East Campus Utility Plant
3220 Eden Avenue, Cincinnati, OH 45267Plant Summary Information
East Campus Utility Plant is ranked #23 out of 55 distillate fuel oil power plants in Ohio in terms of total annual net electricity generation.
East Campus Utility Plant is comprised of 3 generators and generated 11.8 MWh during the 3-month period between February 2026 to May 2026.
| Plant Name | East Campus Utility Plant |
|---|---|
| Utility Name | University of Cincinnati |
| Location | Hamilton County, OH |
| Initial Operation Date | July 2006 |
| Last Update | May 2026 |
| Annual Generation | 526.3 MWh |
| Annual Consumption | 5.1 k MMBtu |
| Ranked #12,226 out of 13,081 Power Plants Nationwide | |
| Ranked #561 out of 1,233 Distillate Fuel Oil Power Plants Nationwide | |
| Ranked #172 out of 206 Ohio Power Plants | |
| Ranked #23 out of 55 Ohio Distillate Fuel Oil Power Plants | |
| Fuel Types | Distillate Fuel Oil |
Map of East Campus Utility Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for East Campus Utility Plant.
Monthly Net Generation for East Campus Utility Plant
Monthly Plant Fuel Consumption for East Campus Utility Plant
East Campus Utility Plant Details
| Summary Information | |
|---|---|
| Plant Name | East Campus Utility Plant (57929) |
| Plant Address | 3220 Eden Avenue, Cincinnati, OH 45267 |
| Utility | University of Cincinnati (57281) |
| Latitude, Longitude | 39.13794, -84.50495 |
| Generation Dates on File | Jan 2011 to May 2026 |
| Initial Operation Date | July 2006 |
| Annual Generation | 526.3 MWh |
| Fuel Types | Distillate Fuel Oil |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Educational Services (611) |
| Sector | Commercial Non-CHP (4) |
| Water Source | City Water |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Duke Energy Ohio Inc (3542) OH |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | DUKE ENERGY OHIO |
| Natural Gas Storage | No |
Generator P007 Details Operating July 2006
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DEOK |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | DEOK |
| Nameplate Capacity | 2 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.7 MW |
| Winter Capacity | 1.7 MW |
| Minimum Load | 0.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2006 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator P008 Details Operating July 2006
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DEOK |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | DEOK |
| Nameplate Capacity | 1.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 0.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2006 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil / Other Biomass Liquids |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | DFO / OBL |
|---|---|
Generator P058 Details Operating May 2022
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DEOK |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | DEOK |
| Nameplate Capacity | 2.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2.5 MW |
| Winter Capacity | 2.5 MW |
| Minimum Load | 0.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2022 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
East Campus Utility Plant Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #551 | Pleasants Energy LLC | St Mary's, WV | 1.8 TWh |
| #552 | Perdue Diesel Generation Facility | Accomack, VA | 554.0 MWh |
| #553 | Cleveland Peaking | Cleveland, OH | 547.0 MWh |
| #554 | Dover Peaking | Dover, OH | 547.0 MWh |
| #555 | Saint Marys Hospital Power Plant | Rochester, MN | 55.5 GWh |
| #556 | Breese | Breese, IL | 539.0 MWh |
| #557 | Mankato Energy Center | Mankato, MN | 2.5 TWh |
| #558 | Wadsworth IPS RTO BTM | Wadsworth, OH | 534.0 MWh |
| #559 | Osceola Generating Station (FL) | St. Cloud, FL | 3.7 GWh |
| #560 | Piqua Power Plant | Piqua, OH | 529.0 MWh |
| #562 | Shawville | Shawville, PA | 1.2 TWh |
| #563 | Bellingham Cogeneration Facility | Bellingham, MA | 367.8 GWh |
| #564 | Yellowstone Energy LP | Billings, MT | 450.2 GWh |
| #565 | Cascade Creek | Rochester, MN | 32.7 GWh |
| #566 | Klawock Power Generation Station | Klawock, AK | 500.0 MWh |
| #567 | Univ Minnesota CHP Plant | Minneapolis, MN | 172.0 GWh |
| #568 | Winston | Lakeland, FL | 497.0 MWh |
| #569 | Water Treatment 1 & 2 | Groton, CT | 494.0 MWh |
| #570 | Clearwater Paper APP CB | Arkansas City, AR | 123.3 GWh |
| #571 | Marshall (NC) | Terrell, NC | 7.5 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding East Campus Utility Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Aero Solar Facility | Burlington, KY | 2.8 GWh | 11.1 mi |
| Bavarian LFGTE | Walton, KY | 30.9 GWh | 20.8 mi |
| Central Utility Plant Cincinnati | Cincinnati, OH | 223.0 GWh | 0.3 mi |
| CZ Solar Warren, LLC | Lebanon, OH | 32.2 GWh | 21.3 mi |
| Dick's Creek | Monroe, OH | 15.0 GWh | 23.6 mi |
| East Bend | Union, KY | 2.9 TWh | 24.7 mi |
| Hamilton (OH) | Hamilton, OH | 1.2 GWh | 19 mi |
| Hamilton Hydro | HAMILTON, OH | 8.8 GWh | 19.2 mi |
| Hamilton Peaking | Hamilton, OH | 1.5 GWh | 14.9 mi |
| L'Oreal Solar - Florence | Florence, KY | 1.5 GWh | 11.8 mi |
| Lawrenceburg Power, LLC | Lawrenceburg, IN | 7.6 TWh | 19.7 mi |
| Madison | Trenton, OH | 1.0 TWh | 21.8 mi |
| Miami Fort | North Bend, OH | 6.5 TWh | 16.1 mi |
| Middletown Coke Company, LLC | Middletown, OH | 360.0 GWh | 23.8 mi |
| Middletown Energy Center | Middletown, OH | 3.5 TWh | 24.1 mi |
| Parking Lot Array | Cincinnati, OH | 1.4 GWh | 0.4 mi |
| RA Jones Roof Mounted Solar System | Covington, KY | 2.0 GWh | 7.7 mi |
| Walton 1 Solar Facility | Walton, KY | 2.7 GWh | 20.4 mi |
| Walton 2 Solar Facility | Walton, KY | 2.6 GWh | 20.4 mi |
| Woodsdale | Trenton, OH | 463.4 GWh | 21.6 mi |