36600 29 Mile Road, Lenox, MI 48048Plant Summary Information
Pine Tree Acres WM LFGTE is ranked #11 out of 293 landfill gas power plants nationwide in terms of total annual net electricity generation.
Pine Tree Acres WM LFGTE is comprised of 8 generators and generated 19.4 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Pine Tree Acres WM LFGTE |
|---|---|
| Utility Name | WM Renewable Energy LLC |
| Location | Macomb County, MI |
| Initial Operation Date | March 2012 |
| Last Update | Sep 2025 |
| Annual Generation | 78.5 GWh |
| Annual Consumption | 965.8 k MMBtu |
| Ranked #3,650 out of 12,539 Power Plants Nationwide | |
| Ranked #11 out of 293 Landfill Gas Power Plants Nationwide | |
| Ranked #88 out of 263 Michigan Power Plants | |
| Ranked #1 out of 23 Michigan Landfill Gas Power Plants | |
| Fuel Types | Landfill Gas |
Map of Pine Tree Acres WM LFGTE
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pine Tree Acres WM LFGTE.
Monthly Net Generation for Pine Tree Acres WM LFGTE
Pine Tree Acres WM LFGTE Details
| Summary Information | |
|---|---|
| Plant Name | Pine Tree Acres WM LFGTE (57443) |
| Plant Address | 36600 29 Mile Road, Lenox, MI 48048 |
| Utility | WM Renewable Energy LLC (54842) |
| Latitude, Longitude | 42.765, -82.74556 |
| Generation Dates on File | Mar 2012 to Sep 2025 |
| Initial Operation Date | March 2012 |
| Annual Generation | 78.5 GWh |
| Fuel Types | Landfill Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | ITC Transmission (56068) MI |
| Grid Voltage | 120.00 kV |
| Energy Storage | No |
Generator GEN1 Details Operating March 2012
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DECO.PINE_TREE |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | DECO.PINE_TREE |
| Nameplate Capacity | 1.6 MW |
| Nameplate Power Factor | 0.98 |
| Summer Capacity | 1.6 MW |
| Winter Capacity | 1.6 MW |
| Minimum Load | 0.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2012 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating March 2012
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DECO.PINE_TREE |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | DECO.PINE_TREE |
| Nameplate Capacity | 1.6 MW |
| Nameplate Power Factor | 0.98 |
| Summer Capacity | 1.6 MW |
| Winter Capacity | 1.6 MW |
| Minimum Load | 0.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2012 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GEN3 Details Operating March 2012
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DECO.PINE_TREE |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | DECO.PINE_TREE |
| Nameplate Capacity | 1.6 MW |
| Nameplate Power Factor | 0.98 |
| Summer Capacity | 1.6 MW |
| Winter Capacity | 1.6 MW |
| Minimum Load | 0.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2012 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GEN4 Details Operating March 2012
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DECO.PINE_TREE |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | DECO.PINE_TREE |
| Nameplate Capacity | 1.6 MW |
| Nameplate Power Factor | 0.98 |
| Summer Capacity | 1.6 MW |
| Winter Capacity | 1.6 MW |
| Minimum Load | 0.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2012 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GEN5 Details Operating March 2012
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DECO.PINE_TREE |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | DECO.PINE_TREE |
| Nameplate Capacity | 1.6 MW |
| Nameplate Power Factor | 0.98 |
| Summer Capacity | 1.6 MW |
| Winter Capacity | 1.6 MW |
| Minimum Load | 0.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2012 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GEN6 Details Operating March 2012
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DECO.PINE_TREE |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | DECO.PINE_TREE |
| Nameplate Capacity | 1.6 MW |
| Nameplate Power Factor | 0.98 |
| Summer Capacity | 1.6 MW |
| Winter Capacity | 1.6 MW |
| Minimum Load | 0.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2012 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GEN7 Details Operating March 2012
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DECO.PINE_TREE |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | DECO.PINE_TREE |
| Nameplate Capacity | 1.6 MW |
| Nameplate Power Factor | 0.98 |
| Summer Capacity | 1.6 MW |
| Winter Capacity | 1.6 MW |
| Minimum Load | 0.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2012 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GEN8 Details Operating March 2012
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DECO.PINE_TREE |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | DECO.PINE_TREE |
| Nameplate Capacity | 1.6 MW |
| Nameplate Power Factor | 0.98 |
| Summer Capacity | 1.6 MW |
| Winter Capacity | 1.6 MW |
| Minimum Load | 0.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2012 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Pine Tree Acres WM LFGTE Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1 | Brea Expansion Plant | Brea, CA | 235.5 GWh |
| #2 | Bowerman Power LFG, LLC | Irvine, CA | 153.5 GWh |
| #3 | Puente Hills Energy Recovery | Whittier, CA | 151.3 GWh |
| #4 | Johnston LFG Turbine Plant | Johnston, RI | 148.5 GWh |
| #5 | Sunshine Gas Producers | Sylmar, CA | 121.2 GWh |
| #6 | Middlesex County Utilities Authority | Sayreville, NJ | 108.3 GWh |
| #7 | Ameresco Ox Mountain | Half Moon Bay, CA | 81.3 GWh |
| #8 | Metro Methane Recovery Facility | Mitchellville, IA | 80.3 GWh |
| #9 | Omega Hills Gas Recovery | Germantown, WI | 80.1 GWh |
| #10 | Waste Management King George LFGTE | King George, VA | 79.6 GWh |
| #12 | High Acres Gas Recovery | Fairport, NY | 70.0 GWh |
| #13 | Ontario LFGTE | Stanley, NY | 68.5 GWh |
| #14 | Concord Energy | Concord, NC | 64.4 GWh |
| #15 | Ocean County Landfill | Manchester, NJ | 64.3 GWh |
| #16 | Livingston Generating Facility | Pontiac, IL | 63.5 GWh |
| #17 | Sumpter Energy Associates | Belleville, MI | 63.4 GWh |
| #18 | Pine Tree Acres | Lenox Twp, MI | 63.3 GWh |
| #19 | Potrero Hills Energy Producers | Suisun City, CA | 58.7 GWh |
| #20 | King & Queen | Little Plymouth, VA | 59.9 GWh |
| #21 | Seneca Energy | Seneca Falls, NY | 56.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pine Tree Acres WM LFGTE.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Belle River | China Twp, MI | 7.5 TWh | 12.7 mi |
| Blue Water Energy Center | East China, MI | 8.3 TWh | 13.5 mi |
| Blue Water Renewables Inc | Kimball Township, MI | 18.4 GWh | 12.9 mi |
| Corewell Health Dearborn Campus | Dearborn, MI | 30.0 MWh | 40.4 mi |
| Dean | East China, MI | 770.1 GWh | 13.4 mi |
| Dearborn Energy Center | Dearborn, MI | 247.3 GWh | 40.7 mi |
| Dearborn Industrial Generation | Dearborn, MI | 4.0 TWh | 38.1 mi |
| Delray | Detroit, MI | 91.1 GWh | 37.2 mi |
| Demille Solar Farm | Lapeer, MI | 36.0 GWh | 35.3 mi |
| Eagle Valley (MI) | Orion, MI | 22.9 GWh | 26.4 mi |
| Greenwood (MI) | Avoca, MI | 983.9 GWh | 23.7 mi |
| Greenwood Solar Farm | Avoca, MI | 1.8 GWh | 23.7 mi |
| Hancock | Commerce Twp, MI | 9.2 GWh | 38.4 mi |
| MSC Croswell | Croswell, MI | 35.9 MWh | 35.2 mi |
| Northeast (MI) | Warren, MI | 5.9 GWh | 26.4 mi |
| O'Shea Solar Farm | Detroit, MI | 3.0 GWh | 35.4 mi |
| Pine Tree Acres | Lenox Twp, MI | 63.3 GWh | 0.1 mi |
| St Clair | East China Twp, MI | 4.4 GWh | 13.9 mi |
| Turrill Solar Farm | Lapeer, MI | 25.2 GWh | 34.1 mi |
| Wyandotte | Wyandotte, MI | 89.0 MWh | 43.5 mi |