Water Treatment 1 & 2
1268 Poquonnock Rd, Groton, CT 6340Plant Summary Information
Water Treatment 1 & 2 is ranked #14 out of 19 distillate fuel oil power plants in Connecticut in terms of total annual net electricity generation.
Water Treatment 1 & 2 is comprised of 2 generators and generated 108.0 MWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Water Treatment 1 & 2 |
|---|---|
| Utility Name | Connecticut Mun Elec Engy Coop |
| Location | Southeastern Connecticut Planning Region, CT |
| Initial Operation Date | October 2010 |
| Last Update | Aug 2026 |
| Annual Generation | 410.0 MWh |
| Annual Consumption | 4.2 k MMBtu |
| Ranked #12,484 out of 13,301 Power Plants Nationwide | |
| Ranked #602 out of 1,239 Distillate Fuel Oil Power Plants Nationwide | |
| Ranked #162 out of 171 Connecticut Power Plants | |
| Ranked #14 out of 19 Connecticut Distillate Fuel Oil Power Plants | |
| Fuel Types | Distillate Fuel Oil |
Map of Water Treatment 1 & 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Water Treatment 1 & 2.
Monthly Net Generation for Water Treatment 1 & 2
Monthly Plant Fuel Consumption for Water Treatment 1 & 2
Water Treatment 1 & 2 Details
| Summary Information | |
|---|---|
| Plant Name | Water Treatment 1 & 2 (57605) |
| Plant Address | 1268 Poquonnock Rd, Groton, CT 6340 |
| Utility | Connecticut Mun Elec Engy Coop (4180) |
| Latitude, Longitude | 41.3469, -72.0411 |
| Generation Dates on File | Jan 2011 to Aug 2026 |
| Initial Operation Date | October 2010 |
| Annual Generation | 410.0 MWh |
| Fuel Types | Distillate Fuel Oil |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | NPCC |
| Balancing Authority | ISO New England Inc. (ISNE) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Groton Dept of Utilities - (CT) (7716) CT |
| Grid Voltage | 13.80 kV |
| Energy Storage | No |
Generator WT1 Details Operating October 2010
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2.5 MW |
| Winter Capacity | 2.5 MW |
| Minimum Load | 1.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator WT2 Details Operating October 2010
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2.5 MW |
| Winter Capacity | 2.5 MW |
| Minimum Load | 1.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Water Treatment 1 & 2 Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #592 | St Marys | St. Marys, OH | 434.0 MWh |
| #593 | Algona | Algona, IA | 449.0 MWh |
| #594 | C W Burdick | Grand Island, NE | 2.8 GWh |
| #595 | Suwannee River | Live Oak, FL | 58.5 GWh |
| #596 | Dominion/Lo Mar | Manassas, VA | 418.0 MWh |
| #597 | Craig (AK) | Craig, AK | 417.0 MWh |
| #598 | Orrtanna | Orrtanna, PA | 417.0 MWh |
| #599 | Lost Nation | Groveton, NH | 416.0 MWh |
| #600 | Godwin Drive Plant | Manassas, VA | 416.0 MWh |
| #601 | Ascutney | Weatherfield, VT | 411.0 MWh |
| #603 | Blue Lake | Shakopee, MN | 465.1 GWh |
| #604 | Belleville | Belleville, KS | 513.0 MWh |
| #605 | NYU LANGONE HEALTH | New York, NY | 46.5 GWh |
| #606 | Forest City Light Plant | Forest City, IA | 392.0 MWh |
| #607 | Greenwood (MI) | Avoca, MI | 1.8 TWh |
| #608 | Chesterfield Landfill Gas | Chester, VA | 457.0 MWh |
| #609 | Webster City | Webster City, IA | 383.2 MWh |
| #610 | LNG 1 & 2 | Norwich, CT | 382.0 MWh |
| #611 | Gary Court 1 & 2 | Groton, CT | 381.0 MWh |
| #612 | Lebanon Pines 1 & 2 | Lebanon, CT | 374.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Water Treatment 1 & 2.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Antares-GRE 314 East Lyme LLC | East Lyme, CT | 4.4 GWh | 11.1 mi |
| Bridge Street 1 & 2 | Groton, CT | 452.0 MWh | 2.4 mi |
| CMEEC - Navy NE Trident | Groton, CT | 1.2 GWh | 3.9 mi |
| CMEEC - Polaris Park Solar Hybrid | Gordon, CT | 4.5 GWh | 3 mi |
| Connecticut College | New London, CT | 10.1 GWh | 4 mi |
| Covanta Southeastern Connecticut Company | Preston, CT | 106.2 GWh | 9 mi |
| Fishers Island 1 | Fisher's Island, NY | 129.0 MWh | 5.6 mi |
| Fort Hill 1, 2, 3 & 4 | Uncasville, CT | 639.0 MWh | 9.1 mi |
| Foxwoods CoGen | Mashantucket, CT | 10.8 GWh | 9.7 mi |
| Gary Court 1 & 2 | Groton, CT | 381.0 MWh | 1.3 mi |
| Millstone | Waterford, CT | 17.0 TWh | 7 mi |
| Montville Station | Uncasville, CT | 133.2 GWh | 6.4 mi |
| Naval Sub Base New London Fuel Cell | Groton, CT | 29.9 GWh | 4.3 mi |
| North Stonington Solar Center, LLC | North Stonington, CT | 31.7 GWh | 11.7 mi |
| Pfizer Groton Fuel Cell | Groton, CT | 36.2 GWh | 1.8 mi |
| Pfizer Groton Plant | Groton, CT | 82.3 GWh | 2.2 mi |
| Rand Whitney CHP Plant | Montville, CT | 132.0 GWh | 8.8 mi |
| Subase Microgrid Project | Groton, CT | 29.6 GWh | 4.3 mi |
| White Rock Road LLC | Westerly, RI | 11.5 GWh | 11.1 mi |
| Yale New Haven - New London | New London, CT | 14.0 GWh | 3.4 mi |