Facility | Orange Grove Energy LP | Pala, CA | California Independent System Operator (CISO) | 18.1 GWh | May 2010 | Dec 2023 | Natural Gas |
SAS Solar Farm | SAS Institute Inc | Cary, NC | Duke Energy Progress East (CPLE) | 1.7 GWh | Nov 2008 | Dec 2023 | Solar |
Imperial Valley Solar, LLC | Imperial Valley Solar, LLC | Calexico, CA | California Independent System Operator (CISO) | 346.4 GWh | Oct 2013 | Dec 2023 | Solar |
FPL Energy Ashtabula Wind LLC | FPL Energy Ashtabula Wind LLC | Luverne, ND | Midcontinent Independent System Operator, Inc. (MISO) | 561.6 GWh | Nov 2008 | Dec 2023 | Wind |
Panther Creek Wind Farm I | RWE Renewables Americas, LLC | Big Spring, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 519.3 GWh | Jun 2008 | Dec 2023 | Wind |
Panther Creek Wind Farm II | RWE Renewables Americas, LLC | Big Spring, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 391.1 GWh | Nov 2008 | Dec 2023 | Wind |
Fairfield University CHP Plant | Fairfield University | Fairfield, CT | ISO New England (ISNE) | 25.3 GWh | Sep 2007 | Dec 2023 | Natural Gas |
DeSoto Next Generation Solar Energy | Florida Power & Light Co | Arcadia, FL | Florida Power & Light Co. (FPL) | 33.5 GWh | Sep 2009 | Dec 2023 | Solar |
Space Coast Next Gen Solar Energy | Florida Power & Light Co | Merritt Island, FL | Florida Power & Light Co. (FPL) | 12.8 GWh | Mar 2010 | Dec 2023 | Solar |
Threemile Canyon | Threemile Canyon Wind I, LLC | Boardman, OR | PacifiCorp West (PACW) | 19.5 GWh | Jun 2009 | Dec 2023 | Wind |
SunEdison LV Sutton Plant Site | SunE NC Progress 1 LLC | Wilmington, NC | Duke Energy Progress East (CPLE) | 1.2 GWh | Nov 2008 | Dec 2023 | Solar |
Solar Blythe LLC | NRG Solar Blythe | Blythe, CA | California Independent System Operator (CISO) | 40.5 GWh | Nov 2009 | Dec 2023 | Solar |
Grand Ridge Wind Energy Center | Invenergy Services LLC | Marseilles, IL | PJM Interconnection, LLC (PJM) | 426.0 GWh | Sep 2008 | Dec 2023 | Wind |
CM10 | Consolidated Edison Development Inc. | Boulder City, NV | California Independent System Operator (CISO) | 19.2 GWh | Nov 2008 | Dec 2023 | Solar |
High Lonesome Mesa LLC | High Lonesome Mesa, LLC | Willard, NM | Public Service Company of New Mexico (PNM) | 350.1 GWh | Jun 2009 | Dec 2023 | Wind |
Buffalo Bear LLC | Buffalo Bear, LLC | Woodward, OK | Southwest Power Pool (SWPP) | 21.8 GWh | Nov 2008 | Dec 2023 | Wind |
Elkhorn Ridge Wind LLC | Elkhorn Ridge Wind, LLC | Bloomfield, NE | Southwest Power Pool (SWPP) | 157.2 GWh | Feb 2009 | Dec 2023 | Wind |
Enoree Phase II Landfill Gas Recovery | Enerdyne Power Systems Inc | Greer, SC | Duke Energy Carolinas (DUK) | 283.0 MWh | Jul 2008 | Dec 2023 | Landfill Gas |
Willow Creek Energy Center | Invenergy Services LLC | Lone, OR | Bonneville Power Administration (BPAT) | 140.0 GWh | Dec 2008 | Dec 2023 | Wind |
High Sheldon Wind Farm | Invenergy Services LLC | Strykersville, NY | New York Independent System Operator (NYIS) | 184.0 GWh | Jan 2009 | Dec 2023 | Wind |
Bull Creek Wind | Bull Creek Wind LLC | O'Donnell, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 269.0 GWh | Nov 2008 | Dec 2023 | Wind |
Pioneer Crossing Energy, LLC | Pioneer Crossing Energy LLC | Birdsboro, PA | PJM Interconnection, LLC (PJM) | 41.1 GWh | Sep 2008 | Dec 2023 | Landfill Gas |
DANC LFGTE Facility | Innovative Energy Systems Inc | Rodman, NY | New York Independent System Operator (NYIS) | 22.5 GWh | Sep 2008 | Dec 2023 | Landfill Gas |
Ocotillo Windpower | Duke Energy Renewables Services | Forsan, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 18.4 GWh | Aug 2008 | Dec 2023 | Wind |
Iredell County LFG Facility | Iredell Transmission LLC | Statesville, NC | Duke Energy Carolinas (DUK) | 25.2 GWh | Jul 2008 | Dec 2023 | Landfill Gas |
QVC Inc | RMQ Ventures LLC | Rocky Mount, NC | PJM Interconnection, LLC (PJM) | 2.8 GWh | Nov 2008 | Dec 2023 | Solar |
Butter Creek Power LLC | Odessa Energy Services LLC | Echo, OR | PacifiCorp West (PACW) | 10.2 GWh | May 2009 | Dec 2023 | Wind |
Big Top LLC | Odessa Energy Services LLC | Echo, OR | PacifiCorp West (PACW) | 3.2 GWh | May 2009 | Dec 2023 | Wind |
Four Corners Windfarm LLC | Echo 2 | Echo, OR | PacifiCorp West (PACW) | 17.0 GWh | May 2009 | Dec 2023 | Wind |
Four Mile Canyon Windfarm LLC | Echo 2 | Echo, OR | PacifiCorp West (PACW) | 17.3 GWh | May 2009 | Dec 2023 | Wind |
Oregon Trail Windfarm LLC | Echo 1 | Echo, OR | PacifiCorp West (PACW) | 21.2 GWh | May 2009 | Dec 2023 | Wind |
Pacific Canyon Windfarm LLC | Echo 1 | Echo, OR | PacifiCorp West (PACW) | 16.0 GWh | May 2009 | Dec 2023 | Wind |
Sand Ranch Windfarm LLC | Echo 1 | Echo, OR | PacifiCorp West (PACW) | 19.2 GWh | May 2009 | Dec 2023 | Wind |
Wagon Trail LLC | Odessa Energy Services LLC | Echo, OR | PacifiCorp West (PACW) | 6.2 GWh | May 2009 | Dec 2023 | Wind |
Ward Butte Windfarm LLC | Echo 1 | Echo, OR | PacifiCorp West (PACW) | 14.2 GWh | May 2009 | Dec 2023 | Wind |
Panther Creek Wind Farm Three | RWE Renewables Americas, LLC | Big Spring, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 699.7 GWh | Jul 2009 | Dec 2023 | Wind |
Stony Creek Wind Farm LLC | RWE Renewables Americas, LLC | Berlin, PA | PJM Interconnection, LLC (PJM) | 128.0 GWh | Oct 2009 | Dec 2023 | Wind |
NGP Blue Mountain I LLC | NGP Blue Mountain I LLC | Winnemucca, NV | Nevada Power Company (NEVP) | 193.9 GWh | Oct 2009 | Dec 2023 | Geothermal |
Papalote Creek I LLC | RWE Renewables Americas, LLC | Taft, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 421.0 GWh | Aug 2009 | Dec 2023 | Wind |
Inadale Wind Farm LLC Hybrid | RWE Renewables Americas, LLC | Roscoe, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 427.2 GWh | Aug 2009 | Dec 2023 | Wind |
Smoky Hills Wind Project Phase II | Smoky Hills Wind Project II LLC | Lincoln, KS | Southwest Power Pool (SWPP) | 437.7 GWh | Oct 2008 | Dec 2023 | Wind |
Clinton LFGTE Facility | Innovative Energy Systems Inc | Morrisonville, NY | New York Independent System Operator (NYIS) | 47.3 GWh | Sep 2008 | Dec 2023 | Landfill Gas |
Hyland LFGTE Facility | Innovative Energy Systems Inc | Angelica, NY | New York Independent System Operator (NYIS) | 34.1 GWh | Jul 2008 | Dec 2023 | Landfill Gas |
Stetson Wind I | Evergreen Wind, LLC | Danforth, ME | ISO New England (ISNE) | 106.6 GWh | Dec 2008 | Dec 2023 | Wind |
Rollins Wind Project | Evergreen Wind, LLC | Winn Village, ME | ISO New England (ISNE) | 132.2 GWh | Jun 2011 | Dec 2023 | Wind |
Stetson Wind II | Evergreen Wind, LLC | Danforth, ME | ISO New England (ISNE) | 45.7 GWh | Feb 2010 | Dec 2023 | Wind |
MF Mesa Lane LLC | MF Mesa Lane LLC | Morrisville, PA | PJM Interconnection, LLC (PJM) | 3.1 GWh | Oct 2008 | Dec 2023 | Solar |
Grand Meadow | Northern States Power Co - Minnesota | Dexter, MN | Midcontinent Independent System Operator, Inc. (MISO) | 325.9 GWh | Nov 2008 | Dec 2023 | Wind |
Arrowrock Hydroelectric Project | Boise-Kuna Irrigation District | Boise, ID | Idaho Power Company (IPCO) | 55.9 GWh | Mar 2010 | Dec 2023 | Water |
El Cajon Energy Center | Wellhead Services, Inc | El Cajon, CA | California Independent System Operator (CISO) | 7.6 GWh | May 2010 | Dec 2023 | Natural Gas |
Fulton LFGTE Facility | Innovative Energy Systems Inc | Johnstown, NY | New York Independent System Operator (NYIS) | 14.6 GWh | May 2010 | Dec 2023 | Landfill Gas |
SunEdison Walgreens Moreno Valley | SunE WG113 Moreno Valley LLC | Moreno Valley, CA | California Independent System Operator (CISO) | 1.3 GWh | Aug 2007 | Dec 2023 | Solar |
Mariani Packing Vacaville Solar | SunE U6 Holdings LLC | Vacaville, CA | California Independent System Operator (CISO) | 891.0 MWh | Oct 2008 | Dec 2023 | Solar |
Walgreens Woodland Distribution Center | SunE WG45 Woodland LLC | Woodland, CA | California Independent System Operator (CISO) | 775.0 MWh | Jul 2007 | Dec 2023 | Solar |
SunEdison Ironwood State Prison | SunE CPA CDC2 LLC | Blythe, CA | California Independent System Operator (CISO) | 1.3 GWh | Apr 2008 | Dec 2023 | Solar |
SunEdison Procter & Gamble Oxnard | SunE U6 Holdings LLC | Oxnard, CA | California Independent System Operator (CISO) | 1.5 GWh | Sep 2009 | Dec 2023 | Solar |
Kohls San Bernardino Solar Facility | SunE WF3 KHL A Holdings, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 1.0 GWh | Oct 2007 | Dec 2023 | Solar |
SunEdison Anheuser Busch Fairfield | SunE M5 Holdings LLC | Fairfield, CA | California Independent System Operator (CISO) | 747.0 MWh | Nov 2008 | Dec 2023 | Solar |
Chuckawalla Valley State Prison | SunE CPA CDC1 LLC | Blythe, CA | California Independent System Operator (CISO) | 1.2 GWh | May 2006 | Dec 2023 | Solar |
SunEdison Walmart Apple Valley DC | SunE M5 Holdings LLC | Apple Valley, CA | California Independent System Operator (CISO) | 969.0 MWh | Feb 2009 | Dec 2023 | Solar |
Summary of Power Plants By State
Figures are based on February 2025 generation numbers.State | Rank | Active Plants | Feb 2025 Generation |
---|---|---|---|
Alabama | # 7 | 75 | 10,454.23 GWh |
Alaska | # 48 | 136 | 486.57 GWh |
Arizona | # 15 | 165 | 7,949.76 GWh |
Arkansas | # 28 | 80 | 4,750.62 GWh |
California | # 5 | 1,593 | 15,002.38 GWh |
Colorado | # 30 | 265 | 4,484.87 GWh |
Connecticut | # 34 | 152 | 3,568.74 GWh |
Delaware | # 49 | 31 | 376.39 GWh |
District of Columbia | # 51 | 12 | 16.79 GWh |
Florida | # 3 | 304 | 17,498.62 GWh |
Georgia | # 8 | 241 | 10,439.72 GWh |
Hawaii | # 46 | 66 | 666.80 GWh |
Idaho | # 44 | 143 | 1,423.14 GWh |
Illinois | # 4 | 338 | 15,696.94 GWh |
Indiana | # 12 | 203 | 9,055.86 GWh |
Iowa | # 20 | 281 | 6,506.74 GWh |
Kansas | # 24 | 157 | 5,156.03 GWh |
Kentucky | # 21 | 56 | 6,138.53 GWh |
Louisiana | # 17 | 80 | 7,192.83 GWh |
Maine | # 45 | 159 | 1,123.08 GWh |
Maryland | # 39 | 181 | 2,579.41 GWh |
Massachusetts | # 42 | 599 | 1,604.74 GWh |
Michigan | # 10 | 267 | 10,280.63 GWh |
Minnesota | # 27 | 740 | 5,066.98 GWh |
Mississippi | # 22 | 55 | 5,414.37 GWh |
Missouri | # 19 | 118 | 6,559.07 GWh |
State | Rank | Active Plants | Feb 2025 Generation |
---|---|---|---|
Montana | # 40 | 69 | 2,324.85 GWh |
Nebraska | # 36 | 119 | 3,333.41 GWh |
Nevada | # 37 | 109 | 3,002.03 GWh |
New Hampshire | # 43 | 56 | 1,435.29 GWh |
New Jersey | # 31 | 375 | 4,428.89 GWh |
New Mexico | # 38 | 140 | 2,585.31 GWh |
New York | # 11 | 830 | 10,266.35 GWh |
North Carolina | # 9 | 880 | 10,422.85 GWh |
North Dakota | # 33 | 57 | 3,825.72 GWh |
Ohio | # 6 | 190 | 12,150.65 GWh |
Oklahoma | # 18 | 131 | 6,818.46 GWh |
Oregon | # 25 | 259 | 5,152.36 GWh |
Pennsylvania | # 2 | 240 | 21,039.59 GWh |
Rhode Island | # 47 | 95 | 598.64 GWh |
South Carolina | # 14 | 198 | 8,120.13 GWh |
South Dakota | # 41 | 52 | 1,740.50 GWh |
Tennessee | # 26 | 84 | 5,101.16 GWh |
Texas | # 1 | 813 | 43,152.96 GWh |
Utah | # 35 | 119 | 3,334.96 GWh |
Vermont | # 50 | 112 | 195.02 GWh |
Virginia | # 13 | 215 | 8,814.15 GWh |
Washington | # 16 | 137 | 7,908.11 GWh |
West Virginia | # 29 | 36 | 4,645.25 GWh |
Wisconsin | # 23 | 221 | 5,315.49 GWh |
Wyoming | # 32 | 73 | 3,941.95 GWh |