North Hurlburt Wind LLC
76288 Rhea Road, Arlington, OR 97812Plant Summary Information
North Hurlburt Wind LLC is ranked #23 out of 274 power plants in Oregon in terms of total annual net electricity generation.
North Hurlburt Wind LLC generated 82.7 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | North Hurlburt Wind LLC |
|---|---|
| Utility Name | Caithness Shepherds Flat LLC |
| Location | Gilliam County, OR |
| Initial Operation Date | February 2012 |
| Last Update | Feb 2026 |
| Annual Generation | 529.0 GWh |
| Annual Consumption | 1.9 M MMBtu |
| Ranked #1,293 out of 12,637 Power Plants Nationwide | |
| Ranked #342 out of 1,376 Wind Power Plants Nationwide | |
| Ranked #23 out of 274 Oregon Power Plants | |
| Ranked #7 out of 50 Oregon Wind Power Plants | |
| Fuel Types | Wind |
Map of North Hurlburt Wind LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for North Hurlburt Wind LLC.
Monthly Net Generation for North Hurlburt Wind LLC
Monthly Plant Fuel Consumption for North Hurlburt Wind LLC
North Hurlburt Wind LLC Details
| Summary Information | |
|---|---|
| Plant Name | North Hurlburt Wind LLC (57526) |
| Plant Address | 76288 Rhea Road, Arlington, OR 97812 |
| Utility | Caithness Shepherds Flat LLC (56865) |
| Latitude, Longitude | 45.73161, -120.08347 |
| Generation Dates on File | Feb 2012 to Feb 2026 |
| Initial Operation Date | February 2012 |
| Annual Generation | 529.0 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG09-82-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Bonneville Power Administration (BPAT) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Bonneville Power Administration (1738) OR |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator NORTH Details Operating February 2012
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 265 MW |
| Summer Capacity | 265 MW |
| Winter Capacity | 265 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 2012 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 106 |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 106 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 2.5-127 |
| Design Wind Speed | 26.8 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 279 |
North Hurlburt Wind LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #332 | Wagon Wheel Wind | OK | 544.7 GWh |
| #333 | Manzana Wind LLC | Rosamond, CA | 543.7 GWh |
| #334 | Blue Canyon Windpower II | Carnegie, OK | 543.1 GWh |
| #335 | Broadview Energy KW, LLC | Texico, NM | 540.1 GWh |
| #336 | FPL Energy Story Wind LLC | Zearing, IA | 537.9 GWh |
| #337 | Alta Farms II Wind Project, LLC | Clinton, IL | 536.6 GWh |
| #338 | Wheatridge Hybrid | Morrow, OR | 657.1 GWh |
| #339 | Cranell Wind Farm LLC | TBD, TX | 536.2 GWh |
| #340 | Minco Wind IV, LLC | Hinton, OK | 535.2 GWh |
| #341 | Fluvanna | Fluvanna, TX | 534.3 GWh |
| #343 | Panther Creek Wind Farm I | Big Spring, TX | 528.8 GWh |
| #344 | Century Oak Wind Project, LLC | Cisco, TX | 527.0 GWh |
| #345 | TX Hereford Wind | Hereford, TX | 526.4 GWh |
| #346 | Kossuth | Lu Verne, IA | 524.3 GWh |
| #347 | Babbitt Ranch Energy Center | Flagstaff, AZ | 522.7 GWh |
| #348 | Thunder Spirit Wind, LLC | Hettinger, ND | 522.6 GWh |
| #349 | South Fork Wind | East Hampton, NY | 522.3 GWh |
| #350 | Chapman Ranch Wind I | Corpus Christi, TX | 518.0 GWh |
| #351 | Spinning Spur Wind II | Adrian, TX | 516.4 GWh |
| #352 | Astra Wind Farm | Happy, TX | 515.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding North Hurlburt Wind LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arlington Wind Power Project | Arlington, OR | 201.0 GWh | 5.8 mi |
| Big Horn Wind II | Bickleton, WA | 104.6 GWh | 16.8 mi |
| Big Horn Wind Project | Bickelton, WA | 479.4 GWh | 14.7 mi |
| Carty Generating Station | Boardman, OR | 3.3 TWh | 13.2 mi |
| Harvest Wind Project | Roosevelt, WA | 263.7 GWh | 13.9 mi |
| Horseshoe Bend Wind LLC | Arlington, OR | 593.9 GWh | 10.7 mi |
| Juniper Canyon I Wind Project | Bickleton, WA | 121.1 GWh | 15 mi |
| Leaning Juniper | Arlington, OR | 275.2 GWh | 8.2 mi |
| Leaning Juniper Wind Power II | Arlington, OR | 416.6 GWh | 10.2 mi |
| Lund Hill Solar | Bickleton, WA | 359.4 GWh | 17 mi |
| Montague Solar | Arlington, OR | 367.7 GWh | 14 mi |
| Montague Wind Power Facility LLC | Arlington, OR | 479.6 GWh | 10.1 mi |
| Pebble Springs Wind LLC | Wasco, OR | 219.0 GWh | 2.4 mi |
| South Hurlburt Wind LLC | Arlington, OR | 565.5 GWh | 1.8 mi |
| Threemile Canyon | Boardman, OR | 22.4 GWh | 8 mi |
| Threemile Digester | Boardman, OR | 36.4 GWh | 8.9 mi |
| Waste Management Columbia Ridge LFGTE | Arlington, OR | 55.3 GWh | 15 mi |
| Wheat Field Wind Power Project | Arlington, OR | 198.0 GWh | 12 mi |
| White Creek Wind Farm | Roosevelt, WA | 563.7 GWh | 13.7 mi |
| Willow Creek Energy Center | Lone, OR | 168.7 GWh | 7 mi |