Magic Valley Wind Farm I LLC
12550 Pennington Road, San Perlita, TX 78590Plant Summary Information
Magic Valley Wind Farm I LLC is ranked #121 out of 227 wind farms in Texas in terms of total annual net electricity generation.
Magic Valley Wind Farm I LLC generated 91.9 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Magic Valley Wind Farm I LLC |
|---|---|
| Utility Name | Big Sky Wind, LLC |
| Location | Willacy County, TX |
| Initial Operation Date | September 2012 |
| Last Update | Dec 2025 |
| Annual Generation | 482.9 GWh |
| Annual Consumption | 1.8 M MMBtu |
| Ranked #1,386 out of 12,613 Power Plants Nationwide | |
| Ranked #381 out of 1,374 Wind Power Plants Nationwide | |
| Ranked #281 out of 816 Texas Power Plants | |
| Ranked #121 out of 227 Texas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operators |
E ON Climate Renewables N America LLC (2013 to 2018) RWE Renewables Americas LLC (2019 to 2021) RWE Renewables Americas, LLC (2022 to 2023) Big Sky Wind, LLC (2024 to 2024) |
Map of Magic Valley Wind Farm I LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Magic Valley Wind Farm I LLC.
Monthly Net Generation for Magic Valley Wind Farm I LLC
Monthly Plant Fuel Consumption for Magic Valley Wind Farm I LLC
Magic Valley Wind Farm I LLC Details
| Summary Information | |
|---|---|
| Plant Name | Magic Valley Wind Farm I LLC (57802) |
| Plant Address | 12550 Pennington Road, San Perlita, TX 78590 |
| Utility | Big Sky Wind, LLC (56215) |
| Latitude, Longitude | 26.47528, -97.69111 |
| Generation Dates on File | May 2012 to Dec 2025 |
| Initial Operation Date | September 2012 |
| Annual Generation | 482.9 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 12-41 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator MV1 Details Operating September 2012
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | REDFISH_ALL |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | REDFISH_ALL |
| Nameplate Capacity | 203 MW |
| Summer Capacity | 203 MW |
| Winter Capacity | 203 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 2012 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 112 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 112 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V100-1.8 |
| Design Wind Speed | 16.6 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 262.4 |
Magic Valley Wind Farm I LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #371 | Desert Sky | Iraan, TX | 496.7 GWh |
| #372 | Top of the World Windpower Project | Glenrock, WY | 495.8 GWh |
| #373 | Marble River Wind Farm | Churubusco, NY | 495.4 GWh |
| #374 | Rocksprings | Del Rio, TX | 491.2 GWh |
| #375 | North Fork Ridge Wind Energy Center | Mindenmines, MO | 489.8 GWh |
| #376 | Grand Ridge Wind Energy Center | Marseilles, IL | 485.5 GWh |
| #377 | Limon Wind II | Limon, CO | 485.4 GWh |
| #378 | Lindahl Wind Project, LLC | Tioga, ND | 484.7 GWh |
| #379 | Frontier Windpower | Newkirk, OK | 484.5 GWh |
| #380 | Montague Wind Power Facility LLC | Arlington, OR | 483.2 GWh |
| #382 | Langdon Renewables, LLC | Langdon, ND | 482.4 GWh |
| #383 | Mesquite Creek Wind | Lamesa, TX | 481.9 GWh |
| #384 | Buffalo Ridge II LLC | Elkton, SD | 479.3 GWh |
| #385 | Walleye Wind | Beaver Creek, MN | 479.2 GWh |
| #386 | Voyager Wind II | Mojave, CA | 476.8 GWh |
| #387 | Tatanka Wind Power LLC | Ashley, ND | 476.1 GWh |
| #388 | Big Horn Wind Project | Bickelton, WA | 475.5 GWh |
| #389 | Cedar Springs III | Douglas, WY | 475.4 GWh |
| #390 | Deerfield Wind Energy, LLC | Kinde, MI | 475.0 GWh |
| #391 | Adams Wind | Lenox, IA | 474.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Magic Valley Wind Farm I LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bruennings Breeze Wind Farm | Raymondville, TX | 524.9 GWh | 3.2 mi |
| Cameron Wind 1 LLC | Rio Hondo, TX | 337.6 GWh | 23.8 mi |
| E. Porte Ct. | Harlingen, TX | 233.0 MWh | 19.6 mi |
| El Sauz Ranch Wind, LLC | San Perlita, TX | 819.2 GWh | 6 mi |
| Hidalgo Energy Center | Edinburg, TX | 2.7 TWh | 31.4 mi |
| La Chalupa, LLC | Rio Hondo, TX | 443.6 GWh | 19.1 mi |
| Las Majadas Wind Farm | Santa Monica, TX | 851.4 GWh | 11.8 mi |
| Los Vientos Wind 1A | Sebastian, TX | 408.3 GWh | 11.9 mi |
| Los Vientos Wind 1B | Sebastian, TX | 370.3 GWh | 8.9 mi |
| Magic Valley Generating Station | Edinburg, TX | 2.2 TWh | 32.3 mi |
| Nebula Solar | La Feria, TX | 291.3 GWh | 27.4 mi |
| Palmas Wind, LLC | Rio Hondo, TX | 362.5 GWh | 17.6 mi |
| Raymond Wind Farm, LLC | Lyford, TX | 676.3 GWh | 9.5 mi |
| Red Gate Power Plant | Edinburg, TX | 366.0 GWh | 30.1 mi |
| San Roman Wind I, LLC | Los Fresnos, TX | 255.7 GWh | 31 mi |
| Santa Rosa | Santa Rosa, TX | 275.0 MWh | 18.8 mi |
| Vancourt Solar Interconnections | La Feria, TX | 93.9 GWh | 27.4 mi |
| Vaquero | Harlingen, TX | 270.0 MWh | 21.3 mi |
| Villa Cavasos | Brownsville, TX | 269.0 MWh | 31.9 mi |
| West Raymond Wind Farm LLC | Lyford, TX | 761.8 GWh | 19.9 mi |