Cimarron Wind Energy LLC
10001 19 Road, Cimmaron, KS 67384Plant Summary Information
Cimarron Wind Energy LLC is ranked #42 out of 174 power plants in Kansas in terms of total annual net electricity generation.
Cimarron Wind Energy LLC generated 82.3 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Cimarron Wind Energy LLC |
|---|---|
| Utility Name | Cimarron Wind Energy LLC |
| Location | Gray County, KS |
| Initial Operation Date | November 2012 |
| Last Update | Dec 2025 |
| Annual Generation | 382.9 GWh |
| Annual Consumption | 1.4 M MMBtu |
| Ranked #1,644 out of 12,613 Power Plants Nationwide | |
| Ranked #471 out of 1,374 Wind Power Plants Nationwide | |
| Ranked #42 out of 174 Kansas Power Plants | |
| Ranked #33 out of 52 Kansas Wind Power Plants | |
| Fuel Types | Wind |
Map of Cimarron Wind Energy LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cimarron Wind Energy LLC.
Monthly Net Generation for Cimarron Wind Energy LLC
Monthly Plant Fuel Consumption for Cimarron Wind Energy LLC
Cimarron Wind Energy LLC Details
| Summary Information | |
|---|---|
| Plant Name | Cimarron Wind Energy LLC (57762) |
| Plant Address | 10001 19 Road, Cimmaron, KS 67384 |
| Utility | Cimarron Wind Energy LLC (58143) |
| Latitude, Longitude | 37.87389, -100.28028 |
| Generation Dates on File | Dec 2012 to Dec 2025 |
| Initial Operation Date | November 2012 |
| Annual Generation | 382.9 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Tennessee Valley Authority (18642) TN |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator CPV1 Details Operating November 2012
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 165.6 MW |
| Summer Capacity | 165.6 MW |
| Winter Capacity | 165.6 MW |
| Minimum Load | 8.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2012 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 72 |
| Turbine Details | |
| Number Of Turbines | 72 |
|---|---|
| Predominant Turbine Manufacturer | Siemens |
| Predominant Turbine Model Number | SWT-2.3-108 |
| Design Wind Speed | 14 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 297 |
Cimarron Wind Energy LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #461 | Osceola Windpower LLC | Harris, IA | 393.8 GWh |
| #462 | Shiloh Wind Project 2 LLC | Birds Landing, CA | 393.1 GWh |
| #463 | Coyote Ridge | White, SD | 393.0 GWh |
| #464 | Skookumchuck Wind Facility | Rainier, WA | 392.8 GWh |
| #465 | Shiloh I Wind Project | Rio Vista, CA | 389.6 GWh |
| #466 | Voyager Wind I | Mojave, CA | 388.9 GWh |
| #467 | Fenton Wind Farm | Chandler, MN | 387.9 GWh |
| #468 | Anticline Wind | Casper, WY | 386.9 GWh |
| #469 | New Frontier Wind | Ruso, ND | 386.8 GWh |
| #470 | Pegasus Wind | Reese, MI | 386.8 GWh |
| #472 | Pocahontas Prairie Wind Farm | Pomeroy, IA | 382.0 GWh |
| #473 | Wildhorse Mountain Wind Facility | Clayton, OK | 381.9 GWh |
| #474 | Baldwin Wind LLC | Wilton, ND | 381.1 GWh |
| #475 | Quilt Block Wind Farm LLC | Darlington, WI | 381.1 GWh |
| #476 | Pine River Wind Park | Shepherd, MI | 380.6 GWh |
| #477 | Grand Meadow | Dexter, MN | 380.3 GWh |
| #478 | Lost Creek Wind Energy Facility | King City, MO | 380.3 GWh |
| #479 | Oliver Wind III, LLC | Mandan, ND | 380.1 GWh |
| #480 | Alta Wind X | Mojave, CA | 379.0 GWh |
| #481 | Trimont Area Wind Farm | Trimont, MN | 378.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cimarron Wind Energy LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bloom Wind | Minneola, KS | 582.3 GWh | 33.1 mi |
| Bonanza BioEnergy LLC | Garden City, KS | 6.6 GWh | 30.9 mi |
| Buffalo Dunes Wind Project | Satanta, KS | 785.2 GWh | 46.9 mi |
| Cimarron Bend III | Minneola, KS | 588.8 GWh | 38.1 mi |
| Cimarron Bend Wind Project I, LLC | Minneola, KS | 747.5 GWh | 39.2 mi |
| Cimarron Bend Wind Project II, LLC | Minneola, KS | 766.2 GWh | 39.2 mi |
| Cimarron Windpower II | Cimarron, KS | 284.9 GWh | 5.3 mi |
| Ensign Wind LLC | Montezuma, KS | 464.2 GWh | 17.9 mi |
| Fort Dodge | Dodge City, KS | 44.0 GWh | 20.5 mi |
| Garden City | Garden City, KS | 68.2 GWh | 34.2 mi |
| Gray County Wind Energy | Montezuma, KS | 264.1 GWh | 18.8 mi |
| Holcomb | Holcomb, KS | 1.8 TWh | 37.9 mi |
| Iron Star Wind Project | Dodge City, KS | 1.2 TWh | 22.6 mi |
| Ironwood Wind | Spearville, KS | 251.7 GWh | 27.8 mi |
| Jameson Energy Center | Garden City, KS | 2.6 GWh | 30.5 mi |
| Jetmore | Jetmore, KS | 117.0 MWh | 25.4 mi |
| Meade | Meade, KS | 85.0 MWh | 40.8 mi |
| Spearville | Ford, KS | 133.6 GWh | 28.8 mi |
| Spearville 3 LLC | Spearville, KS | 170.4 GWh | 24.2 mi |
| Western Plains Wind Farm | Spearville, KS | 1.0 TWh | 32.8 mi |