Sigel Wind Park
1717 Minden Rd, Harbor Beach, MI 48441Plant Summary Information
Sigel Wind Park is ranked #45 out of 263 power plants in Michigan in terms of total annual net electricity generation.
Sigel Wind Park generated 39.7 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | Sigel Wind Park |
|---|---|
| Utility Name | DTE Electric Company |
| Location | Huron County, MI |
| Initial Operation Date | December 2012 |
| Last Update | Oct 2025 |
| Annual Generation | 250.1 GWh |
| Annual Consumption | 939.0 k MMBtu |
| Ranked #2,215 out of 12,553 Power Plants Nationwide | |
| Ranked #668 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #45 out of 263 Michigan Power Plants | |
| Ranked #19 out of 34 Michigan Wind Power Plants | |
| Fuel Types | Wind |
Map of Sigel Wind Park
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sigel Wind Park.
Monthly Net Generation for Sigel Wind Park
Sigel Wind Park Details
| Summary Information | |
|---|---|
| Plant Name | Sigel Wind Park (57851) |
| Plant Address | 1717 Minden Rd, Harbor Beach, MI 48441 |
| Utility | DTE Electric Company (5109) |
| Latitude, Longitude | 43.85083, -82.78361 |
| Generation Dates on File | Dec 2012 to Oct 2025 |
| Initial Operation Date | December 2012 |
| Annual Generation | 250.1 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | RFC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | ITC Transmission (56068) MI |
| Grid Voltage | 120.00 kV |
| Energy Storage | No |
Generator 1 Details Operating December 2012
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 64 MW |
| Summer Capacity | 64 MW |
| Winter Capacity | 64 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2012 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 40 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 40 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.6-100 |
| Design Wind Speed | 17 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 328 |
Sigel Wind Park Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #658 | South Trent Wind Farm | Sweetwater, TX | 252.5 GWh |
| #659 | San Roman Wind I, LLC | Los Fresnos, TX | 252.1 GWh |
| #660 | Apple Blossom Wind Farm | Pigeon, MI | 252.1 GWh |
| #661 | Ironwood Wind | Spearville, KS | 251.7 GWh |
| #662 | Pheasant Run Wind LLC | Pigeon, MI | 251.5 GWh |
| #663 | Minco Wind II, LLC | Minco, OK | 251.0 GWh |
| #664 | Smoky Hills Wind Project Phase I | Lincoln, KS | 250.8 GWh |
| #665 | Notrees Windpower Hybrid | Goldsmith, TX | 246.2 GWh |
| #666 | Rockland Wind Farm | American Falls, ID | 250.6 GWh |
| #667 | Blackstone Wind Farm LLC | Ransom, IL | 250.1 GWh |
| #669 | Brookfield | Pigeon, MI | 249.6 GWh |
| #670 | Wheatridge 1 | Lexington, OR | 249.5 GWh |
| #671 | Cassadaga Wind Farm | Cherry Creek, NY | 249.0 GWh |
| #672 | Rising Tree Wind Farm | Mojave, CA | 249.0 GWh |
| #673 | Sandy Ridge Wind 2, LLC | Tyrone, PA | 248.2 GWh |
| #674 | Hancock County Wind Energy Center | Garner, IA | 247.4 GWh |
| #675 | Golden Hills Wind | Livermore, CA | 247.4 GWh |
| #676 | Red Barn Energy | Montfort, WI | 247.3 GWh |
| #677 | Beech Ridge Energy LLC | Rupert, WV | 247.0 GWh |
| #678 | Farmers City Wind LLC | Tarkio, MO | 246.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sigel Wind Park.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Apple Blossom Wind Farm | Pigeon, MI | 252.1 GWh | 26.6 mi |
| Big Turtle Wind Farm 2 | Harbor Beach, MI | 106.9 GWh | 4.8 mi |
| Big Turtle Wind Farm, LLC | Harbor Beach, MI | 69.9 GWh | 0.1 mi |
| Brookfield | Pigeon, MI | 249.6 GWh | 26.4 mi |
| Caro | Caro, MI | 5.9 MWh | 38 mi |
| Deerfield Wind Energy 2 | Port Hope, MI | 307.5 GWh | 7 mi |
| Deerfield Wind Energy, LLC | Kinde, MI | 471.9 GWh | 8.5 mi |
| Echo Wind Park | Elkton, MI | 569.4 GWh | 18.9 mi |
| Harvest | Elkton, MI | 115.8 GWh | 21.1 mi |
| Harvest 2 | Elkton, MI | 201.8 GWh | 19.1 mi |
| Main Street (MI) | Sebewaing, MI | 1.0 MWh | 34.4 mi |
| McKinley Wind Park | Pigeon, MI | 51.3 GWh | 22.9 mi |
| Michigan Wind 1 | Ubly, MI | 157.5 GWh | 13.3 mi |
| Michigan Wind 2 | Minden City, MI | 326.6 GWh | 13.1 mi |
| Minden Wind Park | Minden City, MI | 109.0 GWh | 12.6 mi |
| MSC Sebewaing | Sebewaing, MI | 569.0 MWh | 34 mi |
| Pheasant Run Wind LLC | Pigeon, MI | 251.5 GWh | 26.4 mi |
| Pine Street | Sebewaing, MI | 14.3 GWh | 34.1 mi |
| Ubly | Ubly, MI | 11.8 MWh | 11.8 mi |
| Wilmot | Kingston Twp, MI | 341.0 MWh | 33.9 mi |