Los Vientos Wind 1B
4545 FM 507, Sebastian, TX 78594Plant Summary Information
Los Vientos Wind 1B is ranked #173 out of 220 wind farms in Texas in terms of total annual net electricity generation.
Los Vientos Wind 1B generated 104.3 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Los Vientos Wind 1B |
---|---|
Utility Name | Duke Energy Renewables Services |
Location | Cameron County, TX |
Initial Operation Date | December 2012 |
Last Update | Mar 2025 |
Annual Generation | 249.4 GWh |
Annual Consumption | 899.2 k MMBtu |
Ranked #2,087 out of 11,623 Power Plants Nationwide | |
Ranked #642 out of 1,344 Wind Power Plants Nationwide | |
Ranked #381 out of 769 Texas Power Plants | |
Ranked #173 out of 220 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Los Vientos Wind 1B, LLC (2013 to 2021) Duke Energy Renewables Services (2022 to 2023) |
Map of Los Vientos Wind 1B
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Los Vientos Wind 1B.
Monthly Net Generation for Los Vientos Wind 1B
Los Vientos Wind 1B Details
Summary Information | |
---|---|
Plant Name | Los Vientos Wind 1B (57752) |
Plant Address | 4545 FM 507, Sebastian, TX 78594 |
Utility | Duke Energy Renewables Services (65411) |
Latitude, Longitude | 26.34892, -97.6668 |
Generation Dates on File | Jan 2013 to Mar 2025 |
Initial Operation Date | December 2012 |
Annual Generation | 249.4 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 2012
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 201.6 MW |
Summer Capacity | 201.6 MW |
Winter Capacity | 201.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2012 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 84 |
Planned New Prime Mover | WT |
Planned Energy Source | WND |
Planned New Nameplate Capacity | 202 MW |
Planned Repower | December 2025 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 84 |
---|---|
Predominant Turbine Manufacturer | Mitsubishi |
Predominant Turbine Model Number | MWT-102/2.4 |
Design Wind Speed | 14.8 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 272 |
Los Vientos Wind 1B Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#632 | Copenhagen Wind Farm | Copenhagen, NY | 256.7 GWh |
#633 | Foote Creek Rim | WY | 256.3 GWh |
#634 | Rail Splitter Wind Farm | Hopedale, IL | 255.9 GWh |
#635 | Sagebrush Power Partners | Ellensburg, WA | 255.0 GWh |
#636 | Leaning Juniper | Arlington, OR | 254.7 GWh |
#637 | Brookfield | Pigeon, MI | 254.6 GWh |
#638 | Crystal Lake 3 LLC | Britt, IA | 254.3 GWh |
#639 | Keenan II Renewable Energy Co LLC | Woodward, OK | 252.8 GWh |
#640 | Caprock Wind Farm | San Jon, NM | 251.5 GWh |
#641 | Elm Creek Wind II LLC | Trimont, MN | 251.1 GWh |
#643 | Arkwright Summit Wind Farm LLC | Fredonia, NY | 249.2 GWh |
#644 | Hatchet Ridge Wind Project | Burney, CA | 248.5 GWh |
#645 | Pinyon Pine I | Mojave, CA | 248.3 GWh |
#646 | Oliver Wind IV | Hannover, ND | 248.3 GWh |
#647 | Mustang Hills LLC | Mojave, CA | 248.1 GWh |
#648 | Golden Hills Wind | Livermore, CA | 247.8 GWh |
#649 | Alta Wind XI | Mojave, CA | 247.6 GWh |
#650 | Goat Wind LP | Sterling City, TX | 245.7 GWh |
#651 | Sandy Ridge Wind 2, LLC | Tyrone, PA | 243.9 GWh |
#652 | Mendota Hills, LLC | Paw Paw, IL | 243.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Los Vientos Wind 1B.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bruennings Breeze Wind Farm | Raymondville, TX | 506.3 GWh | 12.1 mi |
Cameron Wind 1 LLC | Rio Hondo, TX | 346.0 GWh | 16.3 mi |
E. Porte Ct. | Harlingen, TX | 599.0 MWh | 10.8 mi |
El Sauz Ranch Wind, LLC | San Perlita, TX | 221.2 GWh | 11.3 mi |
La Chalupa, LLC | Rio Hondo, TX | 452.8 GWh | 11.8 mi |
Las Majadas Wind Farm | Santa Monica, TX | 845.9 GWh | 7.6 mi |
Los Vientos Wind 1A | Sebastian, TX | 339.7 GWh | 5.2 mi |
Magic Valley Wind Farm I LLC | San Perlita, TX | 428.2 GWh | 8.9 mi |
Nebula Solar | La Feria, TX | 254.7 GWh | 19.7 mi |
Palmas Wind, LLC | Rio Hondo, TX | 329.9 GWh | 11.3 mi |
Raymond Wind Farm, LLC | Lyford, TX | 633.6 GWh | 7.1 mi |
Ridge Rd | Alamo, TX | 684.0 MWh | 29.5 mi |
San Roman Wind I, LLC | Los Fresnos, TX | 235.6 GWh | 23.6 mi |
Santa Rosa | Santa Rosa, TX | 706.0 MWh | 12.7 mi |
Vancourt Solar Interconnections | La Feria, TX | 88.6 GWh | 19.7 mi |
Vaquero | Harlingen, TX | 709.0 MWh | 12.5 mi |
Villa Cavasos | Brownsville, TX | 696.0 MWh | 23.1 mi |
WAL456 | Brownsville, TX | 374.0 MWh | 27.3 mi |
WAL5165 | Alamo, TX | 391.0 MWh | 30.6 mi |
West Raymond Wind Farm LLC | Lyford, TX | 718.0 GWh | 20.3 mi |